Maintenance Dredging of Sandy Hook Channel

Awarded
W912DS-15-B-0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 13 hours ago

DEADLINE

in 11 days
NAICS: 237990
New
SLED
Seaview Vehicular Beach Access Ramp Reconstruction Project
Solicitation # 26-B-128CW
The Seaview Vehicular Beach Access Ramp Reconstruction Project, solicitation number 26-B-128CW, is an invitation for bid issued by the County of Volusia to reconstruct a beach access ramp in a residential section of Daytona Beach that was destroyed by Hurricane Ian in 2022. The project scope includes the demolition of storm-damaged infrastructure and the installation of a reinforced concrete vehicular ramp, a pedestrian sidewalk, a concrete cap, and composite sheet pile seawall panels and retaining walls. Additional site improvements include FDOT Type D curbing, an on-beach shower, pavement markings, signage, and full site restoration. The estimated construction cost is 1,213,413.00 dollars, with a total contract performance period of 150 days following the Notice to Proceed. Bids are due electronically via the OpenGov Procurement portal by November 5, 2026, at 3:01 pm, and will be awarded to the single lowest responsive and responsible respondent. The contractor must comply with various regulatory requirements, including permits from the FDEP, USACE, and U.S. Fish and Wildlife Service, as well as the Habitat Conservation Plan for the Protection of Sea Turtles. Mandatory requirements include the provision of payment and performance bonds, comprehensive insurance coverage, and adherence to federal contract provisions such as the Davis-Bacon Act and Equal Employment Opportunity standards. Payments are generally made within 30 days of receipt of an undisputed invoice, with specific sales tax exemption procedures in place for materials.
Coastal

POSTED

about 15 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The New York District of the U.S. Army Corps of Engineers has issued contract W912DS-15-B-0011 for the maintenance dredging of the Sandy Hook Channel within the New York Harbor Federal Navigation Project. The project involves the removal of approximately 220,755 cubic yards of primarily sandy sediment to a depth of 35 feet below Mean Lower Low Water, with an additional 2 feet of allowable overdepth. All dredged material is to be transported and placed at the Historic Area Remediation Site. To execute this work, the use of a large mechanical dredge is recommended, potentially supported by multiple barges and tug boats. The selected contractor must begin operations within five calendar days of receiving the notice to proceed and complete all basic work within thirty-seven calendar days. A strict production requirement is in place, mandating an integrated production rate of at least 8,000 cubic yards per calendar day for both the dredging and placement phases. This project is managed by the Department of Defense under NAICS code 237990.

General Info

Contract Value

$3,880,212.5

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

NY, USA

Set-Aside

NONE

Award Issued Date

Documents

13

4293-20150311-MAP-45ft_sort_and_land_40ft_sort-Ele.xyz

OCTET-STREAM

Amendment_0001.pdf

PDF

Amendment_0002.pdf

PDF

Amendment_0003.pdf

PDF

Amendment_0003_Sheet_2_OF_3.pdf

PDF

Amendment_0004_%7E_4087-mllw-all-50sort_ELEVATION.xyz

OCTET-STREAM

Amendment_0004_%7E_4087-mllw-both-3ftAvf.xyz

OCTET-STREAM

Amendment_0004_%7E_harsmapofPRA5.pdf

PDF

Amendment_0004_%7E_Sandy_Hook_Channel_Exclusionary_3-11-15_FINAL_signed.pdf

PDF

Amendment_0004_%7E_SHC_2014-_Grain_Size_Data.pdf

PDF

Amendment_0004_%7E_SHC_ASI_coordinates.pdf

PDF

Amendment_0004.pdf

PDF

BID_ABSTRACT_W912DS-15-B-0011.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jul 14, 2015 to Jul 20, 2015. The notice description changed.

Notice updated

Response deadline changed from Jul 20, 2015 to Jul 21, 2015. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jul 21, 2015 to Jul 20, 2015. The notice title changed. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New York
Contacts1 person available
OfficeNEW YORK, NY, 10278-0004, USA
Office AddressNEW YORK, NY, 10278-0004, USA
Contacts
Orlando NievesContract Specialist

Full Description

Show more
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of Sandy Hook Channel, in the New York Harbor Federal Navigation Project, with subsequent placement of the dredged material at the Historic Area Remediation Site (HARS). The proposed maintenance dredging would remove approximately 220,755 Cubic yards of sediment to a depth of 35 feet below Mean Lower Low Water(MLLW) plus 2 ft allowable overdepth. The dredged material consists primarily of sand. Based on past cycles of the proposed work in Sandy Hook Channel, it is recommended that the work be performed by large mechanical dredge. Additional multiple barges and tug boats may be needed to perform the work during dredging, transport and placement of the dredged material. The Contractor will be required to commence work within five (5) calendar days after the date of receipt by him the notice to proceed. The contractor will be required to prosecute said work diligently and to complete the basic work ready for use not later than thirty-seven (37) calendar days after the receipt by him of the notice to proceed (NTP). The contractor is required to maintain an integrated production of at least 8,000 cubic yards per calendar day for the dredging and placement of the sand at the HARS.

More opportunities from Department Of Defense → W2SD Endist New York

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS