Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 12, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Maintenance Dredging of Flushing Bay and Creek, New York, Federal Navigation Project.

Awarded
W912DS22B0012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 6 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The Maintenance Dredging of Flushing Bay and Creek, New York, Federal Navigation Project is a Department of Defense initiative managed by the US Army Corps of Engineers, New York District. Under solicitation W912DS22B0012, the project involves removing approximately 150,000 cubic yards of material, primarily consisting of silt and clay, to achieve a depth of -15 feet Mean Lower Low Water plus 2 feet of allowable overdepth. Due to environmental restrictions and water quality certificates from the New York State Department of Environmental Conservation, the work must be performed using a mechanical clamshell dredge equipped with an environmental bucket, supported by multiple scows and tugboats for dredging, dewatering, and unloading operations. The project magnitude is estimated between 10 million and 25 million dollars, with the dredged material being transported to state-permitted upland sites in compliance with all federal, state, and local regulations. Technical specifications include detailed sounding maps, channel coordinates, and sediment analysis for volatiles and semivolatiles to ensure safe placement. The procurement process involved a sealed bid invitation with a response deadline in June 2022, incorporating specific heavy dredging wage determinations and a structured bid schedule for mobilization and dredging activities.

General Info

Contract Value

$21,413,700

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Flushing, NY, USA

Set-Aside

NONE

Award Issued Date

Documents

11

06+-+5115_all_ELEVATION

PDF, High priority: read this first3125 pages · specifications
High

Flushing Bay Upland Data Table - COMP A

XLSX, High priority: read this first181 pages · specifications
High

W912DS22B0012 Amendment 0001

PDF, High priority: read this first17 pages · amendment
High

W912DS-22-B-0012 Flushing Bay and Creek NY - Plans

PDF, High priority: read this firstspecifications
High

W912DS-22-B-0012 Maintenance Dredging Flushing Bay and Creek NY

PDF, High priority: read this first343 pages · ifb
High

W912DS22B0012 - Maintenance Dredging of Flushing Bay and Creek

PDF, High priority: read this firstifb
High

ASI FINAL Report Signature Page

PDF, Low priority1 page · other
Low

Eurofins TestAmerica Corrective Action Letter - 06/05/2020

PDF, Low priority2 pages · other
Low

Flushing Bay Upland 2020 Data Tables

PDF, Low priority181 pages · specifications
Low

Flushing Bay Upland Data Deliverable Cover Letter

PDF, Low priority2 pages · other
Low

W912DS22B0012 - Maintenance Dredging of Flushing Bay and Creek

PDF, Low priority1 page · bid-abstract
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

8 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Type Changed

Solicitation → Presolicitation

Notice updated

Response deadline changed from Apr 22, 2022 to Jun 14, 2022. The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Solicitation → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New York
Contacts2 people available
OfficeNEW YORK, NY, 10278-0004, USA
Office AddressNEW YORK, NY, 10278-0004, USA

Full Description

Show more
Maintenance dredging of Flushing Bay and Creek, New York, Federal Navigation Project to a depth of -15 feet Mean Lower Low Water (MLLW) plus 2 feet of allowable overdepth. The proposed maintenance dredging would remove approximately 150,000 cubic yards (CY) of material from the Federal Channel. The dredged material would be dredged and subsequently placed at a suitable, state-permitted upland site(s). Results of grain size analyses performed on samples taken from the shoals in 2020 indicate that the proposed dredge material is mostly silt and clay. Based on the past dredging projects within the Flushing Bay and Creek, and restrictions found in the New York State Department of Environmental Conservation Water Quality Certificate, the proposed work can only be performed by utilizing a mechanical clamshell dredge with environmental bucket. Additionally, multiple scows and tugboats will be needed to perform the work during dredging, dewatering and unloading operations. The dredged material would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located

More opportunities from Department Of Defense → W2SD Endist New York

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS