Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Automated Mooring System Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the installation of automated mooring systems for prime contractors on WETA marine projects located at Treasure Island in San Francisco. The scope of work includes the removal of existing mooring bitts, pile collar lugs, and line hangers to make way for the installation of two hydraulic mooring line tensioning systems, two Schoellhorn-Albrecht S108 chocks, and four mooring line davits equipped with counter-weights. To ensure structural integrity, the project requires AWS D1.1 certified welding for all below-deck foundations. The ultimate objective of the contract is the delivery of a fully operational automated mooring system. The solicitation was posted on October 13, 2026, with a response deadline of November 10, 2026, under NAICS code 238990.

General Info

Installation of automated mooring systems for WETA marine projects at Treasure Island, San Francisco.

Documents

This scope was carved out of 25-065.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Treasure Island Float Electrification

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Francisco Bay Area Water Emergency Transportation Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs automated mooring systems for prime contractors on WETA marine projects at Treasure Island. Removes existing mooring bitts, pile collar lugs, and line hangers; installs two hydraulic mooring line tensioning systems, two Schoellhorn-Albrecht S108 chocks, and four mooring line davits with counter-weights. Performs AWS D1.1 certified welding for below-deck foundations. Delivers a fully operational automated mooring system.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
On-Call Maintenance and Minor Construction Services
Solicitation # RFP-VC-26-008
The Inland Empire Regional Composting Authority is soliciting proposals under RFP-VC-26-008 for licensed general contractors to provide on-call maintenance and minor construction services in California. This master services contract will utilize task orders for work that may require short-notice performance, including millwright and welding activities, fire sprinkler system maintenance, general construction such as framing and concrete, and the maintenance of conveyors, hoppers, and heavy equipment. The authority intends to award multiple contracts based on an evaluation of price and payment terms, the nature of any exceptions taken to the RFP, personnel qualifications, past performance history, and the quality of the proposed work plan. Additional consideration may be given to a contractor's proximity to the service area and their sustainability efforts. Proposals must be submitted electronically via PlanetBids by October 29, 2026, at 3:00 p.m. Qualified offerors must be registered with the Department of Industrial Relations and adhere to California general prevailing wage rates. Key contractual requirements include the provision of performance and payment bonds for any task order exceeding 25,000 dollars and strict compliance with OSHA safety standards. Compensation is based on fully burdened hourly rates for regular, after-hours, and weekend or holiday work, with invoices paid within 30 days. The contract is governed by the laws of the State of California in San Bernardino County and includes provisions for liquidated damages and an expedited payment protocol for contractors offering invoice discounts.
Inland Empire Utilities Agency

POSTED

about 8 hours ago

DEADLINE

in 14 days
View Details

More opportunities from California → San Francisco Bay Area Water Emergency Transportation Authority

Same awarding agency

NAICS: 237990
New
SLED
Treasure Island Float Electrification
Solicitation # 25-065
The San Francisco Bay Area Water Emergency Transportation Authority (WETA) is soliciting proposals for the Treasure Island Float Electrification project under solicitation number 25-065. This professional services agreement focuses on the electrification and modification of the Treasure Island Float in San Francisco, California. The primary scope of work includes the installation of an Automated Mooring System, which involves removing existing mooring hardware and installing hydraulic mooring line tensioning systems, chocks, a hydraulic power unit, and mooring line davits. Additionally, the contractor must inspect and modify lifesaving equipment, including life rings, fire extinguishers, and ladders, in accordance with specific contract drawings. Proposals are due by November 9, 2026, at 5:00 PM PT via the Bonfire portal. Award evaluation is based on a 100-point scale, with the price proposal accounting for 70 points. The selected contractor must provide a performance bond and maintain comprehensive insurance. Key deliverables include vectorized as-built drawings, operations manuals for the charging and mooring systems, and monthly management reviews. Strict quality assurance standards are required, particularly for coating work, which must adhere to various ASTM and SSPC guidelines. Contract administration is managed by Project Manager Jan Rybka, with invoicing handled via PDF email. Payments are milestone-based and typically processed within 30 days of receipt. The contractor is responsible for protecting all materials from weather abuse and ensuring that hydraulic piping is fabricated in a controlled environment. Compliance with the Americans with Disabilities Act, Title VI of the Civil Rights Act, and various environmental and occupational safety standards is mandatory.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS