Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 20, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MAINTENANCE AND NEW DREDGING AT NAVAL STATION NORFOLK, NORFOLK, VIRGINIA RESPONSIBILITY

Awarded
N4008523B2502Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 12 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

Solicitation N4008523B2502, managed by Navfacsyscom Mid-Atlantic for the Department of Defense, involves maintenance and new dredging operations at Naval Station Norfolk, Virginia. The project is divided into two primary work areas. The first is the Degaussing Station Range, located in the Entrance Reach Channel, which requires the removal of approximately 40,000 cubic yards of material along with fiberglass tubes, concrete tubes, and cabling. The second area is the Naval Station Norfolk waterfront, where maintenance dredging around existing piers involves a base bid of approximately 700,000 cubic yards, with an additional bid option for 550,000 cubic yards. All dredging must be performed using clamshell or bucket dredging, with materials transported to either an ocean disposal site or a land-based site such as the Craney Island Dredged Material Management Area. The waterfront operations require a minimum production rate of 7,000 cubic yards per 24-hour period. The contract includes strict technical specifications for quality management, the installation of Hydroid nets to protect foundations, and adherence to environmental standards for sediment disposal. Performance is expected to begin within 15 calendar days of award and be completed within 300 calendar days.

General Info

Contract Value

$12,504,867.28

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Norfolk, VA, 23511, USA

Set-Aside

NONE

Award Issued Date

Documents

32

Appendix A: Hydroid Net Typical Drawing - Norfolk Naval Station

PDF, High priority: read this first4 pages · specifications
High

Appendix C: Summary of Sediment Sampling Data - Norfolk Degaussing Range

PDF, High priority: read this first58 pages · specifications
High

Attachment B: Norfolk Degaussing Range Dredging Plans

PDF, High priority: read this first3 pages · specifications
High

Dredging @ Degaussing Range, FY23 and FY24 @ Naval Station, Norfolk - Price Proposal Form

PDF, High priority: read this first9 pages · specifications
High

Dredging @ Degaussing Range FY23/FY24 Bid Schedule

PDF, High priority: read this first9 pages · specifications
High

N4008523B2502 Amendment 0001

PDF, High priority: read this first3 pages · amendment
High

N4008523B2502 Amendment 0002

PDF, High priority: read this first2 pages · amendment
High

N40085-23-B-2502 Amendment 0003

PDF, High priority: read this first2 pages · amendment
High

N4008523B2502 Amendment 0004

PDF, High priority: read this first2 pages · amendment
High

N4008523B2502 Amendment 0005

PDF, High priority: read this first2 pages · amendment
High

N4008523B2502 Amendment 0006

PDF, High priority: read this first1 page · amendment
High

N40085-23-B-2502 Amendment 0007

PDF, High priority: read this first2 pages · amendment
High

N4008523B2502 Amendment 0008

PDF, High priority: read this first2 pages · amendment
High

N40085-23-B-2502 Design Revision 01 - Dredging Range & FY23/FY24

PDF, High priority: read this first12 pages · amendment
High

N40085-23-B-2502 Design Revision 02

PDF, High priority: read this first1 page · modification
High

N4008523B2502 - Maintenance and New Dredging at Naval Station Norfolk

PDF, High priority: read this first103 pages · ifb
High

Naval Station Norfolk Maintenance Dredging Site Plan FY 2023-2024

PDF, High priority: read this first18 pages · specifications
High

Norfolk Degaussing Range and Naval Station Norfolk Maintenance Dredging Pre-BID Inquiries

PDF, High priority: read this first5 pages · q-and-a
High

Norfolk Degaussing Range Relocation and Maintenance Dredging Specifications

PDF, High priority: read this first126 pages · specifications
High

Norfolk DGR 2019 EMT Replacement Record Drawings

PDF, High priority: read this firstspecifications
High

Appendix B: Cheatham Annex CAD-A Pier MPRSA Section 103 Evaluation

PDF, Low priority123 pages · specifications
Low

Attachment D - PIEE Vendor Access Instructions

PDF, Low priority7 pages · other
Low

ATTACHMENT ODP Personnel List

XLS, Low priority4 pages · other
Low

Craney Island Dredged Material Management Area (CIDMMA) Brochure

PDF, Low priority3 pages · other
Low

N40085-23-B-2502 Abstract of Offers - Maintenance and New Dredging at Naval Station Norfolk

PDF, Low priority1 page · abstract-of-offers
Low

N40085-23-B-2502 Abstract of Offers - Maintenance and New Dredging at Naval Station Norfolk

PDF, Low priority1 page · abstract-of-offers
Low

N40085-23-B-2502 Abstract of Offers - Maintenance and New Dredging at Naval Station Norfolk

PDF, Low priority1 page · other
Low

N40085-23-B-2502 - Maintenance and New Dredging at Naval Station Norfolk

PDF, Low priority1 page · abstract-of-offers
Low

Norfolk Degaussing Range Relocation Dredging Pre-BID Inquiries

PDF, Low priority7 pages · q-and-a
Low

Pre-Bid Inquiry (PBI) Form - Norfolk Degaussing Range Relocation Dredging

XLSX, Low priority1 page · q-and-a
Low

SECNAV 5512-1 Local Population ID Card/Base Access Pass Registration

PDF, Low priority3 pages · other
Low

Hydroid+Net.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

19 updates
PhaseAwarded
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline time changed from 7:00 PM UTC to 6:00 PM UTC on Jun 1, 2023.

Notice updated

Response deadline time changed from 6:00 PM UTC to 7:00 PM UTC on Jun 1, 2023. The notice description changed.

Deadline changed

Response deadline time changed from 7:00 PM UTC to 6:00 PM UTC on Jun 1, 2023.

Deadline changed

Response deadline changed from Jun 1, 2023 to Jun 15, 2023.

Deadline changed

Response deadline time changed from 7:00 PM UTC to 6:00 PM UTC on Jun 15, 2023.

Deadline changed

Response deadline time changed from 6:00 PM UTC to 7:00 PM UTC on Jun 15, 2023.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline time changed from 7:00 PM UTC to 6:00 PM UTC on Jun 15, 2023.

Deadline changed

Response deadline time changed from 6:00 PM UTC to 7:00 PM UTC on Jun 15, 2023.

Deadline changed

Response deadline time changed from 7:00 PM UTC to 6:00 PM UTC on Jun 15, 2023.

Deadline changed

Response deadline time changed from 6:00 PM UTC to 7:00 PM UTC on Jun 15, 2023.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline time changed from 7:00 PM UTC to 6:00 PM UTC on Jun 15, 2023.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Mid-Atlantic
Contacts1 person available
OfficeNORFOLK, VA, 23511-0395, USA
Office AddressNORFOLK, VA, 23511-0395, USA

Full Description

Show more
This project is comprised of two areas of work. The first area of work is at the Degaussing Station Range Naval Station Norfolk, Norfolk, Virginia. The Degaussing Station Range lies within the Entrance Reach Channel between Naval Station Norfolk and the Hampton Roads Bridge Tunnel. Maintenance and New Dredging is to be performed at this location via clamshell/bucket dredging. Approximately 40,000 cubic yards of material is to be dredged and then barged to an ocean disposal site or land based disposal site. In addition, fiberglass tubes, concrete tubes, and cabling is to be removed as part of the dredging operations. The second area of work is at Naval Station Norfolk waterfront. Maintenance Dredging is to be performed at this location via clamshell/bucket dredging around existing piers. Approximately 700,000 cubic yards of material is to be dredged and then barged to an ocean disposal site or land-based disposal site. The slips to be dredged under the base bid are identified as the ?Base Bid Dredging Areas? (brown shaded) on the Plans. As a bid option, another 550,000 cubic yards of material is to be dredged and then barged to an ocean disposal site or land-based disposal site. The slips to be dredged under the option item are identified as the ?Bid Option Dredging Areas? (red hatching) on the Plans.Minimum production rate for this area is 7,000 cubic yards per 24-hour period. (Please use this as Amendment 1) The previous amendment was just the solicitation.

More opportunities from Department Of Defense → Navfacsyscom Mid-Atlantic

Same awarding agency

NAICS: 236220
New
Federal
Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina
Solicitation # N4008526R0138
Solicitation N4008526R0138 is a full and open competition for a Fixed Price, Design-Bid-Build construction contract to develop the P-1550 SOF Marine Raider Battalion Company and Team Facilities at Stone Bay, Marine Corps Base Camp Lejeune, North Carolina. The project scope involves the construction of three primary facility types: a 73,400 square foot Operations, Supply, Communications, and Intel facility; 127,200 square feet of Company HQ and Team Facilities; and 17,600 square feet of Company Storage Buildings. These single-story steel frame structures will feature brick veneer, standing seam metal roofs, and translucent wall panels. The comprehensive site work includes utilities, parking, roadways, and pedestrian ways, with specialized engineering requirements for pile foundations, surcharged sites, and wetlands mitigation. The contract has a performance period of 1,246 calendar days after award. Award will be determined using a best-value tradeoff process, weighing price against non-price factors including corporate experience, management approach and schedule, safety, past performance, and small business utilization. The government has established a 40 percent overall small business participation goal. Key administrative requirements include CMMC Level 1 cybersecurity compliance, the use of the Wide Area WorkFlow system for invoicing, and the provision of performance and payment bonds. The project also includes optional line items for audio-visual systems and furniture, fixtures, and equipment.
Commercial and Institutional Building Construction

POSTED

about 17 hours ago

DEADLINE

in about 13 hours
View Details
NAICS: 561210
New
Federal
Bullet Traps Operation and Maintenance/Lead Cleaning for Breach and Shooting Houses
Solicitation # N4008527R0025
Naval Facilities Engineering Systems Command Mid-Atlantic is conducting market research via a Sources Sought Notice to identify capable small businesses for bullet trap operation, maintenance, and lead cleaning services at Marine Corps Base Camp Lejeune and Marine Corps Air Station New River. The intended contract will be a Firm Fixed Price/Indefinite Quantity agreement consisting of a one-year base period with four optional one-year extensions, not to exceed 60 months. The scope of work includes weekly maintenance and repairs of bullet traps, such as system modifications and canister inspections, as well as quarterly and semi-annual lead abatement and cleaning of interior surfaces and targets in breach and shooting houses. Qualified contractors must provide certified personnel, including technicians with OSHA and HAZMAT qualifications, as well as those holding Commercial Class A CDL, welding, and electrical licenses. Key requirements include a 24-hour response time for immediate maintenance issues, the ability to provide lab analysis from a certified laboratory, and strict adherence to Federal, State, Local, and DOD hazardous waste regulations. All materials removed from bullet traps must be certified as inert prior to disposal. Interested parties under NAICS 561210, specifically HUBZone, 8(a), SDVOSB, and WOSB concerns, must submit a capability statement and eligibility status by November 16, 2026.
Facilities Support Services

POSTED

about 17 hours ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS