Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Florida was posted on September 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Manatee County

Awarded
H1176State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Under solicitation number H1176, Manatee County is acting as a sub-recipient for a Hazard Mitigation Grant Program project to install backup power at R. Dan Nolan Middle School in Bradenton, Florida. The project involves the purchase and installation of a permanent generator with an estimated capacity of 1,250kW, along with a concrete pad, automatic transfer switch, diesel supply tank, fencing, and a rated enclosure. Because the school serves as a critical special needs shelter and meal service center during emergencies, this infrastructure is essential to prevent service interruptions during power outages. The total award amount for this project is 1,383,045.75 dollars, with a performance period spanning from February 21, 2024, to February 29, 2028. To ensure long-term resilience, the installation must comply with National Electrical Code working clearances and be protected against wind according to ASCE 7 standards. Additionally, the generator must be located outside the Special Flood Hazard Area or implemented with specific activities to withstand a 500-year flood event in accordance with National Flood Insurance Program requirements. All work must be completed in strict adherence to applicable federal, state, and local rules and regulations. This agreement is managed through the Florida Executive Office of the Governor's Emergency Management Division Mitigation Bureau.

General Info

Manatee County will install a 1,250kW generator at R. Dan Nolan Middle School.

Contract Value

$1,383,045.75

NAICS

N/A

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Contract End Date

February 29, 2028

Documents

1
PDF, Low priorityaward
Low

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Executive Office Of The Governor
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
As a Hazard Mitigation Grant Program (HMGP) project, the Sub-Recipient shall provide backup power to the R. Dan Nolan Middle School, located at 6615 Greenbrook Boulevard, Bradenton, Florida 34202. The HMGP project shall provide protection by purchasing and installing one (1) permanent generator with capacity of 1,250kW, or the adequate size determined by the vendor and/or an electrical engineer during the bid process, to appropriately support the critical facility. The project includes the construction of a concrete pad, installing a new automatic transfer switch (ATS), a supply diesel tank, fencing, generator enclosure, and electrical connections. The R. Dan Nolan Middle School serves as a special needs shelter in emergencies. Currently this facility is unprotected without any source of backup power during power outages. An interruption in the electric power supply would result in a loss of service of the special needs shelter and meal services. The project shall reduce the risk of electrical power loss to the special needs shelter and allow the County to maintain operations of the shelter’s services during future power outages. The generator(s) shall be protected against a 500-year flood event by implementing specific activities or by locating the generator(s) outside the Special Flood Hazard Area (SFHA), comply with applicable National Flood Insurance Program (NFIP) requirements and shall be protected against wind with a rated enclosure and appropriate anchoring based on its location requirements per ASCE 7 standards. The selected site shall provide sufficient space to maintain and fuel the generator(s) and shall comply with the National Electrical Code working clearance requirements. Activities shall be completed in strict compliance with Federal, State and Local applicable Rules and Regulations.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS