Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Marine Pier and Wharf Construction

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract calls for the construction of a 1,000-foot by 80-foot reinforced concrete pier utilizing steel pile foundations, specifically designed to support Offshore Patrol Cutters. The structure must meet rigorous maritime and structural standards to ensure durability under heavy operational loads and harsh marine conditions. Work will be performed in Newport, with all materials and methods adhering to federal defense specifications, and the project is classified as a subcontract under NAICS code 237990 for other heavy and civil engineering construction. The solicitation was posted on April 28, 2026, with a firm deadline for responses on June 9, 2026, at 6:00 PM, and is managed by Navfacsyscom Mid-Atlantic under the Department of Defense. All contractors must demonstrate technical capability, proven experience in marine construction, and compliance with defense infrastructure requirements to be considered for award.

General Info

Construction of 1,000-foot reinforced concrete pier with steel piles for Offshore Patrol Cutters in Newport.

Agency

Department Of Defense → Navfacsyscom Mid-atlantic

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Newport, RI, USA

Set-Aside

NONE

Documents

This scope was carved out of N4008526R0001.

The full solicitation package (99 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Mid-atlantic
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → Navfacsyscom Mid-atlantic
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construct a 1,000' × 80' reinforced concrete pier with steel pile foundations to support Offshore Patrol Cutters.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS