Los Banos Creek Recharge and Recovery Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Los Banos Creek Recharge and Recovery Project, led by the San Luis Water District in Los Banos, California, utilizes two existing gravel pits—the Central Basin (85 acres, 1,000 acre-feet capacity) and Southern Basin (51 acres, 800 acre-feet capacity)—to store, recharge, and recover surface water from the Delta-Mendota Canal, the Central Valley Project, and Warren Act sources, as well as to capture flood flows from Los Banos Creek. The project serves four integrated functions: surface water storage during winter months for spring agricultural delivery, groundwater recharge to support regional sustainability goals under the Sustainable Groundwater Management Act, recovery of recharged water during drought conditions with a minimum 5% retention in the aquifer, and floodwater diversion under state emergency declarations such as Executive Orders N-4-23 and N-7-23. Water movement is facilitated by three diversion points: two newly constructed pump systems at mile posts MP 80.03-L and MP 80.03-R on the Delta-Mendota Canal, and a gravity-based weir and diversion structure at MP 79.60-R near Check 15, with additional capacity added downstream of the DMC siphon to capture Los Banos Creek flows. Infrastructure includes 30- to 50-cfs transfer facilities between each basin and the canal, basin reshaping for optimal storage, and bank stabilization—no new excavation is performed as storage capacity is derived from prior mining. Water quality for reintroduction into the Delta-Mendota Canal must meet Title 22 California Code of Regulations standards, with arsenic, boron, nitrate, selenium, sodium, sulfate, and total dissolved solids monitored via EPA 200.7 and 200.8 analytical methods. Bi-weekly sampling and compliance reviews by the Bureau of Reclamation after four years of operation are required. Environmental compliance is governed by CEQA and NEPA, with extensive mitigation measures addressing biological resources, cultural sites, and hazardous materials. Mandatory Best Management Practices include 15-mph speed limits on unpaved roads, pre-mobilization species inspections, prohibition of species take, and immediate reporting of sightings to state and federal agencies. All construction personnel must complete Worker Environmental Awareness Program training. The project’s period of performance runs from January 1, 2026, to December 31, 2026, with site preparation and grading
General Info
Agency
NAICS
Place of Performance
Los Banos, CASet-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code
