Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on January 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Madden Creek Water System Improvement Project, Phase 4

Closed
0048State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of $16,690,000. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a substantial completion timeline of 560 calendar days. Bidders must provide a bid bond using form EJCDC C-430 and submit required MWBE documentation, including a Good Faith Efforts Form and Table A. The project is administered by Willis Engineers, who serve as the Owner's Representative. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner. Technical standards for the work include compliance with AWS D1.2 for welding, NEMA standards for motors, and ASTM C 1093 for masonry testing.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to motor control center components, and the installation of new instrumentation, electrical systems, and slide gates. Key deliverables for the project include lead abatement, metals fabrication, painting and coatings, concrete resurfacing, and the installation of FRP reinforcing systems and access hatches. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond premiums reimbursed by Garney Pacific. Interested parties must submit their quotes, including their bond rate and any redlines to standard subcontract forms, by November 17, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

This contract involves the construction of the Madden Creek Water System Improvement Project, Phase 4, located within Placer County right-of-way or Tahoe City Public Utility District (TCPUD) easements. The scope includes installing approximately 7,725 linear feet of water main using open cut methods, consisting of varying pipe diameters (4”, 6”, 8”, and 12”), as well as about 450 linear feet of 14” diameter water main installed via Horizontal Directional Drill beneath a creek. Additional work comprises installing mainline valves and fittings, connecting to existing water mains, setting 15 fire hydrants, 78 water service and meter assemblies, service connections to existing customers, as well as installing air release and blowoff valves. The project also includes necessary surface restoration and all related items required to complete the system improvements as detailed in the construction drawings. Bidders must provide a 10% bid bond. The solicitation was posted on January 30, 2026, with a response deadline of March 16, 2026. The contracting agency is the Engineering Department of the Tahoe City Public Utility District in California, with Cory Allison as the primary point of contact. The contract ensures a comprehensive upgrade and expansion of the local water infrastructure, supporting improved water distribution and fire safety within the designated service area.

General Info

Construction of Madden Creek Water System Phase 4, including 7,725 feet water main, valves, hydrants, and restorations.

Documents

3

01 - INVITATION TO BIDDERS _Madden 4_final.pdf

HTML

2026.01.30_Madden Phase 4 Bid Set.pdf

HTML

8171 Madden Ph. 4 PM .pdf

HTML

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Contract opportunity posted

Deadline changed

Response deadline changed from Mar 23, 2026 to Mar 16, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering Department of Tahoe City Public Utility District
Contacts1 person available
OfficeCA, USA

Full Description

Show more
Scope: The work to be performed for this project consists of all labor, material, tools, equipment, and incidentals necessary to construct approximately 7,725 total linear feet of water main installed via open cut (comprised of sizes 4”, 6”, 8”, and 12” diameters of varying footages), approximately 450 +/- linear feet of 14” diameter water main installed via Horizontal Directional Drill (HDD) to accomplish a creek under crossing, mainline valves & fittings, mainline connections to existing, 15 fire hydrants, 78 water services & meter assemblies, service connections to existing customer side, air release valves, blowoff valves, surface restoration, and all associated items to complete the project in Placer County right-of-way or TCPUD easements as shown on the construction drawings.
Bid Bond: 10.00%

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS