AWARD NOTICE FOR EARLE DREDGING PROJECT

Awarded
N4008521B0055Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 12 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This project involves maintenance dredging at Naval Weapons Station Earle to restore minimum harbor depths for naval vessel access. The scope covers nine specific dredging areas, including all berths, the turning basin, the terminal channel, and a portion of the Sandy Hook Federal Channel. A total estimated volume of 2,261,170 cubic yards of material will be removed using a clamshell dredge to a depth of -45 feet MLLW, with a 2-foot overdepth allowance. All dredged material will be transported via split-hull or bottom dumping scows and placed at the Historic Area Remediation Site for remediation purposes. The work is divided into two phases, with Phase 1 targeting areas B1, B2, C1, and C2 in Summer 2022, and Phase 2 covering areas D, E, F, G, and H in Summer 2023. To meet project requirements, operations are permitted 24 hours a day, 7 days a week, with a mandatory minimum daily production rate of 7,500 cubic yards. This contract, managed by Navfacsyscom Mid-Atlantic under solicitation N4008521B0055, is performed in Colts Neck, New Jersey.

General Info

Contract Value

$23,255,988.75

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Colts Neck, NJ, USA

Set-Aside

NONE

Award Issued Date

Documents

25

AMENDMENT+0001+DREDGING+PROJECT.pdf

PDF

AMENDMENT+0002+DREDGING+PROJECT.pdf

PDF

AMENDMENT+0003+FOR+DREDGING+PROJECT.pdf

PDF

AMENDMENT+0004+FOR+DREDGING+PROJECT.pdf

PDF

AMENDMENT+0005+FOR+DREDGING+PROJECT.pdf

PDF

AMENDMENT+0006+FOR+DREDGING+PROJECT.pdf

PDF

Appendix+A+SedimentData+1652592+FY21+NWS+Earle+Maint+Dredging+Revised.pdf

PDF

Approval+letter+Environmental+Bucket.pdf

PDF

Attachment+1-+1652592+FY21+NWS+Earle+Maint+Dredging+Drwgs+FINAL.pdf

PDF

Attachment+2-+1652592+FY21+NWS+Earle+Maint+Dredging+SPECS+FINAL.pdf

PDF

Attachment+3-+Appendix+A+SedimentData+1652592+FY21+Earle+Maint+Dredging.pdf

PDF

Attachment+4-+Appendix+B+Permits+1652592+FY21+Earle+Maint_Dredging.pdf

PDF

Attachment+5-Appendix+C+ACOE+TransportSheet+1652592+FY21+Earle+Maint+Dredging.pdf

PDF

Attachment+6-+Appendix+D-Project+Identification+Signboard+1652592+FY21+Earle+Dredging.pdf

PDF

Attachment+7+-+Pre-Proposal+Inquiries+Log.doc

DOC

Attachment+8-+NWS+Earle+FY21+Bid+Schedule_05-11-21_Cost+Blank.pdf

PDF

BID+INJURY+LOG+03.pdf

PDF

BID+INQUIRY+LOG+02+RESPONSES+4-9.pdf

PDF

BID+INQUIRY+LOG+04+DOCUMENT.pdf

PDF

N40085-21-B-0055+BID+INQUIRY+LOG+01.pdf

PDF

N4008521B0055+EARLE+DREDGING+RFP.pdf

PDF

nwse_cond_30x_May2020_mllw.zip

ZIP

PPI+INQUIRY+LOG+05.pdf

PDF

Site+Visit+Log.jpg

JPG

UPDATED+NWS+EARLE+DREDGING+BID+SCHEDULE.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseAwarded
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Aug 24, 2021 to Aug 31, 2021.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Mid-Atlantic
Contacts1 person available
OfficeNORFOLK, VA, 23511-0395, USA
Office AddressNORFOLK, VA, 23511-0395, USA

Full Description

Show more
The project consists of Maintenance Dredging the areas surrounding piers at Naval Weapons Station (NWS) Earle including all berths, turning basin, terminal channel, and a portion of Sandy Hook Federal Channel. This project will be done in order to re-establish the minimum required harbor depths needed for access by the Naval vessels that use these facilities. Maintenance dredging shall be done via clamshell dredge, with a total estimated volume of 2,261,170 cubic yards (CY) of dredged material to a depth of -45 feet Mean LowerLow Water (MLLW) Datum, plus the standard 2 feet of overdepth of -47 Mean Lower Low Water (MLLW) Datum including the ship berths, the turning basin, the terminal channel and a portion of the Sandy Hook Federal Navigation Channel of the New York Harbor, N.Y. Federal Navigation Project (Sandy Hook Federal Channel). The dredged material would be placed into split-hull and/or bottom dumping scows maneuvered using a tugboat. Barge overflow is authorized when performed in accordance with the Water Quality Cerificate (WQC) issued by the New Jersey Department of Environmental Protection (NJDEP). The dredged material will be placed at the Historic Area Remediation Site (HARS) for the purpose of remediation. There are nine (9) dredging areas, Dredging Areas B1, B2,, C1, C2, D, E, F, G and H and dredging will be conducted in two dredging phases. During Dredging Phase 1, the piers, turning basin and a portion of the Sandy Hook Channel (Area B1, B2, C1 and C2), consisting of 1,176,375 CY sand, silt, and mud, will be dredged in Summer 2022; and during Dredging Phase II, the remainder of the Sandy Hook Channel (Areas D, E, F, G and H), consisting of approximately 1,043,395 CY sand, will be dredged in Summer 2023. The project schedule will allow for dredging work to be performed 24 hours/7 days per week and will require a minimum daily production rate of 7,500 CY per day.

More opportunities from Department Of Defense → Navfacsyscom Mid-Atlantic

Same awarding agency

NAICS: 236220
New
Federal
Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina
Solicitation # N4008526R0138
Solicitation N4008526R0138 is a full and open competition for a Fixed Price, Design-Bid-Build construction contract to develop the P-1550 SOF Marine Raider Battalion Company and Team Facilities at Stone Bay, Marine Corps Base Camp Lejeune, North Carolina. The project scope involves the construction of three primary facility types: a 73,400 square foot Operations, Supply, Communications, and Intel facility; 127,200 square feet of Company HQ and Team Facilities; and 17,600 square feet of Company Storage Buildings. These single-story steel frame structures will feature brick veneer, standing seam metal roofs, and translucent wall panels. The comprehensive site work includes utilities, parking, roadways, and pedestrian ways, with specialized engineering requirements for pile foundations, surcharged sites, and wetlands mitigation. The contract has a performance period of 1,246 calendar days after award. Award will be determined using a best-value tradeoff process, weighing price against non-price factors including corporate experience, management approach and schedule, safety, past performance, and small business utilization. The government has established a 40 percent overall small business participation goal. Key administrative requirements include CMMC Level 1 cybersecurity compliance, the use of the Wide Area WorkFlow system for invoicing, and the provision of performance and payment bonds. The project also includes optional line items for audio-visual systems and furniture, fixtures, and equipment.
Commercial and Institutional Building Construction

POSTED

about 16 hours ago

DEADLINE

in about 14 hours
View Details
NAICS: 561210
New
Federal
Bullet Traps Operation and Maintenance/Lead Cleaning for Breach and Shooting Houses
Solicitation # N4008527R0025
Naval Facilities Engineering Systems Command Mid-Atlantic is conducting market research via a Sources Sought Notice to identify capable small businesses for bullet trap operation, maintenance, and lead cleaning services at Marine Corps Base Camp Lejeune and Marine Corps Air Station New River. The intended contract will be a Firm Fixed Price/Indefinite Quantity agreement consisting of a one-year base period with four optional one-year extensions, not to exceed 60 months. The scope of work includes weekly maintenance and repairs of bullet traps, such as system modifications and canister inspections, as well as quarterly and semi-annual lead abatement and cleaning of interior surfaces and targets in breach and shooting houses. Qualified contractors must provide certified personnel, including technicians with OSHA and HAZMAT qualifications, as well as those holding Commercial Class A CDL, welding, and electrical licenses. Key requirements include a 24-hour response time for immediate maintenance issues, the ability to provide lab analysis from a certified laboratory, and strict adherence to Federal, State, Local, and DOD hazardous waste regulations. All materials removed from bullet traps must be certified as inert prior to disposal. Interested parties under NAICS 561210, specifically HUBZone, 8(a), SDVOSB, and WOSB concerns, must submit a capability statement and eligibility status by November 16, 2026.
Facilities Support Services

POSTED

about 16 hours ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS