Los Banos Creek Recharge and Recovery Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Los Banos Creek Recharge and Recovery Project, led by the San Luis Water District in Merced County, California, utilizes existing gravel pits known as the Central and Southern Basins to capture, store, recharge, and bank Central Valley Project, Warren Act, and Los Banos Creek flood waters. The project serves four primary functions: surface water storage for agricultural demand, groundwater recharge to improve sustainability, groundwater recovery during drought conditions in compliance with the Sustainable Groundwater Management Act of 2014, and the capture of flood waters during declared emergencies. The Central Basin covers approximately 85 acres with a 1,000 acre-feet capacity, while the Southern Basin covers 51 acres with an expected 800 acre-feet capacity upon completion of mining operations. Infrastructure development includes constructing two water transfer facilities between the basins and the Delta-Mendota Canal, as well as a weir and diversion structure on Los Banos Creek. The project also involves contouring the basin bottoms and improving bank stability. Environmental compliance is managed through a Mitigated Negative Declaration under the California Environmental Quality Act, with specific requirements for archaeological monitoring during ground-disturbing activities and strict laboratory standards for water quality analysis approved by Reclamation. The project is supported by a 20-year License Agreement with Vulcan Materials Company and is funded through the Department of Water Resources Sustainable Groundwater Management Act Implementation Grant, with an estimated construction timeline of 12 months.

General Info

San Luis Water District project for water storage, groundwater recharge, and flood capture.

Agency

California → San Luis Water District

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Los Banos, CA

Set-Aside

NONE

Documents

(6)

Los Banos Creek Recharge and Recovery Project Notice of Completion

PDFnotice-of-completion

Los Banos Creek Recharge and Recovery Project SCH Summary

PDFenvironmental-summary

2025110036 DWR Comment Letter on Los Banos Creek Recharge Project

PDFcomment-letter

Los Banos Creek Recharge and Recovery Project Draft Initial Study/Mitigated Negative Declaration Oct 2025

PDFinitial-study-mnd

SLWD Los Banos Creek Recharge and Recovery Project Notice of Determination

PDFnotice-of-determination

San Luis Water District Los Banos Creek Recharge Project NOI

PDFnotice-of-intent

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Luis Water District
Office AddressN/A
Contacts
Steve StadlerDistrict Engineer

Interested Companies (1)

Show more
Provost & Pritchard Consulting Group
Clovis, CA

Full Description

Show more
The Project entails using existing gravel pits (basins), designated as the Central Basin and the Southern Basin, to capture, store, recharge, and bank CVP and Warren Act water and/or Los Banos creek flood waters. The Central Basin is approximately 85 acres and has the capacity to store approximately 1,000 acre-feet. The Southern Basin is approximately 51 acres and is expected to store approximately 800 acre-feet upon completion of mining operations. The Basins will serve four purposes: 1. Surface Water Storage Conveyed using the DMC, CVP and Warren Act water will be stored during the winter months and returned to the DMC in the spring to serve agricultural demand. Some of the return water may be exchange with Reclamation to serve agricultural demands from the San Luis Canal. CVP water may be transferred to SLWD from other CVP contractors for short term storage, and the return transfer will take place in a subsequent water year, typically the next water year. In most cases the transfer(s) will be conducted using the Accelerated Water Transfer Program. 2. Groundwater Recharge The Central Delta Mendota Groundwater Sustainability Agency is developing groundwater management policies. It is expected that policies will be developed to encourage recharge and other actions that will improve groundwater sustainability. The basins will be operated to achieve both their maximum storage and recharge potential. Assuming a conservative daily infiltration rate of 0.5 inches per day, the Central Basin can recharge over a 90-day period approximately 242 acre-feet. Using the same assumptions, the Southern Basin can recharge approximately 208 acre-feet. Evaporation losses will be calculated using data from the California Irrigation Management Information System and deducted from the daily surface volume to calculate net recharge. SLWD will consider transfers of surface water for recharge by other contractors to help improve basin wide groundwater sustainability. These types of transfers for recharge will typically be conducted by CVP water contractors within the Delta Mendota Sub-Basin. 3. Groundwater Recovery When drought conditions occur, SLWD may extract, or effectively recover, a portion of the water recharged in the Central and Southern Basins and introduce the water into the Delta-Mendota Canal. Recovery of the recharged water will comply with the Delta-Mendota Subbasin Groundwater Sustainability Plan, limited to avoid significant and unreasonable impacts, as defined under the Sustainable Groundwater Management Act (SGMA) of 2014, and at least 5% of all water recharged will remain in the aquifer and will not be recovered. Recovered water will be used within the SLWD boundaries (which is wholly within the Central Delta Mendota Groundwater Sustainability Agency boundaries). All water recovered and introduced into the DMC will comply with all relevant standards and monitoring protocols established for the introduction of pumped water into the DMC. 4. Flood Water Capture Los Banos Creek is prone to flooding. During a declaration of flood emergency or when the State of California Governor’s office issues Executive Orders such as N-4-23 and N-7-23 the basins may be used to divert flood water. DMC Diversions Under the Project, CVP and/or Warren Act water will be conveyed through the DMC and diverted into the Central Basin or the Southern Basin at three locations. The first point of diversion will be constructed at approximately mile post MP 80.03-L where a new storage and recovery pump system will be installed to lift water from and return water to the DMC from the Central Basin. The second point of diversion will be constructed at approximately mile-post MP 80.03-R where a second new storage and recovery pump system will be installed to lift water from and return water to the DMC from the Southern Basin. The third point of diversion is at the existing diversion structure near Check 15 at mile post MP 79.60-R (Los Banos Creek) which will gravity flow water from the DMC into Los Banos Creek where a weir and diversion structure will be constructed to divert flows into the Central Basin. Los Banos Creek Diversions Flood water flowing in Los Banos Creek may be diverted downstream of the DMC siphon crossing where the aforementioned weir and diversion structure will be constructed to divert flows into the Central Basin. Flood waters will only be diverted under the previously stated conditions. Under the Project, the weir and diversion structure would be constructed and the capacity to divert flood waters would increase. Conveyance and Infrastructure The Project would include constructing the following infrastructure and conveyance components: • Construct a 30 to 50 cfs water transfer facility between the Central Basin and the DMC. • Construct a 30 to 50 cfs water transfer facility between the Southern Basin and the DMC. • Construct a weir in Los Banos Creek downstream of the DMC siphon crossing and the existing Vulcan haul road crossing to facilitate convey water into the Central Basin from Los Banos Creek to capture water released from the DMC or flood flows; • Construct a diversion structure on the right bank of Los Banos Creek immediately upstream of the newly constructed weir to convey water flowing in Los Banos Creek into the Central Basin. The Project also includes contouring of the of the bottom of the existing pits being used for the Central Basin and the Southern Basin to facilitate the evacuation of the storage space. There will be no excavation work to create water storage space as the storage space was effectively created through past mining operations. Reshaping and stability improvements to the banks of the basins will also be performed.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is issuing a Request for Interest (RFI) under solicitation BD-27-1045-BWR00-BWR01-133675 to identify Public Water Supplies and municipalities with Water Management Act (WMA) permits or registrations interested in receiving a free American Water Works Association (AWWA) M36 water audit. The program targets entities that are not meeting the Unaccounted-for Water (UAW) performance standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible participants may receive either a Top-Down Audit or a Bottom-up Component Analysis. MassDEP will hire a private consulting firm through a separate public procurement process to conduct these audits. Selection is based on criteria including high UAW rates, WMA allocation status, recent improvement efforts, and permit status, with priority given to WMA permit holders and projects benefiting disadvantaged communities. Participation is limited to entities in compliance with the MBTA Communities Act Law. Selected applicants must provide a written commitment to have detailed system information for 2025 or 2026 available by January 15, 2027, and submit that data by February 2, 2027. Additionally, participants must commit significant personnel time as an in-kind match and be able to execute a contract within 15 to 30 days of the grant award. Responses must be submitted via email by October 21, 2026, using the provided application form.
BWR00 - Bureau of Water Resources

POSTED

about 20 hours ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS