Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Request for Quote for The Recharge Master Plan Update at Montclair Basin

Open
request-quote-recharge-master-plan-update-montclair-basin

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyBosco Constructors, Inc.
Contacts1 person available
OfficeN/A
Organization / AgencyBosco Constructors, Inc.
Office AddressN/A
Contacts

Full Description

Show more
Bosco Constructors, Inc. is seeking certified and qualified DBE, SBA, and/or MBDA subcontractors and suppliers to provide mobilization, water control, bypass and dewatering, inlet and outlet structures, diversion piping, valves, fittings, riprap, grading, backfill, restoration, and cleanup for Basin 2 and Basin 3 improvements.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids for the Water Treatment Plant Maintenance Package A Degasifier Package (Project No. 25-4261A). The scope of work involves the replacement of packing media in three degasifier units (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. Key technical requirements include power washing vessel interiors, replacing media support grids and differential pressure gauges, vessel disinfection, and resealing access doors. To ensure continuous plant operation, work must be performed on one unit at a time. The project requires the use of NSF 61 certified polypropylene media and mandates that the prime contractor hold an active Florida General Contractor license. The contract will be awarded to the lowest responsive and responsible bidder based on price, qualifications, and past performance. Bids must be submitted electronically via the OpenGov portal, with a final submission deadline of November 18, 2026. The project timeline specifies substantial completion within 180 calendar days and final completion within 210 calendar days from the Notice to Proceed, with liquidated damages set at 500 dollars per day. Financial requirements include a bid guaranty of 5 percent of the bid, and the successful contractor must provide performance and payment bonds for 100 percent of the contract price. Comprehensive insurance coverage is required, including Commercial General Liability, Pollution Liability, and Commercial Automobile Liability, with the City of Hollywood named as an additional insured. The pricing structure consists of lump sum items for mobilization and demobilization, a fixed City Contingency Allowance of 86,000 dollars, and unit prices for the procurement of 3.5-inch and 2-inch packing media and equipment cleaning services. Additionally, the project is subject to federal prevailing wage requirements and compliance with Executive Order 11246 regarding equal employment opportunity.
Public Utilities

POSTED

about 7 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
Federal
Pensacola Harbor Navigation Channel Maintenance Dredging
Solicitation # W9127827BA002
Solicitation W9127827BA002 is an Invitation for Bid issued by the Department of Defense, W074 Endist Mobile, for the Pensacola Harbor Navigation Channel Maintenance Dredging project in Escambia County, Florida. The project requires maintenance dredging from Station 202+00 to 301+00, extending from lower Pensacola Bay through Pensacola Pass into the Gulf of Mexico. The contractor must utilize hydraulic cutterhead pipeline, trailing suction hopper, or mechanical dredges capable of dredging to depths of 30 to 39 feet. Dredged sand material will be placed along Perdido Key Beach. The contractor is responsible for providing all necessary crew, management, and support equipment, including tugs, barges, and cranes. All activities must be completed by April 1, 2027. This is a Firm-Fixed Price, stand-alone C contract awarded to the overall low bidder for the Base Bid, with a 10 percent price evaluation preference for certified HUBZone small business concerns. Bids are due by November 20, 2026, and must be submitted via the Procurement Integrated Enterprise Environment portal. Key requirements include compliance with the USACE Dredging Quality Management Program, adherence to EM 385-1-1 safety standards, and compliance with Davis-Bacon Act wage determinations. The contract stipulates liquidated damages of 5,534.00 dollars per calendar day of delay. Acceptance of work is based on the removal of 95 percent of the material from the required dredging prism, verified by high frequency survey data.
W074 Endist Mobile

POSTED

about 12 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
Federal
Mid-Bay James Island Restoration Phase 2
Solicitation # W912DR27BA001
Solicitation W912DR27BA001 is a Firm Fixed Price construction contract issued by the U.S. Army Corps of Engineers, Baltimore District, for Phase 2 of the Mid-Chesapeake Bay Island Ecosystem Restoration project at James Island in Dorchester County, Maryland. The project, with an estimated value between 150 million and 250 million dollars, involves complex restoration work in a remote location accessible only by boat. Key deliverables include the installation of approximately 22,000 linear feet of perimeter dikes using stone, geotextile, and sand, the excavation and stockpiling of roughly 650,000 cubic yards of sand from a local borrow area, and the construction of spillway structures for controlled water release. The anticipated period of performance is 1,095 calendar days, though the awardee is explicitly prohibited from mobilizing before September 15, 2027, pending a formal Notice to Proceed. Bids must be submitted electronically via the Procurement Integrated Enterprise Environment portal in searchable PDF format. Evaluation is based on unit prices and totals, with a price evaluation preference provided for HUBZone small business concerns. The contract requires the submission of a Construction Quality Control Plan within 30 days of the notice to proceed and mandates adherence to EM 385-1-1 safety standards and specific environmental controls, including a prohibition on hay bales for slope stabilization. Awardees must provide performance and payment bonds and participate in formal partnering sessions within 35 to 45 days of award. Invoicing is processed through the USACE Finance Center via WAWF, requiring ENG Form 93 and prompt payment certification.
W2SD Endist Baltimore

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS