OSU-260081 Fuel Tank Dispensing Infrastructure Replacement REBID

Active
49323State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ohio State University is soliciting bids for the Fuel Tank Dispensing Infrastructure Replacement REBID, identified by solicitation number 49323. This project focuses on the removal and replacement of three underground storage tanks and includes necessary upgrades to associated equipment and infrastructure, such as concrete, canopies, and dispensers. The solicitation was posted on October 1, 2026, with a response deadline of October 15, 2026. The work is to be performed in Ohio under the management of the university. Interested parties can find further details through the provided BidExpress link.

General Info

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyThe Ohio State University
ContactsNo contacts available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project generally includes the removal and replacement of three underground storage tanks along with improvements to related equipment and infrastructure such as dispensers, concrete, canopies, etc…

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Indian Bar River Access Project (Lake and Streambed Alteration Agreement EPIMS Notification No. PLA-18568-R2)
Solicitation # PLA-64574-R2
The California Department of Fish and Wildlife has executed Lake Alteration Agreement EPIMS Notification Number PLA-64574-R2, pursuant to section 1602 of the Fish and Game Code, for the Indian Bar River Access Project. Located at Hell Hole Reservoir in Placer County, California, the project is managed by the Placer County Water Agency and project proponent Ben Ransom. The scope of work is limited to replacing the existing concrete boat ramp using a similar alignment and constructing a new concrete extension approximately 262 feet long and 20 feet wide. This extension will reach an elevation of 4,505 feet, which is 25 vertical feet lower than the current ramp bottom elevation of 4,530 feet. To ensure environmental protection and regulatory compliance, all construction activities must be performed in dry conditions when water surface elevations are at or below 4,500 feet. The project has undergone review under the California Environmental Quality Act, and the California Department of Fish and Wildlife has determined that the work will not have significant environmental effects within its jurisdiction. Approval was granted contingent upon the adoption of specific mitigation measures and a monitoring plan to ensure environmental safeguards are maintained throughout the project's execution.
Placer County Water Agency

POSTED

about 14 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
International
Multi-Purpose Courts
Solicitation # 234555
The Multi-Purpose Court Project for the District of Ucluelet involves the construction of multi-purpose sports facilities at Frank Jones Memorial Park in British Columbia. This unit price contract, based on the CCDC 4-2023 framework, encompasses a comprehensive scope of work including site demolition, clearing, the installation of a granular base, asphalt paving, synthetic sport court surfacing, fencing, and electrical infrastructure for parking lot lighting. A critical component of the project is the maintenance of a functional dog off-leash park during construction, with a specific milestone for its substantial completion by March 31, 2027. The overall project is expected to reach substantial performance by May 15, 2027, and be ready for takeover by May 31, 2027. The procurement process is based on a best-value selection rather than the lowest bid alone, evaluating factors such as personnel and subcontractor experience, technical understanding, safety records, and schedule commitment. Bidders must provide a 10 percent bid bond, and the successful contractor will be required to provide performance and labour and materials payment bonds, each equal to 50 percent of the contract price. Technical requirements mandate strict adherence to WorkSafe BC regulations, local noise bylaws, and specific quality standards, including 95 percent maximum dry density for granular bases and third-party geotechnical testing. Payment is processed monthly via electronic submission, contingent upon the provision of workers compensation clearance and statutory declarations.
District of Ucluelet

POSTED

about 17 hours ago

DEADLINE

in 26 days
View Details

More opportunities from The Ohio State University

Same awarding agency

NAICS: 238290
New
SLED
OSU-250339, Psychology Cage Washer Update
Solicitation # OSU-250339
The Ohio State University solicitation OSU-250339 involves the replacement and update of a psychology cage washer located on the basement floor of the Psychology building in Columbus, Ohio. The scope of work includes the demolition of existing walls, the pit, and the door, as well as the removal of the old cage washer. The contractor is responsible for the installation of a new cage washer provided by Tecniplast, along with an air compressor, air dryer, and water filtration system. Additional requirements include necessary patching, repairs, and final utility connections. To minimize disruption, all noisy work must be performed after normal operating hours. The contract will be awarded to the lowest responsive and responsible bidder. Substantial completion of all work is required within 69 consecutive days from the Notice to Proceed. Bidders must comply with State of Ohio prevailing wage rates, Equal Employment Opportunity requirements, and the EDGE Business Development Program, which has a participation goal of 5.0 percent. Additionally, the project mandates compliance with Ohio Revised Code Section 153.011 regarding domestic steel use and Executive Order 2022-02D prohibiting purchases from Russian institutions. Bidders are required to provide a bid guaranty equal to 10 percent of the base bid plus alternates and must provide performance and payment bonds before signing the agreement.
Other Building Equipment Contractors

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 541310
SLED
Ramseyer Hall Renovation
Solicitation # OSU-270009
The Ohio State University has issued a Request for Qualifications for the renovation of Ramseyer Hall, an 87,452 gross-square-foot historic facility. The project aims to address critical deferred maintenance and modernize the building to accommodate the Salmon P. Chase Center for Civics, Culture, and Society, the Mathematics and Statistics Learning Center, and a Classroom Pool. The scope includes building systems upgrades, envelope improvements, accessibility enhancements, and interior reconfiguration to create flexible academic and collaborative spaces. A primary objective is the preservation of the building's architectural heritage and historic integrity. The project will be delivered using the Construction Manager at Risk method, with an estimated construction cost of 32 million dollars and a total project budget of 47.8 million dollars. The selected Architect/Engineer must adhere to strict University standards, including the use of a collaborative BIM-enabled environment, the Target Value Design framework, and the e-Builder Project Management System for closeout. Key deliverables include the Program of Requirements, Schematic Design, and a Basis of Design. The selection process is based on a point-scoring system evaluating firm location, qualifications, team experience, and commitment to the EDGE program, which has a 5 percent participation goal. Approval for construction is anticipated in June 2027, and the design team will be required to provide significant on-site construction administration services.
Architectural Services

POSTED

9 days ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS