Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Manchester International Airport Phase 2 - Platform Civils

Open
International
Response DeadlineDue in 5 days
Solicitation #
C4N123805978

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Manchester International Airport Phase 2 - Platform Civils project focuses on increasing platform capacity at Manchester Airport station to accommodate longer train services and eliminate the need for double stacking. As part of the Manchester and North West Transformation Programme, the project involves remodelling the station through platform additions, extensions, or the provision of a new turnback facility. This redevelopment will allow for the permissive working of two 144m trains across two of the four platforms, ensuring that existing train operating company services can be maintained. The scope of work includes comprehensive civil engineering tasks such as platform demolition, asset recoveries, the installation of new riser walls, and the placement of copers and tactile paving. Additionally, the contract covers drainage, ducting, equipment foundations, waiting shelter foundations, and the installation of platform furniture and fencing. This solicitation, managed by Kier Transportation - CP7 NWC for the Government of the United Kingdom, has no specified set-aside status.

General Info

Kier Transportation will expand Manchester Airport station platforms to increase train capacity.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 5 days

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGovernment of the United Kingdom → Kier Transportation - CP7 NWC
Contacts1 person available
OfficeClippers Quay, M503XP, GBR

Full Description

Show more
"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The works comprise the construction and completion of the platform civils work at Manchester Airport Station. • Platform demolition • Asset recoveries • Track walkway/crossings • UTX • Troughing • Riser wall foundations • New riser walls (blockwork and PCC) • Copers (including realignment) • Tactile paving • Drainage (ACO's and carrier) • Ducting • Equipment foundations (in-situ and PCC) • Waiting shelter foundations • Platform furniture • SME works (end of platform ramps) • Fencing/Gate works • Block paving/surfacing • Associated reinstatement works

Similar Contracts

Same NAICS industry code

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS