Madura Five Storm Water Lift Station Rehabilitation Equipment
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Santa Rosa County Board of County Commissioners is soliciting bids for the Madura Five Storm Water Lift Station Rehabilitation Equipment project located in Gulf Breeze, Florida. This procurement, designated as Bid Package No. 1, involves the supply of owner-furnished equipment and materials, including pumps, base elbows, guide rails, and electrical control panels, which will be installed under a separate Bid Package No. 2. The project requires strict adherence to technical and electrical specifications, including compliance with ANSI, IEEE, NFPA 70, and OSHA safety codes. Key deliverables include the equipment itself, manufacturer-recommended storage and preservation requirements, and written warranty documentation. The awarded contractor must provide a representative for at least two man-days of on-site installation assistance and certification. Bids must be submitted through the Santa Rosa County Procurement Portal in searchable PDF format by November 24, 2026. Required submission documents include a bid form, vendor questionnaire, sworn statement, references, conflict of interest disclosure, a Certificate of Authority to do business in Florida, and a Certificate of Insurance. A bid guarantee in the form of a certified cashier's check or bid bond for 5% of the total bid price is mandatory. For contracts exceeding $200,000, performance and payment bonds are required per Florida Statutes. The County reserves the right to award the contract to the respondent it determines to be in the best interest of Santa Rosa County, considering factors such as stability and the absence of conflicts of interest. There is no specific set-aside status for this solicitation.
General Info
Place of Performance
Set-Aside
Documents
9AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 9 solicitation documentsRead every page
- AI contract breakdown13 sections, Uniform Contract Format
- Buyer contactEmail and phone
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
The notice description changed.
The notice description changed.
Response deadline changed from Nov 6, 2026 to Nov 17, 2026. The notice description changed.
Response deadline changed from Nov 17, 2026 to Nov 24, 2026. The notice description changed.
The notice description changed.
Submission deadline
Response Deadline
Organization & Contact Information
Interested Companies (34)
See All 34 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Addendum #1: The mandatory pre-bid meeting will be rescheduled and posted in a forthcoming addendum as soon as a date has been determined.
Official Notice #1: Mandatory pre-bid meeting list: Attachments: 26-063_Pre-Bid_Attendance_List.pdf
Addendum #2: Mandatory pre-bid meeting date has been scheduled for October 22, 2026, via Teams. The question deadline has been extended until 12:00 p.m. on October 29, 2026. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3: Bid deadline has been extended until Tuesday, November 17, 2026 10:00am CST . Addendum#4 is forthcoming. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #4: Bid deadline has been extended until November 24, 2026 at 10:00am. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #5: Please see revised answer to question #3 Pumps: Sulzer Pump – Pump is accepted as an alternative to the presented pump. Acceptation of the alternative does not relieve the vendor from following any and all requirements outlined in the specifications. Subsequent review and approval from the engineer of the submittals will be required prior to manufacture of the materials. Please see additional clarification on question # 4 SCADA/Integration: The SCADA system at a minimum shall provide status and control of the pump station. This can be achieved using Allan Bradley PLC with radio communications and/or the OmniSite Crystal Ball. Equivalent alternatives to the OmniSite Crystal Ball will be evaluated during the submittal phase and will be accepted at the discretion of the Owner. Please see Additional Information (8) - Wilo Pump: Clarification - Wilo Pump – Pump is accepted as an alternative. All electrical components, including but not limited to VFDs, wiring, breakers, etc., will be sized to operate at the provided motor sizing and should be included in the bid. Acceptation of the alternative does not relieve the vendor from following any and all requirements outlined in the specifications. Subsequent review and approval from the engineer of the submittals will be required prior to manufacture of the materials. Please see Additional Information (9) – AC Units on Cabinets: The bid should include AC units as the means to cool the cabinet. A heat sink option can be discussed during the submittal phase and furth evaluated at that point.
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
