This Solicitation opportunity from California was posted on October 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Vallejo Ferry Terminal Reconfiguration Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Vallejo Ferry Terminal Reconfiguration Project is a design-build solicitation issued by the San Francisco Bay Area Water Emergency Transportation Authority (WETA) for infrastructure modifications at the terminal located at 289 Mare Island Way in Vallejo, California. The scope of work involves the delivery, inspection, and installation of a new WETA Standard Float, including the fabrication and installation of structural steel components such as float modifications, guide pile collars, and temporary gangway support dolphin framing. The project also requires the implementation of dewatering systems for excavation and the installation of fire department connections. Substantial completion of the entire work is scheduled for December 15, 2027. WETA is utilizing a two-step sealed proposal process for this procurement, with a response deadline of November 14, 2026. The evaluation process considers technical merit, which encompasses engineering, design, management, past performance, and financial stability. Awardees must provide performance and payment bonds for 100 percent of the contract amount and adhere to both Federal and State prevailing wage requirements, with the higher rate applying in cases of conflict. The project is subject to the Buy America Act and requires compliance with FTA Circular 4220.1G. Proposals must be submitted electronically via the Bonfire Portal and include a technical proposal, price proposal, and various certifications, including SBE and DBE status declarations.
General Info
Place of Performance
Vallejo, CA, 94590, USASet-Aside
Documents
8AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- ADVANCE NOTICE: Rail Modernization ProgramOpen now, due in 318 days
- Imperial Irrigation District – East Highline ReservoirOpen now, due in 21 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
