Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

MANIFOLD, PRESS RED

Active
N0010426QZA56Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract pertains to the procurement of a Pressure Reducing Manifold assembly designed for critical shipboard systems where material integrity is paramount due to the potential for serious personnel injury, loss of life, or damage to naval vessels. Classified as Level I Special Emphasis material, it demands strict adherence to detailed design specifications, quality assurance measures, and traceability protocols. The manifold must conform to specific Vacco drawings and documents, incorporate precise materials like SAE and ASTM grade stainless steels, and meet rigorous oxygen cleaning and certification standards. Additionally, the assembly contains non-metallic components subject to stringent toxicity and flammability requirements per NAVSEA guidelines, with special off-gassing tests required from approved laboratories. The contractor is responsible for comprehensive quality management systems compliant with ISO and Navy standards, including material traceability from raw stock to finished products, detailed inspection, and certification of chemical, mechanical, and non-destructive testing data. Welding and brazing processes, when required, must be qualified with documented procedures and approvals, and all fasteners must be appropriately marked for identification. The contract also allows for partial and early deliveries with no additional cost and requires full compliance with national defense priority rating regulations. Documentation must be electronically submitted via the Navy’s Contractor Data Submission system, including production test procedures, certifications, and any requests for departures such as waivers or engineering change proposals. The procurement is managed by the Naval Supply Systems Command Weapon Systems Support at Mechanicsburg, PA, with strict government oversight on inspections and supplier audits to ensure conformity with all contractual and regulatory requirements.

General Info

Procurement of Level I Pressure Reducing Manifold with strict quality, traceability, and compliance requirements.

Agency

Department Of Defense → Navsup Weapon Systems Support MechView Agency

NAICS

332919 - Other Metal Valve and Pipe Fitting ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support Mech
View Agency Profile
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| GENERAL INFORMATION-FOB-DESTINATION|1|b| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material ||TBD|N00104|TBD|TBD|N50286|TBD|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| This amendment is being issued to increase the quantity and extend the closing date. 1.This is a procurement for the Level One Program. 2.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already onfile at NAVSUP WSS Mechanicsburg. 3.All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods such as email. The Government?s acceptance of the contractor?sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. 4.Partial and early delivery of requirement is authorized and desired and is at no additional cost to either the vendor or the Government. 5.NAVSUP WSS will be considering past performance in the evaluation of offers.See Clause 252.204-7024. 6.This award will be issued bilaterally, requiring the contractor?s written acceptance prior to execution. 7.This is a rated order certified for national defense use and the Contractor will follow all requirements of the Defense Priorities and Allocations System Regulation (15 CFR 700), see clause 52.211-14. 8. This item requires Oxygen Cleaning and Navy source certification. 9.The following proposed delivery schedule applies:Submission of all certification data CDRLS 20 days prior to delivery.PNSY review/acceptance of certification CDRLS 18 working days after receipt. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 This ;Pressure Reducing Manifold; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 1.1.2 LI-SOC ITEM - It has been determined that this item falls within both the Level I boundary and the Scope of Certification (SOC) boundary. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;S1E10205 99517 H B S3C10054 99517 E B S3C10053 99517 E B V3D10431 99517 J B V3D10436 99517 E B V3D10435 99517 E B V3D10434 99517 C B V3D10437 99517 G B F3C10321 99517 D B WI-S1E10205 99517 ^ B CDS-S1E10205-02 99517 A D; DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B138 | | | |110101|A| | | DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | | DOCUMENT REF DATA=ASTM-A182 | | | |240301|A| | | DOCUMENT REF DATA=ASTM-A240 | | |B |241115|A| | | DOCUMENT REF DATA=ASTM-A262 | | | |150901|A| | | DOCUMENT REF DATA=ASTM-A574 | | | |211201|A| | | DOCUMENT REF DATA=ASTM-A581 | | |B |950910|A| | | DOCUMENT REF DATA=ASTM-A582 | | | |221101|A| | | DOCUMENT REF DATA=ASTM-F606 | | | |191115|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=MIL-STD-1330 | | |E |220516|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=SAE AMS 5643 | | |W |211201|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-18240 | | |F |000313|A|1 | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=SAE AMS-QQ-S-763 | | |D |150301|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;The Pressure Reducing Manifold assembly must be in accordance with Vacco drawing S1E10205, part number S1E10205-02, with Vacco document WI-S1E10205 and Certification Data Sheet CDS-S1E10205-02, except as amplified or modified herein.; 3.2 ;NOTE: Vacco document WI-S1E10205 must be Revision D (R/C).; 3.3 Oxygen Cleaning - This material must be cleaned, tested, packaged & labeled by trained personnel and procedures in accordance with MIL-STD-1330, General. 3.4 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: ;Vacco drawing S1E10205, part number S1E10205-02 (Manifold Assembly); Part - ;BODY, Item 1; Material - ;SAE-AMS-QQ-S-763, Class 304, Condition A or ASTM-A182, Class 304 or ASTM-A240, Class 304; Part - ;FILTER CAP, Item 2; Material - ;ASTM-A582, Type 303; Part - ;PORT ADAPTER, Item 3; INLET PORT, Item 12; and OUTLET PORT, Item 13; Material - ;SAE-AMS-5643, Condition H-1025; Part - ;PLUG, Item 6; Material - ;SAE-AMS-QQ-S-763, Class 304, Condition A; Part - ;PLUG, Item 23; Material - ;ASTM-A582, Type 303; Part - ;SOCKET HEAD CAP SCREW, Items 27, 28, 29, 30, 31, 32, 33, and 35; Material - ;SAE-AMS-5643, Condition H-1025 with self-locking element per MIL-DTL-18240, Type L; ;Vacco drawing S3C10054, part number S3C10054-01 (Bleed Block Assembly); Part - ;BODY, Item 1; Material - ;SAE-AMS-QQ-S-763, 300 Series or ASTM-A582, 300 Series; Part - ;STEM, Item 2; Material - ;SAE AMS 5643, Condition H-1025 with self-locking element to meet the intent of MIL-DTL-18240, Type N; ;Vacco drawing S3C10053, part number S3C10053-01 (Gauge Connection Assembly); Part - ;BODY, Item 1; Material - ;SAE-AMS-QQ-S-763, 300 Series or ASTM-A582, 300 Series;; Part - ;STEM, Item 2; Material - ;SAE AMS 5643, Condition H-1025 with self-locking element to meet the intent of MIL-DTL-18240, Type N; ;Vacco drawing V3D10431, part numbers V3D10431-06 and V3D10431-05 (Regulator Assemblies); Part - ;POPPET, Item 2; STEM, Item 3; PISTON, Item 6; and STEM GUIDE, Item 16; Material - ;SAE-AMS-5643, Condition H-1025; Part - ;DISC COMPRESSOR, Item 4 and BODY, Item 5; Material - ;SAE-AMS-QQ-S-763, Class 304, Condition A; Part - ;DOME CAP, Item 7; Material - ;ASTM-A582, Type 303; Part - ;SEAL TUBE, Item 12; Material - ;ASTM-A581, Type 303, Condition A or ASTM-A582, Type 303, Condition A; Part - ;ORIFICE BLOCK, Item 15; Material - ;SAE-AMS-5643, Condition H-1150; Part - ;SELF-LOCKING SOCKET HEAD CAP SCREWS, Item 24; Material - ;SAE-AMS-5643, Condition H-1025 with self-locking element per MIL-DTL-18240 , Type L; ;Vacco drawing V3D10436, part number V3D10436-01 (Regulator Control Block Assembly); Part - ;BODY, Item 1 and ORIFICE BLOCK, Item 2; Material - ;SAE-AMS-QQ-S-763, Class 304, Condition A; Part - ;SEAT, Item 3;; Material - ;ASTM-B138, Alloy C67500 or ASTM-B150, Alloy C62400 or Alloy C63200; Part - ;STEM, Item 5; Material - ;SAE-AMS-5643, Condition H-1025; Part - ;GLAND, Item 6; Material - ;ASTM-B138, Alloy C67500, Half Hard; ;Vacco drawing V3D10435, part number V3D10435-01 (Inlet and By-Pass Valve Assemblies); Part - ;ORIFICE BLOCK, Item 1; Material - ;ASTM-A582, Type 303, Condition A; Part - ;BONNET, Item 2; Material - ;SAE-AMS-QQ-S-763, Class 304, Condition A; Part - ;POPPET, Item 3; Material - ;SAE-AMS-5643, Condition H-1025; ;Vacco drawing V3D10434, part number V3D10434-01 (Outlet Valve Assemblies); Part - ;ORIFICE BLOCK, Item 1 and BONNET, Item 2; Material - ;ASTM-A582, Type 303, Condition A; Part - ;POPPET, Item 3; Material - ;SAE AMS 5643, Condition H-1025; ;Vacco drawing V3D10437, part number V3D10437-01 (Relief Valve Assembly); Part - ;BODY, Item 1; Material - ;SAE-AMS-5643, Condition H-1025; ;Vacco drawing F3C10321, part number F3C10321-225 (DP Indicator); Part - ;BODY, Item 1 and BONNET, Item 4; Material - ;ASTM-A582, Type 303; Part - ;PISTON, Item 2; Material - ;SAE-AMS-5643, Condition H-1025; Part - ;ADJUSTING SCREW, Item 9; Material - ;ASTM-A582, Type 303 with self-locking element to meet the intent of MIL-DTL-18240, Type N; 3.5 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - 5x Visual Magnification or Dye Penetrant Inspection (root layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - Visual and Dye Penetrant Inspection (final layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;Liquid Penetrant Inspection; Item - ;SELF-LOCKING SOCKET HEAD CAP SCREWS: Items 27, 28, 29, 30, 31, 32, 33, and 35 drawing S1E10205 and Item 24 of drawing V3D10431; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;Production Testing; Item - ;Each Manifold Assembly; Performance - ;PTP developed from S1E10205; Acceptance - ;PTP developed from S1E10205; Test - Intergranular Corrosion Test (Only for SAE-AMS-QQ-S-763, Classes 304-condition A, 304L, 316-condition A, 316L, 317-condition A, 321 and 347 material. Test must be performed prior to fabrication/machining) Item - ;BODY, Item 1 and PLUG, Item 6 of drawing S1E10205; BODY, Item 1 of drawing S3C10054; BODY, Item 1 of drawing S3C10053; DISC COMPRESSOR, Item 4 and BODY, 5 of drawing V3D10431; BODY, Item 1 and ORIFICE BLOCK, Item 2 of drawing V3D10436; and BONNET, Item 2 of drawing V3D10435; Performance - SAE-AMS-QQ-S-763 Acceptance - SAE-AMS-QQ-S-763 Test - Intergranular Corrosion Testing Item - ;BODY, Item 1 of drawing S1E10205 (if ASTM-A240 material option used); Performance - ASTM-A262, Practice E Acceptance - ASTM-A262 Test - Non-Destructive Tests Item - ;Weld Repair (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification 3.6 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.7 Heat Treat Requirements - Mechanical properties (via tension testing and hardness testing if hardness is required by the applicable material specification) are required for each heat in each heat treat charge for ASTM-A234, ASTM-A403, ASTM-A182, and ASTM-A105 material. 3.7.1 If heat treatment is performed in continuous-type furnaces with suitable temperature control and equipped with recording pyrometers so that complete heat-treatment records are available, a heat-treatment charge must be considered as any continuous run not exceeding an 8-hr duration. One tension test must be taken from one forging per heat in each heat treatment charge at a minimum of every 8 hours. 3.7.2 Certification of Mechanical Properties (Mechanical Analysis, Tension Testing) must include the condition furnished. The contractor must maintain a complete record on file of the heat treatment given each piece, including stress relief. The contractor must provide either the record of the final heat treatment or a heat treatment certification statement. The certification statement must be signed by the heat-treater and include the date of heat treatment, duration and temperature of heat treatment operations and quenching medium (if required). 3.8 Wedge Tensile Test Specimens (Headed fasteners) - A wedge tensile test must be conducted on a Full Size Fastener for each production lot and reported aspart of the Mechanical Properties. The required specimens for the Wedge Tensile Test must be separate fasteners from those required for the Yield Test. 3.8.1 Testing for Socket Head Cap Screws must be in accordance MIL-DTL-1222, paragraphs 4.5.2.3 and 4.5.2.3.1. 3.8.2 Testing for all other Headed Fasteners with a nominal diameter greater than 1/4-inch must be in accordance with ASTM-F606 for grades 5, 8, B7, and B16.For all other grades, the following wedge angles must be used. a. Except as specified in item c below, fasteners with a nominal diameter of 1/4-inch through 1-inch (inclusive) must be tested with a ten degree wedge. b. Except as specified in item c below, fasteners with a nominal diameter over 1-inch must be tested with a six degree wedge. c. Fasteners that are of grades 8, B7, B16, 410, 416, 416Se, 431, and 630 and are threaded within one diameter to the underside of the head must be tested as follows: Sizes 1/4 inch through 3/4 inch (inclusive) Use a six degree wedgeSizes over 3/4 inch Use a four degree wedge d. Fasteners which have passed testing with wedge angles greater than those specified should be considered acceptable. 3.8.3 For fasteners having a length less than the minimum specified in Table 1 of ASTM-F606, one "test specimen fastener" must be manufactured from each lot of fasteners and tested to represent that lot. The length of these test specimen fasteners must meet the minimum specified in table 1 of ASTM-F606 but must not exceed it by more than 1/4 inch. Test specimen fasteners must be the same type, style, and diameter as the production lot and must be manufactured from the same starting material, using the same manufacturing techniques as the production lot, and must be heat treated (if required) along with the production lot. 3.9 Off-Gassing Analysis is required in accordance with NAVSEA SS800-AG-MAN-010/P-9290A, Appendix F, paragraphs F4.2, F4.3, and F4.4. Off-Gassing Analysis is not required for every lot of stock material (plate, bar, castings, etc.) formed by the same vendor, if NAVSEA SS800-AG-MAN-010/P-9290A, Section F4.4 is satisfied. 3.9.1 Off-Gassing Analysis must be conducted by one of the following labs: 1 ALS Simi Valley Mr. Michael Conejo 2655 Park Center Dr. Suite A Simi Valley, CA 93065 Phone (805) 577-2083 2 Electric Boat Corp. DSS-ACL Craig Adamson 75 Eastern Point Road Groton, CT 06340-4989 Phone (860) 433-5866 3 Naval Surface Warfare Center - Crane (NSWC-Crane) Mike Jones 300 Highway 361 Bldg 3395 Crane, In 47522-5001 Phone (812) 854-6313 Note: This lab contains the only chamber authorized for ordnance sampling. 4 Naval Experimental Diving Unit (NEDU) Chuck Mayberry 321 Bullfinch Road Panama City, Fl 32407 Phone (850) 230-3163 3.9.2 Each item being supplied for the off-gas test must be odor tested prior to shipment to the off-gas test lab. Perform the odor test per the requirements specified in paragraph F.4.4.1.b of NAVSEA SS800-AG-MAN-010/P-9290A. Note: The vendor must contact lab to determine test chamber size and depth limitations. Note: Each shipment of material to be off-gas tested must be accompanied by paperwork identifying the following: - The NSN - The Procuring Activity - The Contract Number - The Serial Numbers of units in shipment 3.9.3 The listed labs have been assessed and accepted; however, due to the requirements of biennial reassessments there could be occasions when a given lab may have restrictions levied on them. It is incumbent upon the customer to contact the lab or NAVSEA 07Q4 to ascertain the current lab status. NAVSEA point of contact is Mr. Greg Sorrells (SEA 07Q43) at (202)781-0910. 3.10 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.11 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID 887235466Y; ) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type "C" on brass or Type "H" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached. 3.12 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.13 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.13.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.13.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.13.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.14 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.15 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.15.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.16 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.16.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.16.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.16.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.17 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.18 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.19 ;See CDRL DI-MISC-80678 (Production Test Procedure) - A Production Test Procedure (PTP) for VACCO Industries drawing S1E10205, Assembly S1E10205-02 must be submitted for review and approval. Approval of the PTP must be obtained prior to performing any production testing.; 3.20 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.21 See CDRL DI-NDTI-80603A - Cleaning - Prior to performing any cleaning, the applicable cleaning procedure must be submitted for review and approval. If the Contractor's cleaning procedure has previously been approved by NAVSEA for this or other contracts, a copy of the original approval letter must be submitted in lieu of the actual procedure. 3.21.1 When cleaning is performed by a subcontractor, the requirements for submission of all documentation required herein must be passed down to the subcontractor. 3.22 See DI-MISC-80678 (SOC OFF-GASSING ANALYSIS) - Non-Metallic Material off-gassing test reports must, as a minimum, record the following data per NAVSEA SS800-AG-MAN-10/P9290, Appendix F: a. Testing facility name, address, and phone number. b. Date material tested. c. A positive statement that material composition was reviewed by NAVSEA to identify any additional target or non-target compounds prior to testing (See note below). d. Lot or batch number of material. e. Material chemical name or product name, model number, and serial number forend items/complete assemblies. f. Manufacturer of material. g. Sample weight. h. Sample surface area. i. Curing procedure - a description of pretest curing (include cure time and conditions) or burn-in operation (when applicable). j. Pressure and volume of test chamber. k. Temperature of test chamber. Indicate whether or not the electrical equipment/assembly was energized based on burn-in bench testing results. l. Total time specimen was in chamber before chemical analysis. m. Signature and date of test director. n. Test results: (1) List of constituents analyzed or identified. (2) Method of analysis used to analyze constituent (see Table F-5). (3) Allowable limit of each constituent (see Section F.6). (4) Reporting limit for each constituent (see paragraph F.5.4.c). (5) Absolute measured level of each constituent. (6) Normalized measured level of each constituent (ppm/L or ppm/g/L - see paragraph F.4.2.c) (7) Evidence of odor before and after the test (see paragraph F.4.4.1.b). (8) Curing/burn-in testing results, including cure time and cure conditions (e.g., temperature, pressure, cleaning, etc.). If burn-in bench testing of powered equipment was done prior to off-gas testing, annotate that along with test conditions. Note: The product name, including model and serial number, for end items may be used for complete equipment assemblies (also known as Commercial Off the Shelf (COTS) material) when the material chemical name is unknown. The testing activity must attempt to identify the non-metallic material of complete equipment assemblies and provide them when available. This option is not allowed for non-metallic material that is fabricated from raw non-metallic material that is fabricated from raw non-metallic material. The activity requesting laboratory off-gas testing must provide the Safety Data Sheet (SDS) to the appropriate Program Manager to ascertain whether additional target compounds or non-target compounds need to be looked for during the off-gas testing (See Section F.5.3.d). The non-metallic material off-gas test reports must be evaluated in accordance with Section F.6. All off-gas test reports will be retained and maintained in a manner suitable for audit. Non-metallic off-gas test reports that are used to qualify a specific material or are being used in lieu of the testing specified in Section F.5.5 must be submitted to the Program Manager for approval and will be maintained to support DSS certification. 3.23 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds when the conditions of Section 4.2.1.1 of S9074-AR-GIB-010A/278 are met. 3.23.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.23.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.23.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.23.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.23.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.23.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.23.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.23.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.23.9 When production or repair welding is required on titanium materials, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.23.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.23.11 See CDRL DI-MISC-80678 (Consumed Weld Metal) - A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.23.12 When production welds or repair welds are performed by a subcontractor,the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.24 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.24.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.24.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.24.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.24.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.24.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.25 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.25.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.25.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.26 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.26.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.26.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.26.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.26.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.26.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.27 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.27.1 Visual examination upon receipt to detect damage during transit. 3.27.2 Inspection for completeness and proper type. 3.27.3 Verification of material quality received. 3.27.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.27.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.27.6 Identification and protection from improper use or disposition. 3.27.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.27.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.27.9 Material returned to the contractor must be handled as GFM. 3.28 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.28.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.29 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.29.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.29.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.29.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the assembly identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.29.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ;;;; 3.30 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.30.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.30.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified with a new traceability number. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below. 3.30.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.30.4 ELECTRONIC SIGNATURES. 3.30.5 Electronic signatures on Level I certification documents are considered equivalent to handwritten signatures. 3.30.6 Suppliers that use electronic signatures to authenticate company certifications and reports must ensure that process is controlled and unique to the individual signing the document. The signer must take a distinct action to electronically sign the document. 3.30.7 Suppliers must develop one method of authentication to be provided at the time of signature. The authentication method must be based on something known only to the signer (e.g., a password) or based on something only the signer possesses (e.g., a card or other device). 3.30.8 Electronic signature applications must not allow unauthorized users tochange electronically signed documents or records. All changes to electronically signed documents or records made by authorized users must be revision- or date-controlled, must identify the person making the change, and must clearly reflect that the document or record has been revised. 3.30.9 The prime contractor, as a minimum, must flow down the electronic signature requirements to their sub-tier suppliers and sub-contractors that provide electronically signed company certifications and reports to ensure that they have a procedure to control and identify unique processes for only allowing authorized individuals to sign documents. 3.30.10 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.30.11 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.30.12 Revisions of OQE must be provided by the originating organization and must include a description of the data modified along with the proper signature requirements herein. 3.30.13 In cases of foreign certification, conversion of foreign language unitsof measure and properties measured into U.S. units of measure must be annotated on the furnished foreign certifications, if space permits, or placed on an addendum in the same format as the foreign certification data. Such conversion must be identified as to origin with name, title, and signature of the authorized representative of the company making the conversion. 3.30.14 The certification data requirements contained in this appendix must beinvoked on the prime contractor who must delegate these requirements to all sub-tier contractors supplying Level I material. 3.31 Material Handling - The written material control process must include the following: 3.31.1 All raw materials must have traceability markings (except as specified below). 3.31.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.31.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.31.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.31.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.31.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.32 Receiving inspection - 3.32.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.32.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.33 Discrepancy reporting - 3.33.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR). 3.34 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.34.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.34.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.34.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.34.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.35 Additional Marking for Fasteners - Fasteners must be marked in accordance with ;MIL-DTL-1222. SAE-AMS-5643, Condition H-1025 material is Material Designator SMM; . The method of marking must be types I, II, III, V, VIII or IX of MIL-STD-792 except for grades 410, 416 and 431 in the H condition and grades 8, 630, A574, and 4340 which must be marked by method II when marking is applied after the final heat treatment. Markings on fasteners that are to be coated must be marked prior to coating and have a minimum depth of 4 mils. Traceability marking must be legible after the application of protective compounds. 3.35.1 Marking is required for all fasteners regardless of size and must include the material symbol, the manufacturer's identification symbol, and the traceability marking. Marking must be applied on the head of headed fastener (top preferred, side location if necessary). Self-Locking screws must also be marked with six dots. Where no contract invoked specification requirement exists for this marking, self-locking fasteners must be marked with six dots approximately .032" diameter, raised or depressed by approximately .010" located on the top perimeter of the head of the fastener in an arc or circular pattern. The six dots must be distinguishable from all other required markings. 3.36 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address and date. 2. The contract/purchase order number (for example: N00104-11-P-FA12) 3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable). 5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily. 9. Contractor's or authorized personnel's signature. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES ;TDP contains custom DI-MISC-80678 for PTP. This BP is for reference only and will be removed upon migration to ITIMP.; 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or sp

Similar Contracts

Same NAICS industry code

NAICS: 332919
New
DIBBS
TEE, PIPE
Solicitation # SPE7M2-26-Q-0717
This contract specifies the procurement of a copper alloy socket type tee fitting with a nominal pipe size of 1 inch, manufactured via a metal casting process requiring specialized tooling. The item is identified by NSN 4730-00-542-5250 with a quantity of 385 units, and delivery is required within 100 days of award. All technical and quality requirements referenced in the document are governed by the DLA Master List of Technical and Quality Requirements, with the applicable revision determined by the solicitation or award date depending on the acquisition size. The contract mandates strict adherence to DLA packaging standards, configuration change management through engineering change proposals, and the removal of government identification from non-accepted supplies. Mercury or mercury-containing compounds are prohibited from intentional addition or direct contact with the product except for specific functional uses such as batteries, fluorescent lights, sensors, controls, weapon systems, or NAVSEA-specified reagents; portable mercury-containing devices must be shock-proof with a secondary containment barrier per NAVSEA 5100-003D. The supplier is required to furnish one Certificate of Quality Compliance (COQC) for each manufacturing lot, prepared in accordance with the Supplemental Quality Assurance Provision, and make it available for Government review at the point of inspection if applicable. An electronic copy of each COQC must be uploaded as an attachment to the Receiving Report in the iRAPT system for Government records. The COQC documentation is considered part of the item’s price, and compliance is mandatory for acceptance. The solicitation is a total small business set-aside under FAR 19.5 with a response deadline of August 11, 2026, and the point of contact for inquiries is Alla Yakover. The place of performance is New Cumberland, PA, and the contracting activity falls under the Department of Defense’s Nuclear Reactor Program.
NUCLEAR REACTOR PROGRAM

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 332919
New
DIBBS
COUPLING HALF, QUICK
Solicitation # SPE7M3-26-T-7831
The contract pertains to the procurement of 29 units of a Coupling Half, Quick Disconnect with NSN 4730-01-603-5705 and part number 60CHD2-33446, issued under solicitation SPE7M3-26-T-7831 by the Department of Defense’s Fluid Handling Division. The item is to be delivered FOB origin within 167 days of the contract award, with no tolerance for quantity variance. Inspection and acceptance occur at the destination, and all packaging must comply strictly with ASTM D3951 and MIL-STD-129, while adhering to DLA Packaging Requirements as outlined in RP001. The DLA Master List of Technical and Quality Requirements supersedes any conflicting standards. Each unit must be labeled and packed in accordance with specified government protocols, with the Unit of Issue being each (EA) at a unit price of $29.00, totaling $841.00. Delivery is directed to the DLA Distribution facility at 2083 Normandy Drive, Door 113 to 134, New Cumberland, PA 17070-5002, with an original required delivery date of October 14, 2026, and a need ship date of February 1, 2027. Transportation procedures follow DLAD Proc Notes C19 and C20, and all items must be palletized as mandated. The contract enforces the removal of government identification from non-accepted supplies and references applicable technical and quality specifications listed in the DLA Master List, with revisions controlled by either the solicitation issue date or award date depending on acquisition size.
FLUID HANDLING DIVISION

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details
NAICS: 332919
New
DIBBS
NUT ASSEMBLY, TUBE COUP
Solicitation # SPE4A6-26-T-11XP
The contract pertains to the procurement of 11 units of a nut assembly for tube coupling, identified by NSN 4730-01-478-8450 and part number BACN10ZA1ZW, under solicitation SPE4A6-26-T-11XP. Delivery is required within 171 days of contract award, with FOB origin terms and inspection and acceptance occurring at the destination. The unit of issue is each, with zero variance permitted in quantity. All items must be packaged in accordance with ASTM D3951 and labeled per MIL-STD-129, with palletization strictly following DLA Packaging Requirements for Procurement. The DLA Master List of Technical and Quality Requirements governs all technical specifications, overriding any conflicting standards, and includes mandatory adherence to tailored quality requirements, source approval documentation, and removal of government identification from non-accepted supplies. Item Unique Identification is not required per customer request. Sampling must comply with MIL-STD-1916 or ASQ H1331 using zero non-conformances unless otherwise specified, with critical, major, and minor attributes assigned verification levels VII, IV, and II or AQLs of 0.1, 1.0, and 4.0 respectively. Measuring and test equipment must meet RT001 standards. The delivery destination is the DLA Distribution facility in New Cumberland, Pennsylvania, and all transportation logistics must follow DLAD Proc Notes C19 and C20. The original required delivery date is October 20, 2027, with a need ship date of January 31, 2027. The contract falls under NAICS code 332919 and is administered by the Department of Defense’s ASC Commodities Division, with primary point of contact John Schaefer.
ASC COMMODITIES DIVISION

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details
NAICS: 332919
New
DIBBS
REPAIR KIT, VALVE
Solicitation # SPE7M1-26-T-248T
The contract is for a repair kit for a valve with NSN 4820-01-622-4438 and part number 0888830, supplied by Watts Regulator Co, under solicitation SPE7M1-26-T-248T. Two kits are required to be delivered within five days to a military destination in APO AE 09865-0061, with delivery terms FOB destination and zero tolerance for quantity variance. The items must be packaged and preserved in strict compliance with MIL-STD-2073-1E Appendix D for kits and marked in accordance with MIL-STD-129, with palletization following DLA packaging requirements. The repair kit must not contain any intentionally added mercury or mercury compounds except in specific exempted devices such as functional batteries or weapon systems, and portable fluorescent lamps or instruments containing mercury must have shock-proof housing and a secondary containment boundary as per NAVSEA 5100-003D. The use of Class I ozone-depleting substances in any phase of manufacture or processing is prohibited unless written approval is obtained from the contracting officer, and this restriction overrides all other specifications without diminishing product performance standards. Packaging data includes specific preservation methods and materials designated as ZZ, and the unit of issue is KT. Delivery is scheduled for August 3, 2026, with no flexibility on the required date. All technical and quality standards referenced are governed by the DLA Master List of Technical and Quality Requirements, with the controlling revision determined by the solicitation or award date depending on acquisition size. The contract is managed under the Department of Defense’s Maritime Supply Chain, and point of contact is Misty Eckard.
MARITIME SUPPLY CHAIN

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details
NAICS: 332919
New
DIBBS
COVER PLATE, VALVE
Solicitation # SPE7M1-26-T-249K
The contract is for one cover plate, valve with NSN 4810-01-621-3856, under solicitation SPE7M1-26-T-249K, issued by the Department of Defense through the Maritime Supply Chain. The item must be delivered within five days of contract award, FOB origin, with no tolerance for variance in quantity. Inspection and acceptance occur at the destination, specifically at Puget Sound Naval Shipyard IMF in Bremerton, WA, with special shipment routing instructions referenced in DLAD Proc Notes C19 and C20. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, using unit container E5, no special marking, and palletization per DLA packaging standards. The supplier, SAUER COMPRESSORS USA, INC., must ensure no intentional addition of mercury or mercury compounds, except for specified exempted uses such as functional components in batteries, instruments, or chemical reagents approved by NAVSEA, and any portable mercury-containing devices must have shockproof construction and a secondary containment boundary per NAVSEA 5100-003D. The required delivery date is July 29, 2026, and all technical and quality requirements are governed by the DLA Master List of Technical and Quality Requirements, with revisions controlled by the solicitation issue date. The point of contact for the contract is Misty Eckard, and the item is classified under NAICS code 332919.
MARITIME SUPPLY CHAIN

