Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mailbox Only-RFQual- Environmental Consultant and Cleanup Services for Project at 1457 H Street

Closed
12500393State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 7 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves providing environmental consulting and cleanup services for a project located at 1457 H Street in Fresno, California. The selected contractor will be responsible for conducting supplemental environmental investigations to address data gaps identified in the Draft Remedial Action Plan (RAP), including soil, groundwater, and vapor sampling and analysis. This process aims to better define the extent and nature of contamination, utilizing sampling techniques such as ISM sampling and decision units, and comparing results to DTSC and EPA screening levels. Additional sampling may be required for soil stockpiles, vapor probes, and groundwater assessment points to ensure comprehensive site characterization. Furthermore, the contractor will assist with environmental review under the California Environmental Quality Act (CEQA) as needed, finalize and implement the remedial action plan, and oversee remediation activities such as soil excavation, groundwater treatment, and vapor extraction. The scope also includes developing a detailed plan for the disposal of contaminated soil, ensuring no reuse on or off-site, and conducting post-remediation monitoring to verify cleanup effectiveness. Regular progress reports will be required to keep the city informed of ongoing activities. The contract is organized under a solicitation issued by the City of Fresno, with a response deadline of September 20, 2024, and is designated under NAICS code 238910 for site preparation contractors.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fresno
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → City of Fresno
Office AddressN/A
Contacts

Full Description

Show more
The selected consultant/contractor will be responsible for the following tasks and as needed to meet DTSC standards, including but limited to:• Supplemental Environmental Investigation: Conduct additional investigation as outlined in the Draft RAP or as necessary to address data gaps and further define the nature and extent of contamination. This may involve soil, groundwater, and/or vapor sampling and analysis, including, but not limited to, the following additional tasks: o Collect representative samples of project areas to determine the horizontal and vertical contamination of site to determine the necessity of site excavation using ISM sampling and decision units. o All soil and soil gas samples should be tested for all chemicals of concern and must be compared to the latest DTSC HHRA Hero Note 3 Screening Levels or USEPA Regional Screen Levels. o Additional sampling of the soil stockpile on site with thorough data collection such as sampling methods (composite sampling or incremental sampling), total volume of sample collected, number of samples, other information as necessary. o Additional soil vapor probe and soil vapor well sampling locations, as needed at3 of 25 required below ground surfaces depths of 5 and 15 feet. o Additional groundwater sampling locations and assessment, as needed.• Environmental Review under the California Environmental Quality Act (CEQA) as needed.• Remedial Action Plan Finalization and Implementation: Finalize and implement the remedial actions outlined in the RAP, with any necessary modifications based on the supplemental investigation findings. This may involve soil excavation and disposal, groundwater treatment, vapor extraction, or other remediation techniques. o A well-defined workplan for contaminated soil disposal, no reuse of soil on-site or off-site.• Monitoring and Reporting: Conduct post-remediation monitoring to ensure the effectiveness of the cleanup and prepare regular progress reports for the city.

More opportunities from California → City of Fresno

Same awarding agency

NAICS: 237310
New
SLED
Requirements Contract To Furnish & Install Concrete And Paving Repairs At The Regional Wastewater Reclamation Facility
Solicitation # 12700088
The City of Fresno has issued solicitation 12700088 for a requirements contract to furnish and install concrete and paving repairs at the Regional Wastewater Reclamation Facility. The scope of work includes asphalt repair, reinforced concrete repair for curbs, gutters, and sidewalks, the application of Type I slurry seal, and required compaction testing and inspection. The contract is for an initial term of one year, with the possibility of two additional one-year extensions. The award will be granted to the lowest responsive and responsible bidder who possesses a valid California Contractor License (Class A, B, C-8, or C-12). A five percent local preference is available to businesses that meet specific Fresno County residency and performance criteria. Bidders must submit their proposals electronically via Planet Bids by November 10. Required documentation includes a noncollusion declaration, certification regarding the Comptroller General's List, and contractor license information. For public works contracts valued at 25,000 dollars or more, 100 percent payment and performance bonds are required. The contractor must adhere to the City of Fresno Standard Specifications, ASTM standards for reinforcement and density, and the Americans with Disabilities Act. Additionally, the project is classified as a public work requiring the payment of prevailing wages and compliance with the City of Fresno Hot Work Safety Program and NPDES storm water discharge permits.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS