Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mare Island Repairs And Drydock Services

Closed
20260706015State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
U.S. NAVY VESSEL VOYAGE REPAIR AVAILABILITY (VRA)
Solicitation # N6817127QN004
The U.S. Navy, through the Navsup Fleet Logistics Center Naples, is soliciting a Firm-Fixed-Price contract for a Vessel Voyage Repair Availability (VRA) for the USS Mt Whitney (LCC 20). The work will be performed in Gaeta, Italy, with a period of performance from December 1, 2026, through December 15, 2026. The scope of work includes 10 Category A work items and 3 Not Separately Priced (NSP) items, featuring tasks such as barometer calibration, steel repairs, fire room drain piping repairs, LPAC hose hydrostatic testing, and insulation repairs. The contractor must adhere to strict technical standards, including MIL-STD-869 for thermal insulation, ANSI and ISO requirements for calibration, and US Coast Guard and COLREGS Navigation regulations. Award will be based on the Lowest Price Technically Acceptable (LPTA) basis. To be considered, quoters must be rated acceptable regarding their technical capability, which requires providing proof of ISO 9001 or 14001 Quality Management Systems, ABS welding certifications, and laboratory qualifications for calibration. The contract emphasizes rigorous safety and environmental compliance, requiring certified Marine Chemists for gas-freeing and strict adherence to international and local regulations for the handling and disposal of hazardous materials. Invoicing must be processed electronically via Wide Area Work Flow (WAWF). Quotes are due by November 2, 2026, and must include completed Standard Forms 18 and 30, along with specific representations and certifications regarding tax status and defense telecommunications equipment.
Navsup Flc Sigonella Naples Office

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is soliciting proposals for a comprehensive propulsion repower and helm system integration for a 30 foot Munson Packman landing craft. The project requires a factory-certified Honda Marine Authorized Dealer to decommission and remove two existing Honda BF250A outboard engines and replace them with new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing the removal of legacy rigging, a structural assessment of the transom, installation of new engines and Honda iST electronic control heads at dual helm stations, integration with the existing SeaStar PA1315-2 Power Assist steering and NMEA 2000 network, and a complete fuel system overhaul using USCG Type A1-15 lines. The project concludes with static diagnostics and a minimum two-hour sea trial to validate performance and safety protocols. The selected contractor must provide a secure facility for vessel storage and adhere to strict insurance requirements, including at least 1 million dollars in commercial general liability and business auto liability. Financial protections include a 25 percent retainage or a performance bond, with a bond being mandatory for contracts exceeding 100,000 dollars. Proposals are due by November 13, 2026, and will be evaluated based on a 100-point scale considering technical capability and budget, with specific preferences given to responsible Indian Offerors under TERO and tribal preference laws. All disputes are subject to the jurisdiction of the Colville Tribal Court, and payments are contingent upon the availability of tribal funds.
Confederated Tribes of the Colville Reservation

POSTED

about 13 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The M/V Mare Island will undergo a comprehensive drydock and repair operation following a solicitation issued by the San Francisco Bay Area Water Emergency Transportation Authority, with performance to be carried out in Vallejo, California. The scope encompasses routine inspections, USCG credit drydocking, and a full suite of hull and mechanical repairs, including high-pressure hull washing, underwater coating preparation and application of INTERNATIONAL BRA 641 antifouling paint, anode renewal, sea valve inspection and replacement, and repainting of draft marks and vessel identifiers using INTERNATIONAL 900 HS epoxy. Major mechanical work involves removing and replacing the port MJP waterjet with a spare unit and removing and reinstalling the starboard MJP waterjet to enable extensive structural repairs to the starboard jet tunnel as detailed in engineering plans, alongside inspection of the port forepeak void. All work must comply with technical specifications, manufacturer guidelines for coating thickness, USCG standards, and a contractor-approved quality assurance program, with final acceptance occurring at WETA’s facilities upon successful completion of testing and sea trials. The contract award will be based on a best-value trade-off process, weighing price (40 points), project understanding and approach (20 points), proposer qualifications and experience (20 points), schedule (10 points), and key personnel qualifications (10 points), totaling 100 points. Although no contract value is specified due to unpopulated pricing tables, proposals must include a detailed cost structure and adhere to Buy America requirements, federal tax liability certification, and NDAA Section 889 prohibitions against Chinese telecommunications equipment. Contractors must comply with Davis-Bacon wage requirements, OSHA safety standards, and recordkeeping obligations, while also meeting insurance, debarment, and lobbying certification conditions. Invoices must be submitted electronically to WETA’s project manager and accounts payable, with payment expected within 30 days. Proposals are limited to 25 pages excluding supporting documents and must be submitted exclusively via the Bonfire portal by August 21, 2026. Contract administration is managed by Jeff Powell, with no separate COR or PCO role designated. The work must be performed entirely within the specified location without federal packaging or marking standards applying to shipped goods, but with clear marking and preservation requirements tied directly to the vessel itself.

General Info

M/V Mare Island drydocked in Vallejo for USCG-compliant repairs, waterjet replacement, and hull coating.

Documents

1

RFP 26-017 Mare Island Repairs and Drydock Services

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → San Francisco Bay Area Water Emergency Transportation Authority
Contacts3 people available
OfficeN/A
Office AddressN/A
Contacts
Lauren Duran Gularte

Full Description

Show more
Bid #26-017: The project involves drydocking the M/V Mare Island for routine inspections, USCG credit drydocking, and repairs. Key work includes high-pressure washing of the hull, underwater hull coating repairs (prep, primer, anti-fouling paint), repainting draft marks, sea valve inspections and replacement, anode renewal, and topside paintwork spot repairs. Major mechanical work involves removing and replacing the port MJP waterjet with a spare unit, removing and reinstalling the starboard MJP waterjet to facilitate significant structural repairs to the starboard jet tunnel per provided engineering plans, and inspecting the port forepeak void for potential repairs.

More opportunities from California → San Francisco Bay Area Water Emergency Transportation Authority

Same awarding agency

NAICS: 237990
SLED
Treasure Island Float Electrification
Solicitation # 25-065
The San Francisco Bay Area Water Emergency Transportation Authority (WETA) is soliciting proposals for the Treasure Island Float Electrification project under solicitation number 25-065. This professional services agreement focuses on the electrification and modification of the Treasure Island Float in San Francisco, California. The primary scope of work includes the installation of an Automated Mooring System, which involves removing existing mooring hardware and installing hydraulic mooring line tensioning systems, chocks, a hydraulic power unit, and mooring line davits. Additionally, the contractor must inspect and modify lifesaving equipment, including life rings, fire extinguishers, and ladders, in accordance with specific contract drawings. Proposals are due by November 9, 2026, at 5:00 PM PT via the Bonfire portal. Award evaluation is based on a 100-point scale, with the price proposal accounting for 70 points. The selected contractor must provide a performance bond and maintain comprehensive insurance. Key deliverables include vectorized as-built drawings, operations manuals for the charging and mooring systems, and monthly management reviews. Strict quality assurance standards are required, particularly for coating work, which must adhere to various ASTM and SSPC guidelines. Contract administration is managed by Project Manager Jan Rybka, with invoicing handled via PDF email. Payments are milestone-based and typically processed within 30 days of receipt. The contractor is responsible for protecting all materials from weather abuse and ensuring that hydraulic piping is fabricated in a controlled environment. Compliance with the Americans with Disabilities Act, Title VI of the Civil Rights Act, and various environmental and occupational safety standards is mandatory.
Other Heavy and Civil Engineering Construction

POSTED

15 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS