JOHNSON AVE STORMWATER & STREETSCAPE

Active
PE-62250-NONST-2027-000000015State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Carrollton is soliciting bids for the reconstruction of Johnson Avenue from Rome Street to Barnes Avenue and a 250-foot stretch of Barnes Avenue north of Johnson Avenue, as part of a stormwater and streetscape improvement project. Key components include the installation of new storm sewer piping ranging from 18 to 60 inches in diameter along with drainage structures, new 8-inch and 12-inch water mains, new 8-inch sanitary sewer mains with associated manholes, and the reconnection of existing utility services. The scope also involves saw-cutting and demolishing existing pavement, milling and overlaying portions of the roadway, constructing full-depth pavement with curb and gutter, installing new sidewalks and a retaining wall, and re-striping and re-signing all roadways and parking areas. Utility relocations will be required where necessary, and the contractor must coordinate closely with the City Engineer and utility owners to ensure proper adjustments. All work must include comprehensive erosion control measures—installation, maintenance, and removal—as well as permanent site stabilization. The contractor is responsible for minimizing disruptions by coordinating and limiting road, lane, and parking lot closures in consultation with the City Engineer, ensuring public access remains as uninterrupted as possible throughout construction. Continuous communication and coordination with both the Project Engineer and the City Engineer are mandatory to maintain project alignment with municipal expectations and timelines. The solicitation, numbered PE-62250-NONST-2027-000000015, was posted on July 10, 2026, with proposals due by August 11, 2026, and is managed by the City of Carrollton in Georgia under the oversight of Dalton Appleby, who can be reached at 770-830-2000 or dappleby@carrollton-ga.gov. The project emphasizes infrastructure modernization, improved drainage, pedestrian accessibility, and adherence to civic standards through meticulous planning and execution.

General Info

Reconstruct Johnson Avenue and Barnes Avenue with new stormwater, water, sewer lines, sidewalks, pavement, and erosion control.

Agency

Georgia → City of CarrolltonView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(1)

RFP Johnson Ave Stormwater & Streetscape Project 2026

PDFrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Carrollton
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → City of Carrollton
View Agency Profile
Office AddressN/A

Full Description

Show more
The project consists of reconstructing Johnson Avenue and associated utilities from Rome Street to Barnes Avenue and on Barnes Avenue from Johnson Avenue north approximately 250 feet. The project will include installation of new 18''-60'' storm sewer piping and drainage structures; new 8'' sanitary sewer main piping and manholes; new 8'' and 12'' water mains; reconnecting sanitary sewer and water services; relocation of existing utilities where necessary; saw-cutting and demolition of existing road and parking lots; milling and overlay portions of existing road; new full-depth pavement and curb and gutter for road and parking lots; new sidewalks; installation of a retaining wall; re-striping and re-signing roadway and parking lots; traffic control; erosion control (installation, maintenance, and removal); and permanent stabilization. The Contractor is expected to coordinate utility relocations with the City Engineer and Utility Owner(s). The City of Carrollton anticipates that the roads and adjacent parking lots will be partially and fully closed during certain phases of construction, but closure of the roads and parking lots will need to be kept to a minimum. The Contractor is expected to coordinate all lane/road/parking lot closures necessary throughout construction with the City Engineer. The Contractor will be required to maintain good communication and coordination with the Project Engineer and the City Engineer throughout construction of the project.