Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LNVA - Simon Canal at FM 1663 & Olede Canal at FM 1410 Crossing Improvements

Closed
6aa40dc9e224e48c69d71e8dState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
Bonniebrook Water Service Lateral Reconnection
Solicitation # UH21004
The City of Stockton is soliciting bids for the Bonniebrook Water Service Lateral Reconnection project (UH21004), which involves the installation of approximately 300 linear feet of 1-inch potable water service lines using Horizontal Directional Drilling (HDD). The scope of work covers six residential homes along Bonniebrook Drive, between Woodside Drive and Fernvale Drive, in Stockton, California. The contractor is responsible for all labor, materials, and equipment required to extend service lines from new water meter boxes in residential front yards to existing potable water systems. Key deliverables include HDD installation, residential service transfer, capping and abandoning existing services, testing, flushing, disinfection, commissioning, and final surface restoration and cleanup. The contract will be awarded to the lowest responsive and responsible bidder based on the total price of the base bid and any selected alternates. Bidders must submit sealed envelopes containing official bid documents, a non-collusion declaration, and bid security. The successful contractor must provide both a Faithful Performance Bond and a Labor and Materials Bond, each for 100 percent of the contract bid price, issued by a company authorized in the State of California. Additionally, the contractor must adhere to prevailing wage rates and Title VI non-discrimination requirements. All work and materials are subject to inspection by the Construction Manager, and no work may be concealed without prior approval. Materials must be stored according to manufacturer instructions and hazardous materials must be handled in accordance with Material Safety Data Sheets and federal, state, and local regulations.
City of Stockton

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The Lower Neches Valley Authority is soliciting bids for crossing improvements at two project sites located in Chambers County, Texas. The scope of work includes the Simon Canal Crossing Improvements at FM 1663, which requires the installation of four 60 inch Hobas pipes and a concrete headwall, as well as the Olede Canal Crossing Improvements at FM 1410, involving the installation of three 60 inch Hobas pipes and a concrete check structure. The response deadline for this solicitation is October 8, 2026, at 4:00 PM. Interested parties should direct inquiries to the primary point of contact, Victoria Dai, regarding this local agency project.

General Info

Bids for Chambers County canal crossing improvements due October 8, 2026.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Bonniebrook Water Service Lateral ReconnectionOpen now, due in 31 days
  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Lower Neches Valley Authority
Contacts1 person available
OfficeN/A

Full Description

Show more
The Project consists of two (2) project sites located in Chambers County, Texas. The Simon Canal Crossing Improvements at FM 1663 generally consists of installing four (4) – 60" Hobas pipe and constructing a concrete headwall. The Olede Canal Crossing Improvements at FM 1410 generally consists of installing three (3) – 60” Hobas pipe and constructing a concrete check structure.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS