This Solicitation opportunity from Arkansas Department of Transportation - Equipment and Procurement was posted on June 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
M-26-044H
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract covers the complete replacement of the roof and HVAC system at the Arkansas Department of Transportation’s Northeast Arkansas Office located at 600 North Main St. in Jonesboro, with work requiring removal of the existing roof membrane and insulation down to the wood deck, repair of damaged decking, and installation of four inches of polyisocyanurate insulation board with a fully adhered fleece-backed PVC membrane roof, including cricket, saddle, and tapered edge strip installation and integration with the adjoining wall air barrier. The HVAC scope includes installing new condensate drains per current code with an indirect air gap discharge into the existing floor or hub drain in the HVAC closet, removal and capping of the existing hard-connected tailpiece, and elevating units on blocks if necessary to ensure proper drainage. All roofing materials must be delivered in original sealed manufacturer containers with intact labels bearing the manufacturer name, product type, date of manufacture, approval markings, and storage instructions, and must be stored under cover in a weathertight, ventilated location above ground to prevent damage from sunlight, moisture, or physical impact; foam plastic and liquid materials have specific environmental protections, and all storage must comply strictly with manufacturer guidelines. Delivery must be coordinated with installation schedules to minimize on-site storage, especially for flammable, hazardous, or sensitive items. The contract requires full compliance with manufacturer qualifications, including UL listing for the roofing system and certification of the installer as an authorized, warranted contractor eligible for the manufacturer’s special warranty. All equipment and materials are subject to inspection and acceptance by ARDOT after delivery, and failure to meet specifications constitutes default, permitting ARDOT to cancel the award, procure alternate services at the contractor’s expense, and forfeit bonds. Bids must be firm for 30 days from opening, submitted with required certifications including proof of no boycott of Israel, no employment of illegal immigrants, no involvement in a boycott of energy, fossil fuel, firearms, or ammunition industries, and no affiliation with any scrutiny company owned by the Chinese government; these certifications are mandatory and must be submitted online or in writing as stipulated. The successful bidder must provide performance and payment bonds, submit key personnel assignments within five days of work commencement including full contact details, and comply with payment procedures outlined in Section 01 29 00, where applications must account for completed work, change orders, acceleration efforts, and distinguish between on-site and off-site stored materials. ARDOT is exempt from federal excise taxes, which must be added to the bid. The roofing system carries
General Info
Agency
NAICS
Place of Performance
USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