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 332919
New
Federal
STEM DISC BONNET AY
Solicitation # N0010426QEC93
The contract pertains to the procurement of a STEM DISC BONNET AY under solicitation N0010426QEC93, with a response deadline of September 3, 2026, and is issued by the Navsup Weapon Systems Support Mech under the Department of Defense. All technical and quality requirements are governed by the Individual Repair Part Ordering Data (IRPOD), which is mandatory for vendor review and forms the core of compliance. The order of precedence for resolving conflicts prioritizes contract amendments, then the schedule, terms and conditions, and finally referenced documents such as drawings, specifications, and STRs, with all cited documents required to be used in their entirety at the specified revisions unless explicit approval is obtained. The contractor must maintain an inspection system compliant with government standards, submit all test and inspection reports electronically via Wide Area Workflow (WAWF), and adhere to strict packaging standards including those specified in MIL-PRF-23199 and MIL-STD-2073, particularly for items requiring cleanliness controls. No mercury or mercury-containing compounds may be introduced into the product or its packaging. Pricing is valid for 60 days after the closing date, and contractual documents are deemed issued upon electronic transmission or mailing. The contractor is required to submit pre-manufacturing procedure packages within 45 days of award and certified reports of test and inspection per DI-QCIC-8872, with separate documentation required for each unique contract number, NSN, and item nomenclature. Distribution of technical data is restricted, with certain documents labeled NOFORN and subject to export control approval from the Naval Sea Systems Command. Commercial specifications not available through government sources must be obtained from original publishers. All submissions must comply with DD Form 1423 formatting guidelines, including proper Block entries for data type, approval status, distribution level, and delivery frequency. The contract enforces mandatory use of the Workflow PRO module, prohibits deviations from critical technical or delivery requirements without documented justification and government concurrence, and includes full compliance with small business program representations, veteran and disabled worker equal opportunity clauses, cybersecurity maturity certification, and nuclear material handling restrictions. Delivery is FOB destination, and payment instructions must follow Wide Area Workflow protocols.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336612
New
Federal
HUB,PROPELLER,SHIP
Solicitation # N0010426QTB92
This contract, issued under Emergency Acquisition Flexibilities, seeks repair services for the HUB, PROPELLER, SHIP under solicitation N0010426QTB92, with a mandatory Repair Turnaround Time of 650 days measured from physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility system. The contract requires strict adherence to MIL-STD-130 for item marking, ABS certification for each repaired unit with original signed certificates delivered with the asset and electronically in PDF format within seven calendar days of inspection, and compliance with all referenced technical standards and contractor-approved repair procedures. All work must be performed in accordance with government-approved drawings and directives, and any design, material, or part number changes require prior written approval by the NAVICP-MECH Contracting Officer, with substitutions categorized and documented under specific code requirements. The procurement is firm-fixed-price and subject to significant penalties for failure to meet the RTAT, with monthly price reductions per unit for unexcused delays up to a maximum amount specified by the contractor, without limiting the Government’s right to terminate for default. Government Source Inspection is mandatory, freight is FOB Origin and managed via the Navy’s Commercial Asset Visibility system, and the contractor must maintain all inspection records for 365 days after final delivery. The contract enforces Buy American provisions, cybersecurity maturity certification requirements, and small business subcontracting obligations, with mandatory use of Workflow Pro for payment and invoice submissions. Only authorized distributors of the original manufacturer may qualify, requiring proof of authorization, and all technical documents received from the Navy must be handled in accordance with designated distribution statements, particularly protecting against unauthorized disclosure. The awardee must also compare repair pricing to new unit cost and delivery lead time, and all deliverables must comply with DD Form 1423 data requirements.
Boat Building

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 333998
New
Federal
COUPLING ASSY, 1/4
Solicitation # N0010426QFC38
This contract involves the procurement of a 1/4 Inch Coupler Assembly designed for critical shipboard systems where failure could result in severe personnel injury, loss of life, or major equipment damage. The assembly is classified as Special Emphasis material (Level I, Scope of Certification) and must adhere to stringent material, manufacturing, and quality standards. The coupler includes non-metallic materials that require compliance with NAVSEA toxicity and flammability standards, and all materials and processes such as oxygen cleaning, welding, brazing, and thread inspection must follow detailed military and industry specifications. Thorough documentation, including certificates of compliance and certifications for chemical, mechanical, and non-destructive tests, is mandatory and must accompany shipments. The contract enforces tight traceability controls from raw materials through final assembly to ensure full conformance with approved specifications. Quality assurance requirements are extensive and include mandatory government quality system audits, source inspections, and strict control over subcontractors and government-furnished materials. Sampling plans for inspections follow prescribed standards with zero-defect criteria for lot acceptance. Engineering changes, waivers, or deviations require formal approvals, and all changes affecting product configuration must be documented and controlled. Packaging and marking must meet military standards, and deliveries are subject to acceptance only after certification data is reviewed and approved via the Wide Area Work Flow system. The contract also incorporates priority rating under the Defense Priorities and Allocations System for national defense and embodies emergency acquisition flexibility provisions. The overall intent is to assure the delivery of fully verified, high-reliability components essential to Navy ship safety and operational readiness.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details
NAICS: 335931
New
Federal
DUST COVER ARINC600
Solicitation # N0010426QEC43
The contract pertains to the procurement of a Dust Cover ARINC600 under solicitation number N0010426QEC43, issued by the Naval Supply Systems Command Weapon Systems Support Mechanical (NAVSUP WSS-MECH) within the Department of Defense. The item must be manufactured by TE Connectivity Corporation with part number 213337-1 and must strictly conform to the technical specifications outlined in the contract, including design, materials, and dimensions. Any deviation from these requirements must be formally requested in advance with full justification, technical data supporting the alternative, and demonstration that the proposed change will not affect the part’s quality, form, fit, or function. The contract prohibits the intentional introduction of mercury or mercury-containing compounds into the product and requires full compliance with applicable cleaning and packaging standards, particularly MIL-PRF-23199 and MIL-STD-2073, with specific guidance on the use of heat-sealed envelopes and green poly bags for cleanliness-controlled components. Packaging materials must not include fire retardant, which is no longer required. Quality assurance obligations mandate that the contractor maintain a government-acceptable inspection system with records available throughout contract performance. The contract incorporates multiple standardized clauses including inspection and acceptance procedures, transportation by sea, cybersecurity maturity certification requirements, and mandatory use of Workflow Pro for payment processing. It also mandates adherence to priority rating requirements for national defense and energy programs, applies a total small business set-aside, and enforces security prohibitions as per deviation 2026-O0025. The awarding agency confirms that contractual documents are considered issued upon electronic transmission and that pricing submitted is valid for 60 days post-closing unless otherwise specified. Technical data package requirements are defined via DD Form 1423 with specific blocks for delivery timing, inspection authority codes, distribution statements, and pricing categories. All deliverables must be accompanied by a Certificate of Compliance per DI-MISC-81356 upon material delivery and must adhere to distribution restrictions defined by standardized codes (A–F) for information safeguarding. The response deadline is September 3, 2026, and the NAICS code 335931 identifies the industry as other electrical equipment and component manufacturing. All documents referenced must be used in their entirety unless approved otherwise by the contracting officer, and any request for revision exceptions requires two full-size printed copies for review.
Current-Carrying Wiring Device Manufacturing

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 339991
New
Federal
SEAL ASSEMBLY
Solicitation # N0010426QFF88
This contract pertains to the refurbishment and delivery of a SEAL ASSEMBLY under solicitation N0010426QFF88, with a strict focus on safety-critical application in naval shipboard systems. The item is classified as Special Emphasis Level I, requiring full traceability from raw material through every manufacturing and repair step to final delivery, due to the high risk of catastrophic failure if defective. All work must conform to exacting standards including welding requirements under S9074-AQ-GIB-010/248 and S9074-AR-GIB-010A/278, chemical and mechanical testing per MIL-C-15726 and MIL-C-24679 for specific components, and mandatory non-destructive inspection using dye penetrant methods. Contractors must submit comprehensive Objective Quality Evidence including certified test reports, material certifications with electronic signatures, and weld procedure qualifications prior to any production. All deliverables must be accompanied by certifications submitted via WAWF to Portsmouth Naval Shipyard with designated DODAACs N50286 and N39040, and no material may be shipped without prior formal acceptance. The contract mandates a firm fixed-price or not-to-exceed quote covering full teardown, evaluation, inspection, and repair to "like new" or "A" condition, including a separate beyond-economic-repair price. Materials must be free of mercury, and traceability markings must be permanently applied in accordance with MIL-STD-792, with special provisions for small or plated surfaces requiring durable tags. Quality systems must comply with ISO-9001, ISO-10012, and ISO/IEC 17025, or alternately MIL-I-45208 and MIL-STD-45662, and are subject to government quality assurance at source with DCMA oversight. Receiving and final inspections require 100% verification of certification documents, traceability marks, and NDT results, with zero-defect acceptance criteria. Contractors must flow down all quality, certification, and traceability requirements to subcontractors, maintain detailed records, and submit any waivers or deviations through ECDS for contractual approval. Delivery is capped at 365 days from contract effective date, with certification data submissions due 20 days prior to each shipment. The entire process is governed by Buy American, cybersecurity maturity, and security exclusion clauses, with all contractual
Gasket, Packing, and Sealing Device Manufacturing

POSTED

about 7 hours ago

DEADLINE

in 15 days
View Details
NAICS: 335929
New
Federal
CABLE,COAX ARMOR
Solicitation # N0010426QEC25
The contract pertains to the procurement of COAXIAL ARMOR CABLE under solicitation N0010426QEC25, issued by the Naval Supply Systems Command Weapon Systems Support Mechanical Office. Pricing is valid for 60 days after the closing date unless otherwise specified, and all contractual documents are deemed issued upon electronic transmission or mail delivery. The scope mandates strict adherence to the Individual Repair Part Ordering Data (IRPOD) as the primary technical reference, with precedence given to contract amendments, schedule provisions, and terms and conditions in case of conflicts. Contractors must comply with specified revisions of referenced technical documents obtained via the BPMI e-Commerce portal, and may not mix revisions without written approval. All supplies must meet cleanliness control standards as defined in MIL-STD-767, MIL-STD-2041, or other IRPOD-identified requirements, and packaging must conform to MIL-PRF-23199 with specific provisions for heat-sealed envelopes and green poly bags; fire-retardant packaging is expressly prohibited. Mercury and mercury-containing compounds are strictly excluded from any part of the supplied material. Quality assurance obligations are governed by the IRPOD, requiring contractors to maintain an approved inspection system and retain complete inspection records available for government review throughout contract performance and beyond. Technical Data Packages (TDPs) are referenced through DD Form 1423, with specific instructions on data delivery timing, format, approval requirements, and distribution restrictions governed by DoD codes A through F. The cable must be delivered in 500-foot continuous lengths, accompanied by a Certificate of Compliance per DI-MISC-81356 for each unique NSN and item nomenclature combination, submitted at time of delivery. The contract enforces mandatory use of Workflow Pro, compliance with cybersecurity maturity model requirements, and adherence to small business program representations, veteran and disability equal opportunity mandates, and security prohibitions. A total small business set-aside is in effect, with NAICS code 335929 applicable. Delivery must occur at the specified location with inspection and acceptance governed by government representatives, and all waivers or deviations must be submitted in advance with full technical justification and supporting documentation. The contract is governed by FOB destination terms and requires adherence to priority rating for national defense purposes.
Other Communication and Energy Wire Manufacturing

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 333914
New
Federal
COMPRESSOR,ROTARY
Solicitation # N0010426QJC06
This contract solicitation, issued under Emergency Acquisition Authority, seeks repair services for a ROTARY COMPRESSOR under a firm-fixed-price structure with a mandatory 636-day Repair Turnaround Time (RTAT), measured from physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. All quotations must include unit and total pricing, confirmed RTAT, and, if unable to meet the required timeline, a detailed explanation of capacity constraints. The Government requires full compliance with MIL-STD-130 Rev N for marking, adherence to manufacturer specifications and technical directives, and performance of all inspections and tests consistent with original design standards. Inspection is mandatory and may be conducted by the Government at any point; contractor records of all inspection activities must be maintained for 365 days post-delivery. Delivery is FOB Origin, with freight handled by the Navy, and the contractor must ensure accurate CAV system reporting within five business days of receipt. Any failure to meet the RTAT will result in a per-unit, per-month price reduction, capped at a specified maximum, without limiting the Government’s right to terminate for default. The contractor must be an authorized distributor of the original manufacturer’s item, providing documented proof of authorization with the quote. The Cage Code for the awardee and any facility where repair occurs must be specified, and pricing must be justified against historical data or commercial market rates if the item has not been previously procured by NAVSUP WSS or if pricing exceeds prior levels. If an item is deemed Beyond Repair (BR), a limited T&E fee not to exceed a specified amount may be negotiated based on incurred costs. All technical documents referenced are to be obtained through official DoD sources, with strict controls on the distribution of materials marked with distribution statements such as C, D, E, or F, in alignment with OPNAVINST 5510.1. Compliance with cybersecurity maturity model certification requirements, small business subcontracting goals, and the mandatory use of Workflow Pro (WFP) Mod Assist are also contractually enforced. This solicitation is bilateral, requiring the contractor’s signed acceptance prior to award, and all responses must verify nomenclature, part number, and NSN prior to submission.
Measuring, Dispensing, and Other Pumping Equipment Manufacturing

POSTED

about 7 hours ago

DEADLINE

in 15 days
View Details
NAICS: 314999
New
Federal
56--CLOTH, SALMON
Solicitation # N0010426QEB02
The contract is for the procurement of 64 rolls of salmon-colored cloth identified by NSN 1H-5640-016639974-X3 with TDP Version 004, to be delivered to two locations: W25G1U in New Cumberland, Pennsylvania, and W62G2T in Tracy, California, both under DLA Distribution. The Government does not own the data or intellectual property rights necessary to source this item from alternative suppliers, and it has been determined that acquiring those rights or reverse engineering the part would be uneconomical. As a result, the Government intends to proceed with a sole-source procurement under FAR 6.302-1, limiting competition to a single vendor. Although this is not a formal request for proposals, any responsible sources may submit interest, capability statements, or quotations within 45 days of the notice publication, or within 30 days if awarded under an existing Basic Ordering Agreement, and these submissions will be reviewed solely to evaluate whether a competitive procurement is warranted. The final decision to proceed without competition rests entirely at the Government’s discretion. The solicitation number is N0010426QEB02, posted on July 18, 2026, with a response deadline of September 2, 2026. The item is classified under the title “56--CLOTH, SALMON” and the contracting office is the Navsup Weapon Systems Support Mech, part of the Department of Defense, located in Mechanicsburg, Pennsylvania. The primary point of contact for inquiries is Amber C. Long, reachable via email at AMBER.C.LONG3.CIV@US.NAVY.MIL or by phone at (771) 229-0053. No set-aside type or NAICS code is specified, and the place of performance is not further detailed beyond the delivery addresses. All submissions must be received by the deadline to be considered, and no assurance is given that competition will be opened regardless of responses received.
All Other Miscellaneous Textile Product Mills

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335313
New
Federal
SWITCH ASSEMBLY
Solicitation # N0010426QYA11
This contract pertains to the repair of a SWITCH ASSEMBLY under a fixed-price arrangement, with requirements governed by military standards and Navy-specific directives. The work must conform to the original manufacturer’s specifications and drawings, and all repairs must be performed using the contractor’s approved technical procedures, manuals, and tooling instructions. The item must be marked in compliance with MIL-STD-130 Rev N and must be completely free of metallic mercury and mercury contamination, as its use is prohibited on submarines and surface ships due to severe corrosion and toxicity risks. Any proposed design, material, or part number changes require prior written approval from the NAVICP-MECH Contracting Officer, with substitutions categorized under specific code designations. The contract mandates rigorous quality assurance, with the contractor fully responsible for all inspections and testing, maintaining records for 365 days after final delivery. Preservation, packaging, and marking must adhere to MIL-STD-2073, and all subcontractors must comply with the same mercury-free and quality standards. The solicitation, identified as N0010426QYA11, has a response deadline of June 22, 2026, and is issued under Emergency Acquisition Flexibilities with an estimated RTAT of 125 days, which includes time to repair the item to "A" condition and return it to the Navy. The resultant award requires bilateral acceptance, and contractors must include the option for increased quantity in their proposals. Only authorized distributors of the original manufacturer may submit offers, requiring formal documentation to verify authorization. The contract incorporates Buy American provisions, warranty coverage for one year after delivery, and limitations on pass-through charges. It also includes clauses for annual representations and certifications, priority ratings for national defense purposes, and compliance with the wide area workflow payment system. Technical documents referenced are obtainable through specific Navy and DOD channels, with strict controls on distribution statements to prevent unauthorized dissemination. All correspondence and submissions must be directed to the designated point of contact, Jessica M. Gershenfeld, via email.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

about 7 hours ago

DEADLINE

in 29 days
View Details
NAICS: 332919
New
Federal
PARTS KIT,BALL VALV
Solicitation # N0010426QFG15
This contract requires the supply of a specialized parts kit for a size 5-inch ball valve, including a ball and two seats, intended for use in a critical shipboard system where failure could lead to catastrophic consequences including loss of life or the vessel itself. The materials must meet exacting specifications, with the ball fabricated from SAE-AMS-6931 or centrifugally cast 6AL-4V titanium meeting ASTM-B367 Grade C-5 standards, and the seats made from Torlon 4503, 4203, or 4203L polyamide-imide per Electric Boat Specification 4147. Strict certification and traceability protocols are mandated, requiring full chemical and mechanical documentation linked to unique heat or batch codes permanently marked on each component. The ball must undergo hydrostatic or dye penetrant testing with zero tolerance for leakage or deformation, and ultrasonic inspection is required for the starting material. All welding and brazing must comply with S9074-AQ-GIB-010/248 or 0900-LP-001-7000, with procedures and personnel qualifications submitted for Navy approval prior to execution. The contract imposes a comprehensive quality assurance framework requiring ISO-9001 or MIL-I-45208 quality systems, with government oversight at the manufacturer’s facility, and mandates that all certifications be submitted via the Wide Area WorkFlow system to Portsmouth Naval Shipyard for review and acceptance prior to shipment. Material traceability must be maintained from raw stock through every manufacturing and subcontracted operation, with non-metallic parts requiring batch-specific certifications and metallic parts undergoing re-certification if subjected to processing that alters properties. Deliveries are restricted to one year from contract effective date, with no material allowed to be shipped without formal acceptance by the government. The contractor must maintain detailed records of inspections, defects, and corrective actions, and all waivers or deviations require written approval from the Contracting Officer. The requirement is a total small business set-aside, subject to Buy American and security restrictions, and necessitates a facility clearance for access to classified drawings referenced under DD Form 254. All documentation must be electronically submitted through ECDS, and the contractor is bound by mandatory Navy regulations including mercury-free compliance, configuration control, and non-destructive testing standards.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 7 hours ago

DEADLINE

in 28 days
View Details
NAICS: 335931
New
Federal
61--FUSE BLK/EMI A11, IN REPAIR/MODIFICATION OF
Solicitation # N0010426QDB12
This contract solicitation, numbered N0010426QDB12, solicits repair services for the FUSE BLK/EMI A11 component under a firm-fixed-price arrangement, with a mandatory Repair Turnaround Time (RTAT) of 78 days measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. All repairs must comply with the original manufacturer’s specifications, and the contractor is required to adhere to MIL-STD-130 Rev N for item marking and MIL-STD-2073 for packaging. The Government will conduct mandatory inspections, and the contractor must maintain complete inspection records for 365 days post-delivery. Freight is FOB Origin and managed by the Navy under the CAV Statement of Work; all quotes must include unit and total prices along with the proposed RTAT, and failure to meet the 78-day requirement necessitates disclosure of capacity constraints. Repair performance is subject to a detailed subcontracting plan, Buy American provisions, cybersecurity maturity certification, and compliance with Defense Federal Acquisition Regulation Supplement clauses, including the mandatory use of Workflow Pro and the release of offeror information under Navy protocols. The awardee must hold authorization as an official distributor of the original manufacturer, and proof of authorization must accompany the proposal. The contract includes strict prohibitions against unapproved design, material, or part number substitutions, with any changes requiring written approval from the NAVICP-MECH Contracting Officer and classification under specific Code designations. Pricing must account for all costs related to repairing items in unwhole, damaged, or incomplete condition, and if an item is deemed beyond repair, a negotiated teardown and evaluation fee not to exceed a specified amount may apply. The contract also incorporates clauses on security exclusions, annual representations, cybersecurity readiness, and small business subcontracting obligations. All technical documentation referenced must be obtained through official DoD sources, with distribution restrictions governed by seven defined codes and safeguarding requirements under OPNAVINST 5510.1. Proposals are due by August 18, 2026, and the award will be bilateral, requiring the contractor’s written acceptance before execution. The award will be managed by the Navy Supply Systems Command in Mechanicsburg, Pennsylvania, and all communication must be directed to the designated point of contact.
Current-Carrying Wiring Device Manufacturing

POSTED

about 7 hours ago

DEADLINE

in 27 days
View Details