Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on December 7, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Maintenance Dredging, U.S. Naval Station Mayport, 50-Foot Project and Navy Fuel Pier 111, 38-Foot Project, Duval County, Florida

Closed
W912EP22B0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 9 hours ago

DEADLINE

in 5 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Jacksonville, FL, USA

Set-Aside

NONE

Documents

12

F.S. 403.813(3) Permit Exemptions - Deep Water Ports and Inland Navigation Districts

PDF, High priority: read this first2 pages · specifications
High

Permit SAJ-2002-02052 Modification Number Three - Naval Station Mayport

PDF, High priority: read this firstmodification
High

Section 00 31 32 Geotechnical Data Report - NS Mayport & Navy Fuel Pier 111

PDF, High priority: read this first650 pages · specifications
High

W912EP22B0008 Amendment 0002 - Mayport & Navy Fuel Pier 111

PDF, High priority: read this first27 pages · amendment
High

W912EP22B0008 - Maintenance Dredging, US Naval Station Mayport

PDF, High priority: read this first1 page · award
High

W912EP22B0008 - Maintenance Dredging, US Naval Station Mayport

PDF, High priority: read this first219 pages · ifb
High

W912EP 22 B0008 - Maintenance Dredging, USNS Mayport & Navy Fuel Pier 111 (Vol 2)

PDF, High priority: read this first292 pages · specifications
High

W912EP22B0008 - Mayport Navy Fuel Pier EPA Concurrence Letter

PDF, Low priority3 pages · special-notice
Low

W912EP22B0008 - Navy Fuel Pier 111 DEP Exemption

PDF, Low priority1 page · special-notice
Low

21-262_JAX_ODMDS_ZN_A-B1-C1-D_03-DEC-2021_3X3AVG_SV+SALZER-N.zip

ZIP

B.08.02+Amendment+0001%2C+W912EP22B0008+Mayport+%26+Navy+Fuel+Pier+111+FY23.pdf

PDF

B.08.02+Plans%2C+Mayport+and+Navy+Fuel+Pier.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Oct 19, 2022 to Nov 2, 2022. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA

Full Description

Show more
*** AMENDMENT 0002 HAS BEEN POSTED 10/14/2022 *** *** AMENDMENT 0001 HAS BEEN POSTED 09/27/2022 *** *** SOLICITATION IS ISSUED 09/01/2022 *** A Pre-Bid Conference will be held via teleconference on 21 September 2022 @ 11:00am, Local Time. The call-in number is: +1 (555) 000-0000, the Access Code is: 2761 553 0243 and the link to be utilized is as follows: https://usace1.webex.com/meet/manuela.d.voicu. It is requested that an email be sent to contact@example.gov no later than 20 September 2022 at 3:00pm, EDT to confirm attendance by your organization.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS