Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Electrical Distribution & Charging System Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the San Francisco Bay Area Water Emergency Transportation Authority involves the installation of electrical distribution and charging systems for WETA marine projects. The scope of work requires the contractor to perform electrical upgrades and install ferry charging infrastructure, including float-mounted charging systems, motor starters, HPU power supplies, and remote control units. Additionally, the contractor is responsible for installing marine-grade cables and wireways, modifying lighting systems, and conducting electrical load analysis and equipment identification to ensure a fully operational system. The project is categorized under NAICS code 238210 and will be performed in San Francisco. Interested parties must respond by the deadline of November 10, 2026. The primary objective of the engagement is to support prime contractors in delivering a comprehensive and functional electrical infrastructure tailored for marine ferry operations.

General Info

Electrical installation and ferry charging infrastructure for WETA marine projects in San Francisco.

Documents

This scope was carved out of 25-065.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Treasure Island Float Electrification

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Francisco Bay Area Water Emergency Transportation Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical upgrades and installs ferry charging infrastructure for prime contractors on WETA marine projects. Installs float-mounted charging systems, motor starters, HPU power supplies, and remote control units. Installs marine-grade cables, wireways, and modifies lighting systems. Performs electrical load analysis and equipment identification. Delivers an operational electrical distribution and charging system.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
EXT MOH | 2901-2929 16th St Electrical
Solicitation # SFGOV-0000012161
AmOne Corp is seeking qualified subcontractors for electrical and joint trench services for a project located at 2901-2929 16th Street, San Francisco, CA. The scope of work includes trenching from an exterior PG&E box in the public right of way to a new underground vault on the sidewalk and into the property for a new main electrical room. Electrical requirements involve underground installations for a 2,000A service, as well as the installation of new subpanels and feeders for 63 residential units and new feeders for 8 existing commercial subpanels. Bids are due by November 4, 2026, at 5:00 PM PST via email to estimates@amonecorp.com, with a mandatory job walk scheduled for October 21, 2026, at 9:30 AM PST. Compliance requirements are stringent, requiring all bidders to be bonded, insured, and registered as Public Works Contractors with the State of California Department of Industrial Relations. The project is subject to State Prevailing Wage Determination 2026-1, with weekly certified payroll reports required via LCP Tracker. There is a 20% Local Business Enterprise (LBE) goal, specifically counting Micro and Small LBE subcontractors. Additionally, the project adheres to San Francisco's First Source Hiring Program for contracts valued at $350,000 or more. Selected subcontractors must coordinate with the General Contractor and city agencies to ensure compliance with procurement and hiring policies.
Mayor's Office of Housing and Community Development

POSTED

about 9 hours ago

DEADLINE

in 21 days
View Details

More opportunities from California → San Francisco Bay Area Water Emergency Transportation Authority

Same awarding agency

NAICS: 237990
New
SLED
Treasure Island Float Electrification
Solicitation # 25-065
The San Francisco Bay Area Water Emergency Transportation Authority (WETA) is soliciting proposals for the Treasure Island Float Electrification project under solicitation number 25-065. This professional services agreement focuses on the electrification and modification of the Treasure Island Float in San Francisco, California. The primary scope of work includes the installation of an Automated Mooring System, which involves removing existing mooring hardware and installing hydraulic mooring line tensioning systems, chocks, a hydraulic power unit, and mooring line davits. Additionally, the contractor must inspect and modify lifesaving equipment, including life rings, fire extinguishers, and ladders, in accordance with specific contract drawings. Proposals are due by November 9, 2026, at 5:00 PM PT via the Bonfire portal. Award evaluation is based on a 100-point scale, with the price proposal accounting for 70 points. The selected contractor must provide a performance bond and maintain comprehensive insurance. Key deliverables include vectorized as-built drawings, operations manuals for the charging and mooring systems, and monthly management reviews. Strict quality assurance standards are required, particularly for coating work, which must adhere to various ASTM and SSPC guidelines. Contract administration is managed by Project Manager Jan Rybka, with invoicing handled via PDF email. Payments are milestone-based and typically processed within 30 days of receipt. The contractor is responsible for protecting all materials from weather abuse and ensuring that hydraulic piping is fabricated in a controlled environment. Compliance with the Americans with Disabilities Act, Title VI of the Civil Rights Act, and various environmental and occupational safety standards is mandatory.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS