Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Lower Sardine Meadow Adaptive Management Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Lower Sardine Meadow Adaptive Management Project, managed by the Regional Water Quality Control Board, Lahontan Region, focuses on improving long-term meadow stability and ecological function in Lower Sardine Creek Meadow, a tributary to the West Walker River. Located in Bridgeport, Mono County, within the Bridgeport Ranger District of the Humboldt-Toiyabe National Forest, the project aims to reverse damage caused by historical grazing, road construction, and recreational use. These activities led to channel incision, concentrated flow, and reduced floodplain connectivity, which altered the natural hydrology of the area. While previous restoration efforts addressed large-scale incision, this project implements adaptive management to address localized areas identified through post-project monitoring and site visits. The project is classified under NAICS code 541620 and is exempt from the California Environmental Quality Act pursuant to Section 15333 for Small Habitat Restoration Projects, as it is determined not to have a significant environmental impact. Key administrative contacts include Engineering Geologist Meghan Walsh of the Regional Water Quality Control Board, along with coordination from the USDA and American Rivers.

General Info

Regional Water Quality Control Board restores Lower Sardine Creek Meadow's ecological function and stability.

Agency

California → Regional Water Quality Control Board, Region 6 - South Lake Tahoe

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 6 - South Lake Tahoe
Contacts3 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 6 - South Lake Tahoe
Office AddressN/A
Contacts
Meghan WalshEngineering Geologist
Aaron CooganDistrict Ranger
Sarah HecocksAssociate Director, CA Headwaters Conservation

Full Description

Show more
The purpose of this Project is to perform adaptive management in Lower Sardine Creek Meadow, a tributary to the West Walker River, to improve long-term meadow stability and ecological function. Impacts resulting from historical grazing, road construction, and recreational use have resulted in concentrated flow, channel incision, reduced floodplain connectivity, and altered the meadows natural hydrology. While a previous restoration project successfully addressed large-scale incision and hydrologically reconnected portions of the meadow, it did not plan for adaptive management actions. Post-Project monitoring and site visits since construction have identified several localized areas where additional adjustments will improve overall meadow performance.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
International
Fuel Management Prescription Development – Invermere Wildfire Risk Reduction Project Areas
Solicitation # DOI-2026-WRR-RFP-01
The District of Invermere is soliciting proposals for the development of three fuel management prescriptions across approximately 51 hectares of Wildfire Risk Reduction project areas, specifically Pine Ridge (13 hectares), Johnston Road and East DL 4616 (21 hectares), and Industrial Park Hillside (17 hectares). The scope of work includes field and office assessments, data collection, mapping, and the creation of implementation-ready prescriptions. All deliverables must meet provincial standards and the funding requirements of the Community Resiliency Investment – Columbia Basin Wildfire Resiliency Initiative, with final prescriptions requiring the signature of a Registered Professional Forester in good standing with Forest Professionals BC. The contract award is anticipated for January 26, 2027, with proposals due by January 5, 2027. Selection is based on a combination of mandatory criteria, weighted factors, and price. Successful proponents must maintain a District of Invermere business license and provide comprehensive insurance, including at least 2 million dollars in general liability and professional liability coverage, and 3 million dollars in non-owned automobile insurance. Payment is structured around four milestones: 30 percent upon completion of field data collection, 30 percent for draft prescriptions and spatial data, 20 percent following agency review and revisions, and a final 20 percent holdback upon acceptance of all deliverables, which includes a mandatory snow-free verification of site conditions.
District of Invermere

POSTED

about 12 hours ago

DEADLINE

in about 2 months
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS