Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Manzanita Court Waterline Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Manzanita Court Waterline Replacement project, managed by the Twain Harte Community Services District in California, involves the replacement of approximately 325 feet of degraded 2-inch galvanized iron waterline with 6-inch PVC waterline. The work is located within a paved public street right of way in Twain Harte, CA 95383. This replacement is necessary to address existing leaks and degradation, with the pipe being upsized specifically to meet minimum standards and fire flow requirements rather than to increase overall system capacity. The project is classified under NAICS code 237110 and is currently listed as a forecast posted on August 22, 2025. It has been granted a Categorical Exemption under Class 2, Section 15302, and statutory code 21080.21 because it involves the replacement of a pipeline under one mile without expanding capacity. Tom Trott, the General Manager of the Twain Harte Community Services District, serves as the primary point of contact for the project.

General Info

Replace 325 feet of 2-inch galvanized pipe with 6-inch PVC in public right-of-way for code compliance, no capacity increase.

Agency

California → Twain Harte Community Services District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Manzanita Court/Manzanita Drive, CA, 95383

Set-Aside

NONE

Documents

(1)

Notice of Exemption - Manzanita Court Waterline Replacement

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Twain Harte Community Services District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Twain Harte Community Services District
Office AddressN/A
Contacts
Tom TrottGeneral Manager

Full Description

Show more
Replace approximately 325' of degraded 2" galvanized iron waterline with 6" PVC waterline. All waterline is located within a paved public street right of way. Replacement is necessary due to degradation and leaks. The pipe is only being upsized to meet minimum standards and fire flows and will not provide more capacity.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements project in Kerman, California. This comprehensive redesign project involves the demolition of existing infrastructure and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additional work includes the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and the construction of a new CMU operations and electrical building equipped with HVAC, plumbing, and electrical infrastructure. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as grading, earthwork, and asphalt resurfacing. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned enterprises across a wide range of NAICS codes, including various specialty trade contractors. Interested parties must submit their responses by October 21, 2026. Primary contact for this solicitation is Christina Pauls at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves, including 54-inch and 132-inch diameter valves and tie-ins ranging from 54 to 145.5 inches. Additional structural requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope further encompasses electrical upgrades, instrumentation and controls, piping systems, and specialized civil works such as the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS