Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mission Bay Ferry Landing Modular Float Procurement

Closed
20260709029State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 13 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 14 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The San Francisco Bay Area Water Emergency Transportation Authority (WETA) is seeking qualified firms to procure, fabricate, assemble, and deliver a Modular Float for the Mission Bay Ferry Landing, with completion and final acceptance required by July 27, 2027. The scope encompasses design, fabrication, and integration of the float with topside modifications, electric ferry charging equipment, and shoreside electrical infrastructure, strictly adhering to American Bureau of Shipping (ABS) standards, ASTM, ANSI, and NEMA specifications, as well as WETA’s Appendix B design details. All work must conform to approved drawings, undergo rigorous inspections including non-destructive testing, hydrostatic testing, and coating integrity checks using SSPC-SP10, NACE RP0188-99, and SSPC-PA2 standards, and meet dimensional tolerances of ±1/8 inch. Materials must be delivered and stored in original, unopened manufacturer packaging, protected from freezing and contamination, with ambient temperatures maintained above 45°F, and all coating containers and fabricated platforms must be permanently labeled with manufacturer information, dates, specifications, and weight details. Proposals are evaluated on a 100-point weighted scale, with Price Proposal carrying the most weight at 40 points, followed by Project Understanding and Approach (25 points), Proposer’s Qualifications and Experience (25 points), and Key Personnel Qualifications (10 points). Award will be made on a best-value trade-off basis, not necessarily to the lowest bidder. Contractors must submit electronic proposals via the Bonfire portal by August 18, 2026, with a 12-page limit on the main proposal and mandatory inclusion of required forms, resumes, and cost proposals. The contractor must maintain $10 million umbrella liability insurance, comply with Buy America requirements under 49 U.S.C. 5323(j), ensure at least 50% of ocean shipments are on U.S. flag vessels, and flow down DBE/SBE participation obligations to subcontractors. All financial records are subject to audit by the Federal Transit Administration and California State Auditor, with invoicing required via email to WETA’s designated contacts. Key personnel substitutions require prior written approval, and WETA retains the right to remove any key individual. The contract mandates compliance with federal civil rights, nondiscrimination, energy efficiency, and environmental regulations, with no options, security clearances, or organizational conflict of interest clauses present. Delivery and final acceptance occur at

General Info

Procure and install modular float with electric charging at Mission Bay Ferry Landing, San Francisco, by August 18, 2026.

Documents

4

Mission Bay Ferry Landing Modular Float RFP Addendum 1

PDF, High priority: read this firstamendment
High

RFP #26-015 Modular Float Procurement

PDF, High priority: read this firstrfp
High

RFP 26-015 Modular Float Procurement Part A Instructions

PDF, High priority: read this firstrfp
High

WETA Pier 48.5 Float Replacement Concept Design Drawings Rev0

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → San Francisco Bay Area Water Emergency Transportation Authority
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #26-015: WETA is seeking services from qualified individuals or firms to procure, fabricate, assemble, and deliver a Modular Float for the Mission Bay Ferry Landing. The project includes topside float modifications, electric ferry charging equipment modifications and installation, and integration with shoreside electrical infrastructure.

More opportunities from California → San Francisco Bay Area Water Emergency Transportation Authority

Same awarding agency

NAICS: 237990
SLED
Treasure Island Float Electrification
Solicitation # 25-065
The San Francisco Bay Area Water Emergency Transportation Authority (WETA) is soliciting proposals for the Treasure Island Float Electrification project under solicitation number 25-065. This professional services agreement focuses on the electrification and modification of the Treasure Island Float in San Francisco, California. The primary scope of work includes the installation of an Automated Mooring System, which involves removing existing mooring hardware and installing hydraulic mooring line tensioning systems, chocks, a hydraulic power unit, and mooring line davits. Additionally, the contractor must inspect and modify lifesaving equipment, including life rings, fire extinguishers, and ladders, in accordance with specific contract drawings. Proposals are due by November 9, 2026, at 5:00 PM PT via the Bonfire portal. Award evaluation is based on a 100-point scale, with the price proposal accounting for 70 points. The selected contractor must provide a performance bond and maintain comprehensive insurance. Key deliverables include vectorized as-built drawings, operations manuals for the charging and mooring systems, and monthly management reviews. Strict quality assurance standards are required, particularly for coating work, which must adhere to various ASTM and SSPC guidelines. Contract administration is managed by Project Manager Jan Rybka, with invoicing handled via PDF email. Payments are milestone-based and typically processed within 30 days of receipt. The contractor is responsible for protecting all materials from weather abuse and ensuring that hydraulic piping is fabricated in a controlled environment. Compliance with the Americans with Disabilities Act, Title VI of the Civil Rights Act, and various environmental and occupational safety standards is mandatory.
Other Heavy and Civil Engineering Construction

POSTED

15 days ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS