Los Gatos Stream Gauge 5119 Modification Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Los Gatos Stream Gauge 5119 Modification Project, managed by the Santa Clara Valley Water District, aims to improve the resolution and accuracy of instream bypass flow measurements at the Kirk Diversion Dam in Los Gatos Creek County Park. To address current inaccuracies caused by shallow sheet flow over an existing concrete drop structure, the project involves installing a 1-foot-tall steel weir plate with a center v-notch to concentrate low flows. Additionally, a weir box will be affixed to the upstream face of the structure to facilitate safer and more accurate discharge measurements for calibration. The system will be upgraded with a bubbler-type differential pressure stream gauge, a data logger housed in an enclosed gauge house, and solar panels for power. This project is designed to support downstream aquatic habitat in compliance with the Lake and Streambed Alteration Agreement and CDFW requirements. To protect the surrounding riparian and aquatic environment, the project incorporates Valley Water Standard Best Management Practices and Santa Clara Valley Habitat Plan Aquatic Avoidance and Minimization Measures to prevent sedimentation and maintain water quality. The work is anticipated to take three weeks to complete and has been granted a Categorical Exemption under CEQA as it pertains to existing facilities.

General Info

Agency

California → Santa Clara Valley Water District

Place of Performance

Dell Ave and Division St (closest cross streets), Los Gatos, CA, 95032

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara Valley Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Clara Valley Water District
Office AddressN/A
Contacts
Kelly WhiteAssociate Environmental Planner

Full Description

Show more
Located in Los Gatos Creek County Park in the town of Los Gatos, Los Gatos Stream Gauge 5119 (Gauge 5119) is used to measure instream bypass flows at the Kirk Diversion Dam established by the Lake and Streambed Alteration Agreement (LSAA) for the Kirk Diversion Operation and Maintenance Project (Notification No. 1600-2018-0386) to support downstream aquatic habitat. Gauge 5119 is located below a pedestrian bridge and on top of a concrete drop structure on Los Gatos Creek. The existing concrete drop structure is 53 feet long, extends 100 feet across the entire width of Los Gatos Creek, and serves as the weir for Gauge 5119. Flow over the top of the drop structure occurs as shallow sheet flow, and the Gauge 5119 flow readings correlate to the depth of the water on top of the concrete drop structure. Due to the shallow depth of water on top of the concrete drop structure, minor variations in stage (i.e., water surface elevation) result in large changes in flow readings, adversely affecting the accuracy of the flow measurements. Valley Water proposes installing a 1-foot-tall, 3/8-inch-thick steel weir plate over the top of the existing concrete drop structure. A v-notch in the center of the weir plate would concentrate low flows and produce larger changes in water depth for small variations in flow. This modification would improve the resolution and accuracy of the low flow measurements at Gauge 5119. A weir box would be affixed to the upstream face of the drop structure at the center of the weir. The weir box would provide hydrographers with a suitable cross section to take accurate discharge measurements for calibrating the stream gauge while reducing field safety hazards and streamlining data collection. A bubbler-type, differential pressure stream gauge enclosed in 1.5-inch-diameter galvanized pipe conduit would extend from the new gauge to an enclosed gauge house with a data logger above the right top of bank immediately upstream of the drop structure. Solar panels mounted on top of the enclosure would power the system. Valley Water Standard Best Management Practices (BMPs) and Santa Clara Valley Habitat Plan Aquatic Avoidance and Minimization Measures (Aquatic AMMs) have been incorporated into the project. The BMPs and Aquatic AMMs would protect riparian and aquatic habitat and prevent sedimentation and degradation of water quality in Los Gatos Creek. The project is anticipated to take 3 weeks to complete.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Fuel Pump Renovation
Solicitation # 6581
The Town of Trumbull is soliciting sealed proposals for the Department of Public Works Fuel Pump Renovation project, identified as solicitation 6581. The scope of work requires the contractor to provide all labor, materials, and equipment for the demolition, removal, and installation of fuel pump facilities. Key deliverables include the construction of fuel islands, tank slabs, and canopies, as well as the implementation of fire suppression and electrical systems. The project must adhere to the 2024 Connecticut Sediment and Erosion Control Guidelines, Town of Trumbull noise regulations, and technical standards such as NFPA 30, 30A, and 70. Proposals are due by December 1, 2026, at 2:00 PM ET and must be submitted in a sealed envelope to the Purchasing Agent. The selection process may evaluate proposers based on their previous experience with comparable work and available financial and technical resources. Required submission documents include a completed bid form, a list of subcontractors, and evidence of similar services provided to at least four clients in the last five years. The successful contractor must provide a 10% bid security, 100% performance and payment bonds, and a Certificate of Insurance naming the Town of Trumbull and the State of Connecticut as additional insureds. Additionally, the contractor must comply with Connecticut State Prevailing Wage Rates and ensure personnel have completed the 10-hour OSHA Construction Safety and Health Course. Payment is structured via estimates with a 5% retainage, though the Town may approve payments for long-lead equipment prior to delivery.
DAS Procurement

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
International
Fort William Historical Park – Bank Stabilization Construction Services (Historic Wharf)
Solicitation # tender_22303
The Government of Ontario, through the Ministry of Tourism, Culture and Gaming, is seeking a qualified contractor for bank stabilization and erosion mitigation works at the Historic Wharf of Fort William Historical Park in Thunder Bay, Ontario. The project aims to stabilize the existing embankment, protect the boardwalk and surrounding infrastructure, and restore safe conditions. The scope of work encompasses all necessary labor, materials, and supervision for site preparation, earth excavation, installation of geotextile and gabion basket retaining systems, placement of blast rock and clear stone, temporary dewatering, erosion and sediment control, and final site restoration including topsoil and sodding. The procurement process, identified as tender 22303, utilizes a multi-stage evaluation totaling 250 points. Bidders must first pass a technical evaluation focusing on health and safety, requiring a minimum score of 60 points to proceed to the commercial evaluation. The final selection is based on the highest scoring compliant bid, with a 10 percent score increase awarded to the bidder demonstrating the highest proportion of Ontario-made goods and services. Mandatory requirements include a non-U.S. business status, a commitment that 90 percent of staff are located in Canada, and a bid deposit of at least 10 percent of the total bid price. Selected contractors must provide a detailed project plan, procurement plan, and health and safety plan, while ensuring all Ontario tax obligations are in good standing.
Tourism, Culture and Gaming

POSTED

about 22 hours ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS