Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Little Qualicum River Erosion Protection

Closed
BC228998Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract includes a comprehensive suite of airfield infrastructure upgrades at the Port of Seattle, focusing on critical safety and operational improvements. Key elements involve replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signage to enhance visibility and energy efficiency, while also upgrading failing pavement sections and essential utilities to ensure structural integrity and long-term reliability. Wildlife hazard mitigation is a major component, requiring the removal of turf edge dams along runways and taxiways, installation of anti-perching devices on airfield signs to deter birds, and comprehensive stormwater management through regrading and new drainage infrastructure to eliminate ponding that attracts wildlife. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid, unobstructed access for emergency response teams. All work is part of a larger, coordinated initiative under the Airfield 2029 All Projects program, aimed at modernizing the airport’s ground infrastructure to meet operational and safety standards. The project is managed by the Aviation Project Management Group within the Port of Seattle, with Yanet Maldonado serving as the primary point of contact. Though the solicitation is currently posted as a forecast, the scope indicates a significant investment in airfield resilience, combining electrical, civil, environmental, and emergency response improvements in a single integrated effort to support the long-term functionality and safety of the airfield.
Aviation Project Management Group

POSTED

16 minutes ago

DEADLINE

N/A
NAICS: 237990
New
SLED
Jack Block Park Pier ReplacementThe contract involves the complete demolition of the aging, end-of-life pier at Jack Block Park and the construction of a new pier structure to replace it, along with necessary repairs to the surrounding pier plaza to ensure structural integrity and functionality. This project is managed by the Port of Seattle under the Northwest Seaport Alliance, targeting infrastructure renewal in a publicly used waterfront area. The work will require careful planning and execution to minimize disruption to park users and surrounding maritime operations, with all activities governed by applicable environmental and safety regulations. The North American Industry Classification System code 237990 indicates the scope falls under other heavy and civil engineering construction, encompassing substantial marine construction efforts. Primary point of contact for the procurement is Yanet Maldonado, reachable at the Port of Seattle, with Valerie Huffman serving as the project manager for ongoing coordination and oversight. The solicitation was posted in July 2026, signaling an upcoming competitive bidding phase for qualified contractors with experience in marine infrastructure. While no set-aside designation has been specified, bidders are encouraged to review the official solicitation portal for detailed requirements, timelines, and submission guidelines. The place of performance is fixed at Jack Block Park, and no additional office or location details are provided beyond the broader agency affiliation with the Port of Seattle.
Northwest Seaport Alliance (NWSA)

POSTED

16 minutes ago

DEADLINE

N/A

AI Contract Overview

Show more

The Town of Qualicum Beach is soliciting qualified contractors for the Little Qualicum River Erosion Protection project located south of Waters Road, aimed at safeguarding a critical municipal watermain from active riverbank erosion. The scope of work includes constructing four in-stream rock spurs, along with site clearing, area isolation, excavation, rock placement, installation of large woody debris, implementation of erosion and sediment controls, bank reinstatement, and riparian restoration through native planting. This is a highly regulated undertaking requiring specialized expertise in in-stream construction and ecological restoration, with strict environmental compliance expected throughout the project timeline. Contractors must demonstrate proven experience in similar aquatic and riparian environments to be considered eligible. All bids must be submitted by 10:00 p.m. PST on June 3, 2026, under solicitation number BC228998, and attendance at a mandatory site visit on May 13, 2026, at 2:00 p.m. PST at the project location is required for all proposing parties, with sign-in verification enforced. The project is publicly advertised through the Government of Canada’s procurement portal, and while the contracting authority is listed as the Town of Qualicum Beach, the procurement system categorizes it under the Federal agency framework. Proposals should address technical capability, environmental stewardship, and adherence to timelines, with clear plans for minimizing ecological disturbance and ensuring long-term bank stability.

General Info

Construct four in-stream rock spurs to protect watermain; mandatory site visit, environmental compliance, bids due June 3, 2026.

Agency

Government of Canada → Town of Qualicum Beach

NAICS

237990 - Other Heavy and Civil Engineering Construction View NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Town of Qualicum Beach
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Town of Qualicum Beach
Office AddressN/A
Contacts
Contracting Authority

Full Description

Show more
The Town of Qualicum Beach is seeking qualified contractors to complete the Little Qualicum River Erosion Protection project south of Waters Road in Qualicum Beach, BC. The work involves stabilizing an actively eroding riverbank that is threatening a buried municipal watermain by constructing four in-stream rock spurs, along with associated clearing, isolation of work areas, excavation, rock placement, large woody debris installation, erosion and sediment control, bank reinstatement, and riparian restoration planting. This project is time-sensitive, environmentally regulated, and suited to contractors with experience in in-stream works and riparian restoration. A mandatory site visit is scheduled for 2:00:00 p.m. PST on May 13, 2026, at Little Qualicum River at the south end of Waters Road in Qualicum Beach, BC. Contractors will be required to sign an attendance sheet.