Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on March 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Market Survey for Berthing, Caretaking and Overhaul of MSC Vessels

Closed
N32205-24-0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation is soliciting proposals for the complete repower of a 30 foot Munson landing craft. The selected contractor will be responsible for the decommissioning and removal of two existing Honda BF250A outboard engines and the procurement and installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing structural transom inspections, the installation of Honda iST electronic control heads at dual helm stations, integration with the SeaStar Power Assist steering system, and a comprehensive fuel system overhaul using USCG Type A1-15 lines. The project concludes with NMEA 2000 network integration, digital gauge installation, and a minimum two hour sea trial to validate performance and safety protocols. To ensure factory warranty coverage, the contractor must maintain active Honda Marine Authorized Dealer or Service Center status. The vessel will be delivered via trailer to the contractor facility, which must provide a secure, fenced yard or indoor shop. Award evaluation is based on a weighted criteria of cost, technical expertise, and TERO status, with a preference for Colville Business Enterprises. Proposals must be submitted in PDF format by November 13, 2026. Final contracts are subject to tribal appropriation and may require a performance bond for values exceeding 100,000 dollars or a 25 percent retainage.
Confederated Tribes of the Colville Reservation

POSTED

about 5 hours ago

DEADLINE

in 24 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

VA, USA

Set-Aside

NONE

Documents

2

MSC-SWI-0003-NSP Approach, Berthing, and Mooring Requirements

DOCX, High priority: read this first13 pages · sow
High

MSC-SWI-0011-A General Services for Ship (Rev 05 Jan 2024)

DOCX, High priority: read this first17 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Mschq Norfolk
Contacts2 people available
OfficeNORFOLK, VA, 23511-2313, USA
Office AddressNORFOLK, VA, 23511-2313, USA

Full Description

Show more
This is a request for information only and your response is not an offer. This is not a solicitation or request for quotes and no contract or purchase order will be awarded from this notice. There is no solicitation, specifications or drawings, available at this time. This request for information does not commit the Government to pay any costs incurred in the preparation or submission to this market survey. Scope of Work: Interested parties are asked to respond with capability to support an innovative contracting approach that supports four phases of requirements: Phase 1: LAYBERTH Provide a layberth to support a TAO 187, TAKE 1 or ESB Class vessel(s), complete with all ship services including shore power. Services will generally be in accordance with MSC Standard Work Item (SWI) 011. Approach, berthing and mooring requirements will be in accordance with MSC SWI 003. Layberth period may be between 1 month and 9 months in duration. Phase 2: LABOR While the vessel is in Phase 1, there will be a limited number of crew members living onboard, and conducting daily maintenance procedures. To assist the crew, the contractor will be required to provide supplemental skilled labor to accomplish shipboard preventive maintenance and repair. Supplemental labor requirements will generally be as follows: Supervision The contractor will provide two supervisory personnel (to be determined at the time of solicitation) that have at least 5 years of work history as a minimum First Assistant Engineer or Chief Mate sailing under a recognized Flag State or equivalent prior US Navy experience. Skilled/Unskilled Labor Two (2) Electricians Two (2) Refrigeration Technicians Four (4) Outside Machinists One (1) Electronics Technician Two (2) Laborers Labor support will be scheduled Mondays through Fridays, 0730-1600 (providing a 30 min lunch break) Phase 3: ADDITIONAL REQUIREMENTS The Contractor will also be prepared to address shipboard repair requirements that may arise during Phase 1, including the provision of OEM technical representatives as may be required. These additional requirements would be exercised through CCOs and Contract Modifications. There will be an - Additional Requirements CLIN under Phase 3. In preparation for the Phase 4 Maintenance and Repair availability, the contractor may be requested to accomplish market research, purchase and store long lead time materials needed to support the Phase 4 work package. Phase 4: MAINTENANCE and REPAIR Availability The last phase of the contract will be a traditional MTA/ROH/DD event for the subject vessel for a Period of Performance (PoP) in the 75-day to 120-day range depending on the vessel and complexity of the work package. If/when a solicitation is released, we will clearly state whether a drydock is required to support the Phase 4 availability. The work package format will resemble MSC's recent testing of our 80/20 plan, where 80% of the work package are known regulatory and other cyclic requirements that will be included in this multi-phase solicitation, and the remaining 20% will be collaboratively definitized between the Contractor and MSC. That final 20% will be negotiated and settled via a contract modification no later than 60 days prior to PoP start. Contracting Approach. Contracts will be firm fixed price. It is envisioned that the solicitation would include specific details of all 4 phases. Phase 1 and Phase 2 would be funded immediately on award. Phase 3 would be exercised as CCOs via contract mod. Phase 4 would be funded at milestones commensurate with our 80/20 POAM. Respondent Information. Interested parties are requested to respond with the following information: Ability to meet the general requirements as described above Maximum number and types of ships that could be accommodated simultaneously Any issues or concerns with the described requirements. Send responses to: Neil Lichtenstein, neil.a.lichtenstein.civ@us.navy.mil Joe Martin, thomas.j.martin15.civ@us.navy.mil Damian Finke, damian.w.finke.civ@us.navy.mil

More opportunities from Department Of Defense → Mschq Norfolk

Same awarding agency

NAICS: 483111
New
Federal
US EAST COAST/GULF COAST JONES ACT TANKER (EXTENDED TERM CHARTER)
Solicitation # SS-27-005
The Military Sealift Command is conducting a sources sought request for information under solicitation SS-27-005 to identify the availability and estimated pricing for an extended term charter of one clean, U.S. flag Jones Act compliant tanker. The vessel must be capable of carrying at least 280,000 BBLs of clean product, such as F76, JP5, JP8, or JA1, with a laden draft not exceeding 12 meters and a minimum speed of advance of 13 knots in moderate weather. While the primary operating area is the US East Coast and Gulf Coast, the vessel must possess worldwide capability. The proposed charter period begins on December 9, 2027, consisting of a base year and four subsequent option years, extending through November 6, 2032. Technical requirements include the installation of three CONSOL stations within six months of delivery and one Fuel Delivery Station on the port side within one year of award. The Fuel Delivery Station must comply with NTTP 4-01.4, IEC60533 electrical standards, and Federal Specification RR-W-410 for spanwires, with the ability to operate continuously in Sea State 5 conditions. Interested parties must provide company history, security clearance status, and estimated pricing for the daily charter rate, station installations, and FDS maintenance. The procurement is managed by the Strategic Sealift Program Support Office in Norfolk, Virginia, with delivery occurring on the US Gulf Coast and redelivery at the charterer's option across the East, Gulf, or West Coasts.
Deep Sea Freight Transportation

POSTED

about 9 hours ago

DEADLINE

in 14 days
View Details
NAICS: 488390
New
Federal
Underwater Inspection in Lieu of Dry-docking (UWILD) of the USNS SACAGAWEA
Solicitation # N3220527Q7018
Solicitation N3220527Q7018 is a request for quotation for commercial diving services to perform an Underwater Inspection in Lieu of Dry-docking (UWILD) for the USNS SACAGAWEA in Guam. Issued by the Department of Defense via Mschq Norfolk, this firm-fixed-price contract requires the contractor to conduct inspections as an alternative to a standard dry-docking survey, adhering to specific NAVSEA drawings for capacity, docking, and shell expansion. The period of performance is scheduled from November 16, 2026, to November 26, 2026. Key deliverables include electronic PDF condition reports for any discovered deficiencies, which must be submitted within 24 hours of discovery. The acquisition is not set aside for small businesses, though a HUBZone price evaluation preference is available. Award will be based on best value, determined through an overall comparative analysis of technical capability and past performance. All quotes must be submitted via the Procurement Integrated Enterprise Environment (PIEE) portal by October 26, 2026, with an anticipated award date of November 6, 2026. Compliance requirements include the execution of a non-disclosure agreement, adherence to high-voltage safety protocols, and the use of the Wide Area WorkFlow (WAWF) system for electronic invoicing.
Other Support Activities for Water Transportation

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS