Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of The Army was posted on December 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Maintenance Dredging, WH AB MID-RIVER, North Carolina: W912PM25B0008

Closed
W912PM25B0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 6 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers Wilmington District is seeking information from qualified contractors capable of performing maintenance dredging operations in Wilmington Harbor Anchorage Basin and Mid-River Channels in North Carolina. The project involves removing shoaled material from federal navigation channels, with estimated dredging quantities ranging from 1 to 1.5 million cubic yards for the Anchorage Basin and 400,000 to 800,000 cubic yards for the Mid-River Channels. Dredging depths are specified at 38 to 42 feet, with allowances for overdepth, and the work will utilize mechanical dredges and ocean-certified barges for material transport to the Ocean Dredged Material Disposal Site. The estimated construction cost ranges from $1 million to $25 million, depending on the segment. Interested firms must demonstrate their experience with similar dredging projects, including capabilities with hydraulic pipeline dredges, bonding capacity, and socio-economic status, such as HUBZone, 8(a), or Service-Disabled Veteran-Owned Small Business certifications. Submissions should include details on equipment, project experience, team arrangements, and capacity to perform work within the specified geographic and project scope. The deadline for responses is December 19, 2024, and the information gathered will inform future procurement decisions. This is a market research effort and does not constitute a solicitation or guarantee of contract award.

General Info

Wilmington District seeks contractors for maintenance dredging at Wilmington Harbor and Mid-River Channels.

Agency

Department Of The Army → W074 Endist Wilmington

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Wilmington, NC, 28403, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Army → W074 Endist Wilmington
Contacts2 people available
OfficeWILMINGTON, NC, 28403-1343, USA
Organization / Agency
Department Of The Army → W074 Endist Wilmington
Office AddressWILMINGTON, NC, 28403-1343, USA

Full Description

Show more

SOURCES SOUGHT NOTICE FOR


MAINTENANCE DREDGING


WILMINGTON HARBOR ANCHORAGE BASIN AND MID-RIVER CHANNELS (WH AB MID-RIVER)



This is a Sources Sought/Request for Information only. This is NOT a Solicitation Announcement, nor is it a


Request for Proposal. This request does not obligate the Government in any contract award.



The U.S. Army Corps of Engineers, Wilmington District, is conducting research to determine the market capabilities of potential contractors to perform maintenance dredging.  The areas of consideration for this dredging service are the Wilmington Harbor Anchorage Basin and Mid-River Channels.



Wilmington Harbor Anchorage Basin


Maintenance Dredging, Wilmington Harbor Anchorage Basin and 42-Ft Project, New Hanover and Brunswick Counties, North Carolina



Estimated Quantity: 1 to 1.5M CY.



Environmental Window: None.  



The work includes maintenance dredging of upper Wilmington Harbor federal navigation channel reaches including the Anchorage Basin and Turning Basin Extension. The work will consist of removal and disposal of shoaled material that has accumulated in the channels and berth areas since the various areas were last dredged.  The work will require a mechanical dredge and barges to transport material to the disposal site.  Dredging depths are 38’ plus 2’, and 42’ plus 2’ of allowable over depth for the Anchorage Basin.  The estimated quantity of material to be dredged is 1 to 1.5 million cubic yards.  The Government furnished disposal area is the Ocean Dredged Material Disposal Site (ODMDS).  There is no environmental window for dredging the Wilmington Harbor federal navigation channel reaches using mechanical dredge; however, there are restrictions for no overflow of barges/scows allowed during dredging or transport to the ODMDS.



The magnitude of construction for this project will be between $10M to $25M



Mid-River Channels


Maintenance Dredging, Cape Fear River, New Hanover and Brunswick Counties, North Carolina



Estimated Quantity: 400K to 800K



Environmental Window: None



The work includes maintenance dredging of middle Wilmington Harbor federal navigation channels from Upper Brunswick to Battery Island. The work will consist of removal and disposal of shoaled material that has accumulated in the channels since the various areas were last dredged.  The work will require a mechanical dredge and ocean certified barges to transport material to the disposal site.  Dredging depths are 42’ plus 2’ of allowable over depth for all reaches except Battery Island, which has a dredging depth of 44’ plus 2’ of allowable over depth. The estimated quantity of material to be dredged is 400K to 800K cubic yards.  The Government furnished disposal area is the Ocean Dredged Material Disposal Site (ODMDS).  There is no environmental window for dredging the Wilmington Harbor federal navigation channel reaches using a mechanical dredge; however, there are restrictions for no overflow of barges/scows allowed during dredging or transportation to the ODMDS.



The magnitude of construction for this project will be between $1M to $5M.






All interested firms with 237990 as an approved NAICs code have until 19 December 20234 at 1600 EST to submit the following information:



- Name & Address of your Firm



- Point of Contact (Name/Phone/E-mail)



- Current SAM


- Documentation of use of a hydraulic pipeline dredge


- Business Size, to include designation as HUBZone, 8(a), Service-Disabled Veteran Owned Small Business, Small Disadvantaged Business, Woman-Owned Business, and Large Business. Any supporting documentation that confirms your socio-economic status should be provided, i.e., letter of certification from VA confirming SDVOSB status. The Government must be able to verify SBA certification of HubZone and 8(a) via SAM.



- Bonding capability - both single and aggregate capacity contracts, as evidenced by submission of Surety Company Letter stating bonding capacity.



- Evidence of capabilities to perform comparable work (dredging projects). The contractor must provide evidence of comparable work on two (2) recent projects greater than $1,000,000.00 in value (not more than five (5) years old.) Include the project name and description of the key/salient features of the project (completion date, total contract construction value, and your company's level of involvement in the project, i.e., subcontractor (type), prime, GC, etc. and your specific role. Additionally, if you were teaming with another firm, clearly identify your role on the project(s) submitted. Please provide at least one point of contact (with e-mail address and phone number) for project validation. The Government will not give credit to projects if the lack of information hinders the ability to determine relevancy and/or level or experience.



- Firm's capability to perform, to include geographic span and project size.



- Information on Teaming Arrangement (if applicable). Although we are not looking for formal signed agreements at this time, if you intend to "team" with another firm, formally or informally, you must submit information, not more, than one (1) page, about your team's involvement. More specifically, you must submit sufficient information for the Government to determine the roles each team member will play and what your socio-economic status is or will be considering the proposed arrangement. Therefore, included in your one (1) page if you are a Small Business and you intend to mentor/protégé and/or JV with a large business both team members must sign agreeing that 40% of the labor will be performed by the 8(a) firm. Additionally, if the team is a mentor/protégé arrangement, identify the areas that will be mentored. Any supporting documentation that confirms your socio-economic status as a team should be provided.



The Government may not give credit to your socio-economic class if there is not sufficient documentation to support it or if the Government cannot verify through other means that your business is as such.



The NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction and the size standard is $45M. [NOTE: Dredging - To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.]



Responses to this Sources Sought Announcement will be used by the government to make appropriate acquisition decisions. All interested businesses, regardless of size should submit a narrative demonstrating their Specialized Experience in similar type contracts, Past Performance, Key Personnel. Capability statements should include size/classification of your firm, bonding capacity, bonding availability, details of similar projects, and the completion dates, references and contract amount for the similar projects listed.






SURVEY OF THE DREDGING INDUSTRY


The following confidential survey questionnaire is designed to apprise the Corps of prospective dredging contractors' project execution capabilities. Please provide your response to the following questions. All questions are in regard to the Maintenance Dredging, Wilmington Harbor Anchorage Basin, and Mid-River Channels, North Carolina.


General:


1) Have you ever worked on dredging jobs similar in nature to this project? If so, please describe the project and for whom the work was performed. Identify a point of contact and phone number, as a reference of relevant experience.


2) What percentage of work (volume of material dredged, transported and ultimately placed) can you perform with your own equipment or equipment owned by another contractor?


3) Have you performed dredging within the waters of adjacent to Wilmington Harbor Anchorage Basin and Mid River, North Carolina?


4) Would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s) or as a joint venture?


5) Is there a dollar limit on the size of contract that you would bid? If so, what is that limit?


6) What is the largest dredging contract, in dollars, on which you were the prime contractor?


7) What is your bonding capacity per contract? What is your total bonding capacity?


Equipment:


8) What type of dredge equipment do you own and / or operate that is suitable for the work described? Please list each piece of equipment capable of performing each type of work described.


9) Identify which dredge(s), including support equipment (tugs, crew boats etc.), you would employ on this project. Also, for each dredge, identify the maximum digging depth.


Narratives shall be no longer than 30 pages.  The requested information shall be submitted electronically to:



U.S. Army Corps of Engineers


Attn: Rosalind M. Shoemaker and Diana D. Curl


E-mail: contact@example.gov and contact@example.gov



The email should be titled: Maintenance Dredging, WH AB MID-RIVER, North Carolina:  W912PM25B0008.



THIS IS NOT A SOLICITATION AND SHOULD NOT BE CONSTRUED AS SUCH.



Do not send hard copies of advertising or promotional materials. Please ensure that all responses are comprehensive and provide a name and point-of-contact for your firm for follow-up by this office or the procuring contracting officer. If you have responded to any previous e-mail messages or had other communications with our office regarding preliminary market research for this project, please be advised that it will be necessary for you to respond to this e-mail and the questions contained therein. Any responses involving teaming agreements should delineate between the work that will be accomplished by the Prime Contractor and work accomplished by the teaming partner



All information is to be provided on a voluntary basis at no charge to the Government. There is no entitlement to payment of direct or indirect costs related to or arising out of responding to this request for information. All information provided becomes property of the Government. There is no guarantee, expressed or implied, that the market research for this acquisition will result in any guarantee of award or acquisition strategy. 


Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS