Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Livingston 1,2,3 - TCP Removal Treatment System Project

Forecast
2410004-004CState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The State Water Resources Control Board is serving as the Responsible Agency for the Livingston 1, 2, 3 – Trichloropropane Removal Treatment System Project, which is being funded by the Board under internal project number 2410004-004C. The initiative involves building two centralized treatment facilities to remove 1,2,3-Trichloropropane (TCP) from drinking water, one located at Arakelian Park and the other at Well No. 8. At Arakelian Park, the project includes a one million gallon storage tank and a 6,000 gallons per minute booster pump station, while the Well No. 8 site will feature a larger 1.5 million gallon storage tank and a 4,500 gallons per minute booster pump station. Approximately 6,300 feet of new water pipelines will connect these facilities to the existing distribution system to ensure effective treatment and delivery of purified water. The City of Livingston is the lead agency for implementation, with oversight and funding provided by the State Water Board. The project is listed as a forecast in the state procurement system, posted on May 29, 2026, with the primary point of contact being Miguel Galvez, City Planner for Livingston, and Cedric Irving, Environmental Scientist with the State Water Board, serving as a secondary contact. The project is located in Livingston, California, and will address significant water quality concerns related to TCP contamination by delivering a permanent, large-scale treatment solution for the community’s water supply.

General Info

State Water Board funds Livingston, CA two-treatment-facility project to remove TCP from drinking water.

Agency

California → City of Livingston

Place of Performance

Livingston, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Livingston
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Livingston
Office AddressN/A
Contacts
Cedric IrvingEnvironmental Scientist
Miguel GalvezCity Planner

Full Description

Show more
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board is funding the Project referred to internally as Livingston 1, 2, 3 – Trichloropropane Removal Treatment System Project. The Project includes the construction of two centralized 1,2,3-Trichloropropane (TCP) treatment plants (one at the Arakelian Park site and another at the Well No. 8 site) and approximately 6,300 feet of connecting water pipelines. At Arakelian Park, the Project includes construction of a new one million gallon (MG) storage tank, and a 6,000 gallons per minute (gpm) booster pump station. At Well No. 8 site, a 1.5 MG storage tank and a 4,500-gpm booster pump station will be constructed. PROJECT NUMBER: 2410004-004C

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To achieve a fully functional system, the project requires a wide array of materials and services, including AC paving, trucking, jack and bore operations, cold planing, piping and fittings, traffic control, demolition, and preconstruction video services. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the project bid documents and specifications provided via the Inland Empire Utilities Agency bidding website.
Norstar Plumbing and Engineering, Inc

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS