Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Marine Industrial Coating & Painting

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Marine Industrial Coating and Painting supports prime contractors on San Francisco Bay Area Water Emergency Transportation Authority projects in San Francisco. The scope of work involves applying protective industrial coatings to structural components, beginning with abrasive blasting to SSP-SP10 Near White standards with a 1.5-3 mil profile. The coating process requires the application of Sherwin Williams Alum Sandal Room ISO primer followed by a Sherwin Williams Shrekolax One-800 Polysiloxane topcoat in Haze Gray. All work must be performed in strict adherence to SSPC and ASTM standards to ensure the delivery of fully coated and cured components. Interested parties should note the response deadline of November 10, 2026, for this project categorized under NAICS code 238320.

General Info

Marine industrial coating and painting subcontract for SF Bay projects due November 10, 2026.

Documents

This scope was carved out of 25-065.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Treasure Island Float Electrification

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Francisco Bay Area Water Emergency Transportation Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Applies protective industrial coatings for prime contractors on WETA marine projects. Performs abrasive blasting to SSP-SP10 (Near White) with a 1.5-3 mil profile. Applies Sherwin Williams Alum Sandal Room ISO primer and Sherwin Williams Shrekolax One-800 Polysiloxane topcoat in Haze Gray (FS26270 LSA). Adheres to SSPC and ASTM standards. Delivers fully coated and cured structural components.

Similar Contracts

Same NAICS industry code

More opportunities from California → San Francisco Bay Area Water Emergency Transportation Authority

Same awarding agency

NAICS: 237990
New
SLED
Treasure Island Float Electrification
Solicitation # 25-065
The San Francisco Bay Area Water Emergency Transportation Authority (WETA) is soliciting proposals for the Treasure Island Float Electrification project under solicitation number 25-065. This professional services agreement focuses on the electrification and modification of the Treasure Island Float in San Francisco, California. The primary scope of work includes the installation of an Automated Mooring System, which involves removing existing mooring hardware and installing hydraulic mooring line tensioning systems, chocks, a hydraulic power unit, and mooring line davits. Additionally, the contractor must inspect and modify lifesaving equipment, including life rings, fire extinguishers, and ladders, in accordance with specific contract drawings. Proposals are due by November 9, 2026, at 5:00 PM PT via the Bonfire portal. Award evaluation is based on a 100-point scale, with the price proposal accounting for 70 points. The selected contractor must provide a performance bond and maintain comprehensive insurance. Key deliverables include vectorized as-built drawings, operations manuals for the charging and mooring systems, and monthly management reviews. Strict quality assurance standards are required, particularly for coating work, which must adhere to various ASTM and SSPC guidelines. Contract administration is managed by Project Manager Jan Rybka, with invoicing handled via PDF email. Payments are milestone-based and typically processed within 30 days of receipt. The contractor is responsible for protecting all materials from weather abuse and ensuring that hydraulic piping is fabricated in a controlled environment. Compliance with the Americans with Disabilities Act, Title VI of the Civil Rights Act, and various environmental and occupational safety standards is mandatory.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS