Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Ohio was posted on May 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Manufacture of Vertical Bed Storage Racks

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332312
New
SLED
Metal Sign Posts
Solicitation # 2026-ITB-181
Pierce County's Planning and Public Works department is soliciting bids for the procurement of Telespar or approved-equal metal signposts and related hardware to support regional infrastructure. The required materials must be cold rolled carbon sheet steel conforming to ASTM A1011/A1011M Grade 50, with a minimum tensile strength of 65,000 PSI. All posts must feature a hot dipped galvanized coating conforming to ASTM A653/A653M Grade-90, ensuring they are galvanized both inside and out for their entire length. Deliverables include various post configurations and accessories such as cast aluminum sign caps, 90-degree crosspieces, surface mount post bases, and 3/8 inch steel rivets. The contract will be awarded to the responsible bidder who submits the lowest responsive bid. Bidders must provide a written manufacturer certification detailing the product's yield and tensile strength and confirming a certified quality assurance program. Submissions must be made via the OpenGov portal by 1:00 PM on November 20, 2026, and must include a completed invitation to bid and pricing proposal. All pricing must be FOB Destination, Prepaid and Allow. The resulting agreement will be governed by Washington law, with payments processed monthly through the County voucher system based on documented work performed. Contractors are required to provide a Certificate of Insurance naming Pierce County as an additional insured and must comply with non-discrimination, ADA, and prevailing wage requirements.
Planning and Public Works

POSTED

2 days ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The OSU Wexner Medical Center is seeking a subcontractor for the manufacture of vertical bed storage racks. The project requires the fabrication and production of 12 metal storage racks designed to securely hold three patient beds each, consisting of 11 front-loading units and one lateral-loading unit. The scope of work encompasses all necessary welding, assembly, and quality control processes to ensure the racks meet safety and functional requirements. This subcontract opportunity was posted on May 16, 2024, with a response deadline of May 28, 2024. The project falls under NAICS code 332312, focusing on the specialized fabrication of metal storage solutions for a medical environment. Interested parties can find further details and submission guidelines through the provided SciQuest procurement portal.

General Info

OSU Wexner Medical Center seeks a subcontractor to manufacture 12 metal bed storage racks.

Documents

This scope was carved out of 2024-IND-221-RFP.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

FY24 Bed Lift RFP 2

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → OSU Wexner Medical Center
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabrication and production of 12 metal storage racks (11 front-loading, 1 lateral-loading) to securely store three patient beds each, including welding, assembly, and quality control.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS