Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

25-053 - Vallejo Ferry Terminal Reconfiguration Project

Open
25-053-vallejo-ferry-terminal-reconfiguration-project

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

CA, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 6 days

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyThe Dutra Group
Contacts1 person available
OfficeN/A

Full Description

Show more
The Vallejo Ferry Terminal Reconfiguration Project includes in-water construction and demolition, new and refurbished structures, extension and relocation of utilities, acceptance and final placement final placement of the WETA Standard Float.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Norwich Waterfront Revitalization
Solicitation # 27-37
The Norwich Waterfront Revitalization project, managed by the City of Norwich, Connecticut, is a comprehensive construction effort with an anticipated duration of 270 days. The base bid scope includes the construction of a restroom and mechanical building, a combined splash pad and ice rink slab with utilities, a pre-engineered band shell with a concrete stage, and various site improvements such as concrete sidewalks, plazas, stairs, retaining walls, and bituminous concrete pavements. Additionally, the project covers essential storm, water, sewer, and electrical utilities, as well as landscaping. Bid alternates include the Rose Alley Pump Station force main replacement, West Main Street access, restroom building façade upgrades, a restaurant expansion at 150 Chelsea Harbor Drive, and boat launch removal and infill. The contract will be awarded to the lowest responsible and qualified bidder, with evaluation based on skill, ability, integrity, and past performance. For projects valued at $1,000,000 or more, contractors must be prequalified by the Connecticut Department of Administrative Services. Key financial and legal requirements include a 5% bid surety, and performance and payment bonds each equal to 100% of the total proposal price. The contractor must adhere to prevailing wage rates under C.G.S. § 31-53c and maintain commercial general liability insurance. Furthermore, the contract mandates a 25% set-aside for DAS-certified subcontractors, with a specific 6.25% goal for minority, women, and disabled-owned businesses. Proposals must be submitted via the City of Norwich Procurement portal by January 11, 2027.
DAS Procurement

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Isle of Wight County, Virginia, is soliciting bids for the Phase 1 construction of Henry H. Bradby Park, located on a 51.67-acre parcel in Smithfield. The project scope involves approximately 6.63 acres of land disturbance and includes initial site preparation, clearing, demolition, grading, and the installation of civil infrastructure such as drainage and stormwater management. Key deliverables include the construction of public amenities such as parking facilities, walking trails, a playground, a shelter, and recreational courts, as well as final landscaping and site furnishings. The contract is a firm-fixed-price award to the lowest responsive and responsible bidder, with a required substantial completion timeline of 300 days from the notice to proceed and final completion due 45 days thereafter. Because the project is funded through the National Park Service's Land and Water Conservation Fund, it is subject to strict federal oversight. This includes mandatory compliance with the Build America, Buy America Act for material sourcing, as well as adherence to federal civil rights laws and environmental windows for endangered species. Bidders must provide bid, performance, and payment bonds, with bid bonds required for projects exceeding 500,000 dollars. All work must comply with the 2018 Virginia Statewide Building Code and specific approvals from the Virginia Department of Transportation and the Department of Environmental Quality. Bids are due by November 16, 2026, and must be submitted via the designated procurement portal.
Parks & Recreation

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
Northside Park Site Improvements
Solicitation # 27032
The County of Greenville is soliciting proposals from qualified general contractors for site improvements at Northside Park in Taylors, South Carolina. The project is divided into Phase 1, Phase 2, and an Alternate Phase, focusing on the renovation of parking lots, access routes, and the expansion of athletic courts to include additional pickleball courts and a shaded plaza. The comprehensive scope of work includes demolition of existing pavement, fencing, and amenities; site work such as grading, stormwater treatment, and the installation of a 27 by 40 foot pavilion shade structure; and extensive landscaping including sod and tree planting. All work must adhere to ADA Title II guidelines and OSHA safety regulations. Proposals are due by November 25, 2026, and will be evaluated on a 100-point scale across five equally weighted categories: responsiveness, experience, references, pricing, and project approach. The anticipated notice to proceed is December 28, 2026, with construction starting January 1, 2027, and a desired completion date of May 15, 2027. Selected contractors must provide a bid bond and a performance and payment bond for the total contract price. Payment is based on monthly invoicing with a 30-day term, and the County will withhold 10 percent of payments until satisfactory project completion. Liquidated damages of 250 dollars per day will be assessed if work exceeds 90 calendar days from the notice to proceed.
PARKS ADMINISTRATION

POSTED

about 7 hours ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS