This Solicitation opportunity from Department Of Defense was posted on November 20, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Maintenance Dredging Fort Pierce Harbor 28-Foot and 30-Foot Projects and Shore Protection Project Fort Pierce Beach Renourishment 2025, St. Lucie County, Florida

Closed
W912EP25B0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 9 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

This contract involves maintenance dredging within Fort Pierce Harbor, focusing on removing sediment and placing beach-compatible material along the Fort Pierce Beach area, with non-beach material directed to the Ocean Dredge Material Disposal Site located southeast of the harbor. The project includes constructing a beach berm along approximately 7,000 feet of shoreline south of Fort Pierce Inlet, with dredging activities sourced from Capron Shoal, situated about four miles southeast of the site. The work must be completed within specified timeframes, with beach placement deadlines set for May 15 and May 30, depending on the location. Due to offshore hardbottom areas, offshore pipeline access is restricted, necessitating onshore offloading inside Fort Pierce Inlet. The project also encompasses environmental monitoring, sea turtle trawl sweeping (for hopper dredges), turbidity monitoring, beach tilling, and support for munitions and explosives of concern, along with vibration control measures. The total performance period is approximately 210 calendar days from the issuance of the Notice to Proceed, including a 60-day commencement window. The work is divided into a base scope of 195 days and an optional extension of 15 days, which covers dredging an additional 100,000 cubic yards from Capron Shoal for beach placement between R-39A and R-41, along with screening, remediation of non-compliant materials, transportation, disposal, vibration monitoring, and sea turtle trawl sweeping. The contract is managed by the U.S. Army Corps of Engineers Jacksonville District, with key contacts available for inquiries. The project aims to enhance harbor maintenance and shoreline protection in St. Lucie County, Florida.

General Info

Maintenance dredging and beach renourishment projects in Fort Pierce, Florida, by USACE.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL

Set-Aside

NONE

Documents

1

W912EP25B0001 Amendment 0002 - Fort Pierce MDSPP

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Solicitation → Presolicitation

Type Changed

Presolicitation → Solicitation

Deadline changed

Response deadline time changed from 6:00 PM UTC to 5:11 PM UTC on Oct 31, 2024.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA

Full Description

Show more
Project work includes maintenance dredging within Fort Pierce Harbor. Beach compatible material will be placed into the Fort Pierce Beach project area identified below, while all non-beach compatible material will be placed into the Fort Pierce Ocean Dredge Material Disposal Site (ODMDS), located five nautical miles southeast of the Fort Pierce Harbor entrance. Project work also includes construction of a beach berm along approximately 7,000 feet of shoreline immediately south of Fort Pierce Inlet between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 and T-41. Remaining beach compatible sand for the Fort Pierce Beach portion of the project will be dredged from Capron Shoal, located approximately four miles southeast of the project site. Work on the beach must be completed by May 15 between R-37 and T-41 and by May 30 between R-34 to R-37. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading to the beach will be done inside Fort Pierce Inlet just north of the South Jetty. A staging area and beach access to the beach placement area is located at the end of Seaway Drive and near the south jetty offloading area. Work also includes but is not limited to environmental species monitoring, sea turtle trawl sweeping (hopper dredges only), turbidity monitoring, beach tilling, munitions and explosives of concern construction support (offshore dredging only), and vibration control and monitoring.The project will have an estimated period of performance of 210 calendar days after receipt of the Notice to Proceed (NTP). The stated time is inclusive of 60 calendar days to commence work and will be divided into base work and one option as follows:Base (including commencement and demobilization): 195 calendar days.Option A: 15 calendar days.Option A work consists of dredging 100,000 cubic yards of material from the Capron Shoal with placement on the beach between R-39A and R-41. Option A work also includes screening, beach tilling, remediation of noncompliant material, transportation and disposal of noncompliant material, vibration controls and monitoring, sea turtle non-capture trawl sweeping and stand by time.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS