Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Industrial Coatings and Steel Protection

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Industrial Coatings and Steel Protection involves providing specialized inspection and application services for prime contractors on San Francisco Bay Area Water Emergency Transportation Authority marine projects located in Vallejo, California. The scope of work focuses on the identification of rust, chalking, cracking, and blistering through joint inspections conducted according to specific ASTM standards, followed by the application of revised steel protective coatings. The selected provider is responsible for delivering both the physical application of the protective coatings and a comprehensive coating inspection report. This opportunity falls under NAICS code 238320, with a response deadline set for November 14, 2026.

General Info

Steel coating application and inspection services for marine projects in Vallejo, California.

Documents

This scope was carved out of 25-053.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Vallejo Ferry Terminal Reconfiguration Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Francisco Bay Area Water Emergency Transportation Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs inspection and application of protective coatings for prime contractors on WETA marine projects in Vallejo, CA. Conducts joint inspections for rust, chalking, cracking, and blistering using ASTM D610, D659, D660, D661, D662, and D714 standards, and applies revised steel coatings. Delivers a comprehensive coating inspection report and applied protective coatings.

Similar Contracts

Same NAICS industry code

NAICS: 238320
New
SLED
Weill Institute SMSR 2022-23 Repaint Building Exterior
Solicitation # 20261027022
The Kern Community College District is soliciting proposals for the Weill Institute SMSR 2022-23 Repaint Building Exterior project in Bakersfield, California. The scope of work includes providing all labor, materials, equipment, and supervision to pressure wash, prepare, repair, seal, prime, and paint various exterior surfaces, including metal columns, wood guardrails, stucco, brick, concrete, CMU walls, light poles, generator enclosures, gates, and monument signs. An optional Alternate #1 is included for the preparation and painting of second-floor siding on the south side. The contractor must adhere to manufacturer recommendations for all materials, protect adjacent landscaping and surfaces from overspray, and coordinate scheduling with the college to minimize office hour interruptions. The contract will be awarded to the responsible proposer with the lowest total aggregate proposal. Key requirements include a C-33 license, adherence to prevailing wage rates for proposals exceeding 1,000 dollars, and a one-year workmanship guarantee. Bonding requirements include a 10 percent bid bond for proposals of 45,000 dollars or more, and 100 percent payment and performance bonds for contracts of 25,000 dollars or more. Insurance must be provided by a carrier with a Best Key Rating Guide A or better. The contractor must commence work within five calendar days of the notice to proceed and is required to notify the owner one week prior to completion for final inspection. Submissions must be delivered in a sealed envelope with original wet signatures and include a Non-Collusion Affidavit, Prevailing Wage Compliance Certificate, and Certification of Workmen's Compensation.
Kern Community College District

POSTED

about 5 hours ago

DEADLINE

in 22 days
View Details

More opportunities from California → San Francisco Bay Area Water Emergency Transportation Authority

Same awarding agency

NAICS: 237990
SLED
Treasure Island Float Electrification
Solicitation # 25-065
The San Francisco Bay Area Water Emergency Transportation Authority (WETA) is soliciting proposals for the Treasure Island Float Electrification project under solicitation number 25-065. This professional services agreement focuses on the electrification and modification of the Treasure Island Float in San Francisco, California. The primary scope of work includes the installation of an Automated Mooring System, which involves removing existing mooring hardware and installing hydraulic mooring line tensioning systems, chocks, a hydraulic power unit, and mooring line davits. Additionally, the contractor must inspect and modify lifesaving equipment, including life rings, fire extinguishers, and ladders, in accordance with specific contract drawings. Proposals are due by November 9, 2026, at 5:00 PM PT via the Bonfire portal. Award evaluation is based on a 100-point scale, with the price proposal accounting for 70 points. The selected contractor must provide a performance bond and maintain comprehensive insurance. Key deliverables include vectorized as-built drawings, operations manuals for the charging and mooring systems, and monthly management reviews. Strict quality assurance standards are required, particularly for coating work, which must adhere to various ASTM and SSPC guidelines. Contract administration is managed by Project Manager Jan Rybka, with invoicing handled via PDF email. Payments are milestone-based and typically processed within 30 days of receipt. The contractor is responsible for protecting all materials from weather abuse and ensuring that hydraulic piping is fabricated in a controlled environment. Compliance with the Americans with Disabilities Act, Title VI of the Civil Rights Act, and various environmental and occupational safety standards is mandatory.
Other Heavy and Civil Engineering Construction

POSTED

15 days ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS