Schumaker Complex - Nutrition Offices

Open
OSU-270003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Project OSU-270003 involves the renovation of the W1210 locker room suite within the Schumaker Complex at The Ohio State University into a new office area for Nutrition Services staff. The scope includes the complete demolition of existing locker and restroom facilities, reconfiguration of HVAC, electrical, and fire alarm systems, and the installation of a new roll-up door for the W1210B storage room. The final space will feature at least three private offices with acoustic insulation and ACT ceilings to ensure a functional environment for confidential consultations. Because the project is located within an active athletics environment, the contractor must coordinate closely with building occupants to maintain safety and minimize operational disruptions. The project will be delivered via a Construction Manager (CM) at Risk contract with an estimated total project cost of 495,000 dollars, of which 337,350 dollars is allocated for construction. The selection process is a two-stage approach consisting of a qualifications-based RFQ to create a short list of at least three candidates, followed by a best-value RFP process evaluating qualifications and fees. The CM is responsible for both preconstruction services, including the development of a Guaranteed Maximum Price (GMP) and constructability reviews, and construction services using an open-book pricing method for subcontracts. Key requirements include adherence to OSU Sustainability Standards, participation in the EDGE program with a 5.0 percent goal, and the use of the e-Builder project management system for all compatible services and closeout.

General Info

Renovating OSU's W1210 locker room into Nutrition Services offices via CM at Risk.

Place of Performance

Not specified

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyThe Ohio State University
Contacts1 person available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A

Full Description

Show more
Project number: OSU-270003
The Schumaker Complex is a key athletics support facility for The Ohio State University Department of Athletics, housing offices, team support functions, and student-athlete resources. This project will be executed within an active athletics environment that will require coordination with building occupants and ongoing operations to maintain safety, minimize disruptions, and ensure continued access to adjacent spaces throughout construction. The project will renovate the existing W1210 locker room suite into a new office area for the Nutrition Services staff. Work includes the complete demolition of the existing locker room and restroom facilities, capping and abandoning existing water and sanitary lines as required, and reconfiguring HVAC ductwork, fire alarm devices, and electrical systems to support the new office layout. The existing W1210B storage room door will be relocated to the north side of the room and replaced with a roll- up door to minimize required opening clearance. The renovated space will provide a minimum of three private offices furnished for staff use. New office partitions will include acoustic insulation, and ACT ceilings will be installed throughout to help reduce sound transmission between adjacent workspaces and create a functional environment for confidential consultations and daily operations. Work is anticipated to occur during normal business hours, with coordination required to maintain uninterrupted operations within surrounding athletics support spaces. Professional design services are being acquired by the Contracting Authority under a separate contract. The Program of Requirements (“POR”) will be developed as a part of this project by the Architect/Engineer (“A/E”). All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority/Owner’s policies and procedures.
Scope of Services: The project and construction budget as listed in this RFQ is estimated. The selected Construction Manager at Risk, as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority/Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, Target Value Budget/Target Value Design, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at Construction Manager at Risk Agreements. The selected CM will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. Required Professional Liability Insurance will be per General Conditions Articles 10.3.7 and 10.3.8. The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. The project team (Owner / A/E / CM) will be required to utilize e-Builder, the University’s Project Management System, for all compatible services required by the University. The preconstruction and construction services are generally described below. Subcontracts including but not limited to Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority/Owner, the A/E and the CM. The Contracting Authority/Owner shall have access to all books, records, documents and other data in the CM's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The CM will work cooperatively with the Contracting Authority/Owner, A/E, and Project Team, and will provide, among other services, schedule development, estimate development, Guaranteed Maximum Price (GMP) proposal, subcontractor prequalification and bidding, constructability review, permits, budgeting, Target Value Budget/Target Value Design, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at the stage of completion specified in the Agreement, such partially completed documents (the "Basis Documents") shall be provided to the CM, together with the A/E's detailed listing of any incomplete design elements and the A/E’s statement of intended scope with respect to such incomplete elements (the "Design Intent Statement"). Contingent upon the Contracting Authority’s approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum (“GMP Amendment”). If the proposed Contract Sum exceeds the Project Budget established for construction, then the Contracting Authority may terminate the agreement with the CM and seek proposals from other firms for completion of the Project. Construction Services: The CM shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The CM shall hold all subcontracts and shall be fully responsible for the means and methods of construction, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-03-02. The Contracting Authority reserves the right to approve the CM’s selection of subcontractors and any supplemental terms to the form subcontract. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using e- Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Project Delivery Method (CM) 2. Role on Project (CM) 3. Experience with OSU Athletics Facilities 4. Interior Renovation and MEP Coordination 5. Schedule Management and Phasing For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must have been completed by the Construction Management Firm.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical system upgrades encompass HVAC, exhaust extraction, compressed air, and a full NFPA-compliant fire suppression system, alongside updated electrical distribution, lighting, low-voltage systems, and building automation controls. Site improvements involve paving removal and replacement, drainage upgrades, and repairs to water, sanitary, and storm systems, as well as hazardous materials abatement. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Proposals are evaluated based on the lowest price for two primary line items: building renovation and paving work. Bidders must adhere to Davis-Bacon Act wage determinations and Buy American requirements. Bonding requirements are tiered, with proposals of 150,000 dollars or more requiring bid, payment, and performance bonds. The contract mandates strict quality control through a three-phase inspection process and requires a 20-year no dollar limit warranty on specific roofing components. All invoicing must be processed through Wide Area WorkFlow using specific NAVFAC forms.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This solicitation issued by J&J Contractors, Inc. seeks pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The scope of work is extensive, covering demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevators, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside project subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project aims to restore dormitory, administrative, medical, and dental areas across the first, second, and third floors following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and drywall ceiling repair, flooring replacement with a required 20-year warranty for Luxury Vinyl Plank, rubber wall base installation, electrical repairs, and vanity or cabinet replacement. All work must comply with ADA, OSHA, EPA, and NFPA-101 life safety codes, as well as local Massachusetts building ordinances. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Prospective bidders must have attended a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and wage rate certifications. The contract mandates Net 30 payment terms and requires subcontractors to adhere to Davis-Bacon Act labor standards, including specific minimum wage and paid sick leave requirements.
Grafton Job Corps

POSTED

about 8 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, along with the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that fire resistance, equipment clearances, and sealed penetrations are maintained. This solicitation is set aside for Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive description of proposed work methods including project phasing and occupied-building protection, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100. Awardees must provide payment and performance bonding for the full project value, as well as proof of general liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD requires the correction of all deficiencies and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details

More opportunities from The Ohio State University

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS