This Award Notice opportunity from Florida was posted on March 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Master Contract for Statewide AE Continuing Services
Awarded
RFSOQBDC01-23/24State & Local
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
Contract CN803 is a master professional services agreement between the Florida Department of Environmental Protection and Apex Companies, LLC, formerly known as The Weiler Engineering Corporation. Established under solicitation RFSOQBDC01-23/24, this statewide contract provides architecture and engineering continuing services for development and improvement projects across various Florida State Parks. The agreement operates on a task-assignment basis, utilizing a combination of fixed-fee and cost-reimbursement structures to deliver services including preliminary and final design, permitting, budgeting, and construction administration.
The scope of work encompasses a wide array of infrastructure and preservation projects, such as road paving and stormwater management at Gasparilla Island State Park, restroom remodels at Bill Baggs Cape Florida State Park, and historic ruins preservation at Yulee Sugar Mill Ruins Historic State Park. Other significant efforts include hurricane redevelopment at Cayo Costa State Park, dock expansions at Rookery Bay Research Reserve, and sewage connection upgrades at Koreshan State Historic Site. Many task assignments have been modified via change orders to extend performance deadlines to March 30, 2030, to align with the master contract end date and ensure the completion of construction-phase services.
General Info
Florida DEP and Apex Companies agreement for statewide state park architecture and engineering services.
HighAI Summary for Amendment No. 1 to Agreement No. CN803 (Florida DEP & Apex Companies, LLC): Amendment No. 1 to Professional Services Agreement No. CN803 between the Florida Department of Environmental Protection and Apex Companies, LLC. The primary purpose of this amendment is to formally update the Consultant's name from The Weiler Engineering Corporation to Apex Companies, LLC, reflecting a legal name change that occurred on November 23, 2024. All other terms and conditions of the original agreement remain in effect.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Charlotte Harbor Preserve State Park - Pole Barn Maintenance Building Replacement (CN803 TA9): Consultant's Task Assignment Notification (TA9) for the Florida Department of Environmental Protection. The document outlines the scope for Weiler Engineering Corporation to provide design and permitting for a new fire line, fire hydrant, and final construction plans for the Pole Barn replacement at Charlotte Harbor Preserve State Park. It includes a detailed breakdown of three subtasks (100% plans, permit approval, and CCU permitting) with a total cost of $11,145.50, dated May 2025.
PDF
PDF, High priority: read this firstaward
HighAI Summary for DEP Contract CN803 - The Weiler Engineering Corporation: Professional Services Agreement (August 2024) between the Florida Department of Environmental Protection and The Weiler Engineering Corporation. This is a master contract for AE statewide projects at Florida State Parks, established under solicitation RFSOQBDC01-23/24. The agreement specifies a task-assignment basis for professional engineering services, including design, budgeting, and construction supervision, with a combination of fixed fee and cost reimbursement.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Bill Baggs Restroom Task Assignment Change Order: A Task Assignment Change Order for the Florida Department of Environmental Protection (FDEP) regarding the Bill Baggs Cape Florida State Park Restroom #2 project. The document requests and approves a no-cost time extension of 60 days, moving the task end date from December 30, 2025, to February 28, 2026, to allow the contractor to finalize construction.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP CN803 TA13 - Gasparilla Island State Park Sea Grape Day-Use Restroom: Consultant's Task Assignment Notification and associated proposal for Weiler Engineering Corp (WEC) under FDEP Contract CN803, Task Assignment 13. The project involves Construction Administration services for the Gasparilla Island State Park Sea Grape Day-Use Restroom, specifically transferring incomplete sub-tasks from CN230 TA63. The total fixed price cost is $22,180.00 with a completion date of 03/18/2026. The document details specific subtasks (1A-1D) including pre-construction meetings, submittal reviews, and RFI responses.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP CN803 TA1 - Gasparilla Island State Park Road Paving: Consultant's Task Assignment Notification (TA1) under Contract CN803 for Weiler Engineering Corporation. The project involves design, permitting, and construction administration for road paving and stormwater management at Gasparilla Island State Park. The total task amount is $118,739.13, with a completion date of 12/31/2026. The document includes a detailed proposal and cost breakdown for Subtask 1 (30% Preliminary Design), including concept planning, surveys, and geotechnical reports.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP CN803 TA21 - John Pennekamp Coral Reef State Park New Septic: Consultant's Task Assignment Notification and associated proposal for Weiler Engineering Corp to perform construction phase services (CA services) for a new septic system at John Pennekamp Coral Reef State Park. The task (TA21) includes reviewing contractor submittals, responding to RFIs, and performing substantial completion inspection and certification. The total fixed price cost is $3,090.00, with a completion date of January 31, 2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP CN803 Task Assignment 12 - Yulee Sugar Mill Ruins Preservation: Consultant's Task Assignment Notification and proposal for Weiler Engineering Corporation under FDEP Contract CN803. The project involves historic ruins preservation at Yulee Sugar Mill Ruins Historic State Park, specifically transferring design, permitting, and construction administration tasks. The total task amount is $25,147.50 with a completion date of 06/01/2026. The scope includes 60% and 100% structural restoration plans for the kettle train, boiler, rolling press, and well.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP CN803 Task Assignment 15 - Rookery Bay Research Reserve Dock Extension: Consultant's Task Assignment Notification for the Florida Department of Environmental Protection (FDEP) and The Weiler Engineering Corporation. This task (TA 15) covers design, permitting, and construction services for a 30-foot floating dock extension at Rookery Bay Research Reserve. The total task amount is $105,675.06, with a completion date of 12/31/2026. The document includes a detailed scope of work for preliminary design, surveying, and benthic resource surveys.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP CN803 Task Assignment 17 - Oscar Scherer State Park Road Paving & Repairs: Consultant's Task Assignment Notification (TA17) under FDEP Contract CN803 for Weiler Engineering Corporation. The project involves road paving and repairs at Oscar Scherer State Park, specifically transferring construction administration subtasks to support design and construction. The scope includes Gopher Tortoise surveys, permit applications, and relocation efforts. Total task amount is $47,280.04, consisting of $35,057.04 fixed price and $12,223.00 cost reimbursement. The task is scheduled for completion by January 30, 2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP CN803 Task Assignment 24 - Koreshan State Historic Site Upgrade Campsites: Consultant's Task Assignment Notification (TA 24) under FDEP Contract CN803 for Weiler Engineering Corporation. The project involves upgrading campsites and roadway areas at Koreshan State Historic Site, including the transfer of incomplete sub-tasks from CN230. The total fixed price for the task is $16,510.00, with a completion date of February 16, 2026. The document includes a detailed proposal and cost breakdown for subtasks such as submittal reviews, RFI responses, and construction inspections.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP CN803 Task Assignment 35 - Don Pedro Island State Park Dock Path Restoration: Consultant's Task Assignment Notification for FDEP Contract CN803, Task 35, awarded to Apex Companies (Weiler Engineering Corporation). The project involves the restoration of the dock path at Don Pedro Island State Park damaged by Hurricane Milton. The scope includes a site plan, scope of work, drafting, bidding assistance, and one interim site visit. The total fixed price cost is $12,576.64, with a completion date of 03/30/2030.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP CN803 Task Assignment 9 Change Order 1 - Charlotte Harbor Preserve State Park: Task Assignment Change Order No. 1 for Contract CN803, Project 61409C (Charlotte Harbor Preserve State Park Pole Barn Project). The modification adds construction administration services and extends the task end date to 03/31/2027. It increases the total task amount by $24,611.53, bringing the total to $35,757.03. The scope includes subtasks for assistance during bidding, RFI responses, and submittal reviews provided by Weiler Engineering Corporation.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Consultant Task Assignment No. 6 - Rookery Bay Research Reserve: Consultant's Task Assignment Notification (TA 6) under FDEP Contract 803 for The Weiler Engineering Corporation. The project involves plan revisions for the Briggs Boardwalk at Rookery Bay Research Reserve to ensure piles are in the same location as existing conditions. The total task amount is $31,387.53, consisting of a fixed price cost of $29,917.53 and a cost reimbursement not to exceed $1,424.00. The agreement was executed on April 30, 2025, with a completion date of July 1, 2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Consultant Task Assignment TA33 - Gasparilla Island State Park: Consultant's Task Assignment Notification (TA33) under FDEP Contract CN803 for Apex Co LLC. The project involves the Sea Grape Day-Use Restroom at Gasparilla Island State Park. This task replaces the expired TA13, transferring remaining work and utilizing rates from CN230. The total fixed price cost is $33,697.50, with a completion date of 03/30/2030. Key tasks include responding to building department comments, contractor RFIs, and monthly construction inspections.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Contract 803 Task 6 Change Order 1 - Briggs Boardwalk: Change Order No. 1 for FDEP Contract 803, Task Assignment 6, regarding the Briggs Boardwalk project. The modification adds funding for permit services and Gopher Tortoise survey and relocation performed by The Weiler Engineering Corporation. The net increase in task amount is $44,253.96, bringing the total task amount to $75,595.49. The document includes a detailed proposal dated December 18, 2025, outlining FWC coordination and survey requirements.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Contract CN803 Task 22 Change Order 01 - Dr. Von D. Mizell-Eula Johnson State Park: Change Order 01 for FDEP Contract CN803, Task Assignment 22, regarding restroom improvements at Dr. Von D. Mizell-Eula Johnson State Park. The modification provides a no-cost time extension of 1,304 days, moving the task end date from September 3, 2026, to March 30, 2030, to allow for the completion of administration and construction-phase services. The total task amount remains unchanged at $29,632.50.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Contract CN803 Task 25 Change Order 1 - Koreshan State Park Sewage Connection: Change Order No. 1 for Contract CN803, Task Assignment 25, regarding the Koreshan State Park Sewage Connection project. The modification extends the task end date to 03-30-2030 and adds subtasks 7 and 8 for Lee County Utilities permitting and updating prints to current Florida Building Code. It increases the task amount by $14,645.00, bringing the total task value to $41,852.50.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Contract CN803 Task 8 Change Order 1 - Indian Key Historic State Park: Task Assignment Change Order No. 1 for FDEP Contract CN803 (Task 8), regarding the Dock and Pavilion Replacement at Indian Key Historic State Park. The modification provides a time extension of 1,369 days, moving the task end date from June 30, 2026, to March 30, 2030, at no additional cost to the agency.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Contract CN803 Task 9 Change Order #2 - Time Extension: A Task Assignment Change Order and formal request from Apex Companies to the Florida Department of Environmental Protection (FDEP) for a time-only extension of the Charlotte Harbor Preserve State Park – Pole Barn project. The request extends the task end date from March 31, 2027, to March 30, 2030 (1,095 days) to align with the Master CN803 contract end date, with no additional cost to the agency.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Contract CN803 Task Assignment 02 Change Order 01: Change Order 01 for FDEP Contract CN803 (Task Assignment 02) regarding Hurricane Ian Redevelopment at Cayo Costa State Park. The modification adds services for the evaluation and design of reverse osmosis water treatment systems across six park locations, including permitting due diligence and technical evaluation. It increases the task amount by $6,718.45 and extends the task end date to March 30, 2030.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Contract CN803 Task Assignment 14 Change Order 01: Task Assignment Change Order No. 01 for the Rookery Bay National Estuarine Research Reserve HVAC Project. The modification covers the design, permitting, and time extension for the replacement of the existing HVAC system at the Educational Learning Center. It increases the task amount by $132,385.43 (totaling $148,973.33) and extends the task end date to March 30, 2030. The document includes a detailed proposal from The Weiler Engineering Corporation dated April 23, 2026, outlining technical scope including site investigations, demolition drawings, and 30% design deliverables.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Contract CN803 Task Assignment 15 Change Order - Rookery Bay Shell Island Dock Expansion: A Task Assignment Change Order for the Florida Department of Environmental Protection (FDEP) regarding the Rookery Bay Research Reserve Shell Island Dock Expansion (Project No: RM2401). The document requests and approves a time extension for Task Assignment No. 15, moving the end date from December 31, 2026, to March 30, 2030, with no additional cost to the agency. The modification was signed by FDEP representatives and the consultant, Robin Palmer of Apex Companies, between October 6 and October 14, 2026.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Contract CN803 Task Assignment 16 Change Order - Rookery Bay Research Reserve: A Task Assignment Change Order and formal request from Apex Companies to extend the performance period for the Rookery Bay Research Reserve Goodland Dock Extension (Project No: RM2401). The modification extends the task end date from September 15, 2026, to March 30, 2030, with no additional cost to the Florida Department of Environmental Protection.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Contract CN803 Task Assignment 20 - John Pennekamp State Park Mangrove Trail Boardwalk: Consultant's Task Assignment Notification for Weiler Engineering Corp to provide construction administration services for the John Pennekamp Coral Reef State Park Mangrove Trail Boardwalk replacement. Dated September 2, 2025, the task includes reviewing contractor submittals and conducting a substantial completion walk-through with a punchlist. The total fixed price cost is $4,630.00 with a completion date of January 31, 2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Contract CN803 Task Assignment No. 02 - Cayo Costa State Park: Consultant's Task Assignment Notification and proposal for Weiler Engineering Corporation under FDEP Contract CN803. The project involves Hurricane Ian redevelopment at Cayo Costa State Park, specifically focusing on design, permitting, and construction administration for electrical investigations, generator platforms, and dredge/fill work. The total task amount is $188,734.04 with a completion date of 12/31/2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Contract CN803 Task Assignment No 10 - Bill Baggs Cape Florida State Park: Consultant's Task Assignment Notification for the Bill Baggs Cape Florida State Park Restroom Remodel #2. This document transfers construction administration subtasks 1A through 11 from CN230-TA79 to CN803-TA10. The agreement is with Weiler Engineering Corporation, featuring a fixed price cost of $24,920.00 and a completion date of 12/30/2025. It includes detailed subtask descriptions for construction phase services, submittal reviews, and inspections.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Contract CN803 Task Assignment No. 4 - Jonathan Dickinson State Park: Consultant's Task Assignment Notification for Contract CN803, Task Assignment No. 4, issued by the Florida Department of Environmental Protection. The project involves structure renovations and duplex conversion at Jonathan Dickinson State Park. The task transfers construction administration subtasks 1 through 4 from CN230-TA74 to CN830-TA5, with a total fixed price cost of $8,435.00. The document includes a proposal from Weiler Engineering Corporation dated April 21, 2025, detailing subtasks for submittals, construction assistance, and substantial completion walk-throughs.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Contract CN803 Task Assignment No. 8 - Indian Key Historic State Park: Consultant's Task Assignment Notification for Weiler Engineering Corp. to provide Construction Administration (CSA) services for the Dock and Pavilion Replacement at Indian Key Historic State Park. Signed September 3, 2025, with a total fixed price cost of $24,049.35 and a completion date of June 30, 2026. Includes detailed subtasks for responding to building department comments, contractor RFIs, and monthly construction inspections.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Contract CN803 Task Assignment TA26 - Lovers Key State Park Accessible Launch: Consultant's Task Assignment Notification and supporting proposal dated August 28, 2025, for the Lovers Key State Park Accessible Launch project. The document authorizes Weiler Engineering Corporation to perform the transferral of incomplete sub-tasks from CN230 TA67. It includes a fixed-price cost of $12,595.00 with a completion date of January 17, 2026, and details specific subtasks for bidding assistance, pre-construction meetings, and submittal reviews.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Gasparilla Island State Park Road Paving - Task Assignment Change Order: A Task Assignment Change Order for FDEP Contract No: CN803, Task Assignment No 1, regarding road paving at Gasparilla Island State Park. The document requests and approves a time extension of the task end date from December 31, 2026, to March 30, 2030, with no additional cost to the agency. Signed by FDEP representatives and the consultant, Apex Companies, in October 2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Koreshan State Historic Site Bathhouse Replacement - TA31: Consultant's Task Assignment Notification (TA31) under FDEP Contract CN803 for the replacement of a fire-damaged bathhouse at Koreshan State Park. The project, assigned to Weiler Engineering Corporation, includes design, permitting, and construction administration. The total task amount is $115,733.34, consisting of a fixed price cost of $105,233.34 and a not-to-exceed cost reimbursement of $10,500.00. The completion date is set for 03/30/2030, with the document signed on June 3, 2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Lake Manatee State Park Ranger Residence - Task Assignment 32: Consultant's Task Assignment Notification and proposal for Contract CN803, Task 32. Apex Co LLC will provide civil engineering services for the Lake Manatee State Park Ranger Residence, including professional survey, lead/asbestos testing, 60% and 100% design plans, and permitting for a double-wide manufactured home. Total task amount is $38,287.08 with a completion date of 03/31/2030.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Task Assignment Change Order - Gasparilla Island State Park Chapel: A Task Assignment Change Order for FDEP Contract No: CN803, Task Assignment No: 30, regarding the Gasparilla Island State Park Chapel project. The document requests and approves a time extension of the task end date from January 7, 2027, to March 30, 2030, with no additional cost to the agency. Signed by FDEP representatives and Apex Companies in October 2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Task Assignment No 18 - Hillsborough River State Park Concession Building: Consultant's Task Assignment Notification and associated proposal for Weiler Engineering Corporation under FDEP Contract No CN803. The project involves preparing concept plans for the hurricane resiliency replacement of the concession building at Hillsborough River State Park. The total fixed price cost is $24,997.44, with a completion date of 06/30/2027.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Task Assignment TA25 - Koreshan State Historic Site Sewage Connection: Consultant's Task Assignment Notification and associated proposal for the Koreshan State Historic Site Sewage Connection (Contract CN803, TA25). The document, executed between September 23 and September 30, 2025, authorizes Weiler Engineering Corporation to perform engineering services during construction, including pre-construction meetings and submittal reviews. The total fixed price cost is $27,207.50, with a completion date of December 31, 2027.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP/The Fills - Signage Installation, Fencing, and Asphalt Apron (CN 803/TA 11): Proposal and cost breakdown from Weiler Engineering Corporation for Task Assignment 11 under Contract 803 for the FDEP/The Fills project. The document specifies Subtask 1 (100% Plans), including deliverables (Cover Sheet, Existing Conditions, Site Plan, Details and Specifications), a fixed price cost of $5,002.99, and a 10-day project schedule.
PDF
PDF, High priority: read this firstproposal
HighAI Summary for Gasparilla Island State Park Chapel Design Proposal - CN 803, TA30: A professional services proposal dated January 6, 2026, from Weiler Engineering Corporation for the Gasparilla Island State Park Chapel Design (CN 803, TA30). The document details specific subtasks including Cultural Resource Assessments (CRAS), 30% and 60% design plans, surveys, and permit applications. It includes detailed fixed-price cost breakdowns, man-hour documentation, and specific deliverables for each phase of the project.
PDF
PDF, High priority: read this firstproposal
HighAI Summary for John Pennekamp Coral Reef State Park - Bridge Investigation and Repair (CN 803, TA 03): A proposal dated March 28, 2025, from The Weiler Engineering Corporation to the Florida Department of Environmental Protection. The project involves a structural inspection and the creation of repair plans for a bridge at John Pennekamp Coral Reef State Park. The proposal includes two subtasks (Structural Investigation and Repair Plans) with a total fixed price cost of $19,347.88 and a project schedule of 45 calendar days.
PDF
PDF, High priority: read this firstproposal
HighAI Summary for John Pennekamp Restroom Replacement - Construction Administration Proposal (CN 803, TA19): A proposal dated September 2, 2025, from Weiler Engineering Corporation to the Florida Department of Environmental Protection for construction phase services for the John Pennekamp Restroom Replacement. The document details five subtasks (1A-1E) including bidding assistance, submittal review, construction assistance, and punchlist walk-throughs, with a total fixed price cost of $18,695.00.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Learning Center at Savanna’s Preserve State Park - Contract 803, TA7: Proposal dated May 15, 2025, from The Weiler Engineering Corporation to the Florida Department of Environmental Protection for construction administration services (Contract 803, Task Assignment 7). The document details a man-hour budget and fixed-price costs for subtasks including submittal review, construction assistance, flooring inspection, and substantial completion walk-through.
PDF
PDF, High priority: read this firstproposal
HighAI Summary for Mizell-Johnson State Park Restroom Improvements - CA Services Proposal (CN 803, TA 22): A proposal submitted by Weiler Engineering Corporation on September 3, 2025, to the Florida Department of Environmental Protection for construction administration (CA) services. The document outlines specific subtasks for Broward County permitting applications and approvals, as well as construction phase services including submittal reviews and RFI responses. It includes detailed fixed-price cost breakdowns by position classification and hourly rates.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFSOQ RFSOQBDC01-23/24: Statewide Architecture/Engineering Continuing Services: Issued January 18, 2024, by the Florida Department of Environmental Protection, this Request for Statements of Qualifications (RFSOQ) seeks licensed architecture and engineering firms for statewide continuing services related to park development and improvements. The solicitation includes requirements for green building standards, E-Verify compliance, and a detailed schedule with a proposal deadline of February 20, 2024.
PDF
PDF, High priority: read this firstproposal
HighAI Summary for Rookery Bay Environmental Learning Center HVAC Evaluation Proposal: A professional services proposal from The Weiler Engineering Corporation (dated July 21, 2025, Rev 2) for an HVAC evaluation at the Rookery Bay Environmental Learning Center (CN 803/TA 14). The scope includes mechanical/electrical site investigations, load calculations, and the development of HVAC system options. The document details a two-subtask structure (Preliminary and Final Reports) with associated man-hour rates, fixed price costs totaling $16,587.90, and a project schedule.
PDF
PDF, High priority: read this firstproposal
HighAI Summary for Ten Thousand Islands Field Research Station - Goodland Dock Extension Proposal: A proposal from Weiler Engineering Corporation dated June 14, 2025 (Revision 3: July 10, 2025) for the Florida Department of Environmental Protection. The project involves the installation of three floating dock extensions at the Ten Thousand Islands Field Research Station. The document details the scope of work for Subtask 1, including preliminary 30% design, topographical surveys, and environmental benthic resource surveys, complete with detailed man-hour breakdowns and fixed-price cost tables.
PDF
PDF, High priority: read this firstproposal
HighAI Summary for Weiler Engineering Proposal - Gasparilla Island State Park Chapel Concepts (CN 803, TA 5): Proposal dated April 30, 2025, from Weiler Engineering Corporation to the Florida Department of Environmental Protection for design concepts regarding the Gasparilla Island State Park Armory Chapel. The scope includes providing two 3D rendering concepts (open air and symbolic art structure) and three cost estimates for a total fixed price of $18,017.95, with a 30-day project schedule.
PDF
PDF, High priority: read this firstproposal
HighAI Summary for Weiler Engineering Proposal - Myakka River State Park Concession Building (CN 803 TA 23): Proposal dated September 3, 2025, from Weiler Engineering Corporation to the Florida Department of Environmental Protection for CEI services regarding the Myakka River State Park Concession Building (Contract 803, TA23). The document includes fixed price cost breakdowns for Subtask 2 (Substantial Completion), Subtask 3 (Final Completion), and Subtask 4 (Contractor Submittals), detailing hourly rates and man-hours for various engineering positions.
PDF
PDF, Low prioritymodification
LowAI Summary for CN803 - Weiler Engineering Corp. Contract Manager Change: Email notification dated January 7, 2026, from the Florida Department of Environmental Protection announcing a change in contract management for project CN803 (Weiler Engineering Corp.). Laurinda Micheels replaces Vu Nguyen as the contract manager.
PDF
PDF, Low prioritytask-order-award
LowAI Summary for FDEP Consultant Task Assignment No. 34 - Apex Engineering: Consultant's Task Assignment Notification (TA 34) under FDEP Contract CN803, dated September 2026. Apex Engineering is tasked with providing engineering services for post-construction inspection and as-built plans for signage installation, fencing, and an asphalt apron at the Florida Keys Overseas Heritage Trail project location. The total fixed price for the task is $3,847.64.