This Award Notice opportunity from Florida was posted on February 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
Contract CN824 is a professional services master agreement between the Florida Department of Environmental Protection and George F. Young, Inc. for statewide architecture and engineering services at Florida State Parks. Established in August 2024 following a request for statements of qualifications, the contract operates on a task assignment basis to support park development, infrastructure improvements, and disaster recovery. The scope of work is broad, encompassing professional surveying, geotechnical investigations, civil and structural engineering, and construction administration across multiple state park locations.
Key projects under this agreement include the replacement of a restroom building at Blue Spring State Park, the design and construction of a ranger station and ADA kayak launch at Werner-Boyce Salt Springs State Park, and the replacement of pedestrian bridges on the General Van Fleet State Trail. The contract also covers critical infrastructure repairs and inspections, such as seawall stabilization at Rainbow Springs State Park, historic repairs at Ravine Gardens State Park, and hurricane recovery inspections for bridges and facilities at Hillsborough River and Homosassa Springs State Parks. Additionally, the agreement supports the completion of construction documents and administration for the Fort Zachary Taylor Visitor Center. Several task assignments have been modified through change orders to expand technical scopes or extend completion dates, with some project timelines extended to February 27, 2030.
General Info
Florida DEP hired George F. Young for statewide state park architecture and engineering services.
HighAI Summary for CN824 - George F. Young TA04 Pedestrian Bridge Replacement Proposal: A proposal dated April 29, 2025, from George F. Young Inc. to the Florida Department of Environmental Protection for professional surveying, environmental, and engineering services. The project involves replacing four wooden bridges with precast concrete bridges on the General Van Fleet State Trail. The document includes a detailed scope for Subtask 1 (Geotechnical Investigation), including field exploration, laboratory testing, and a fixed-price cost summary.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for CN824 TA01 - Werner-Boyce Salt Springs State Park Ranger Station, Boardwalk, & Kayak Launch: Consultant's Task Assignment Notification (TA01) under FDEP Contract CN824 for George F. Young, Inc. The project involves the design and construction of a ranger station, boardwalk network extensions, and ADA kayak launch at Werner-Boyce Salt Springs State Park. The task includes the transfer of incomplete construction administration subtasks and permitting services. Total task amount is $122,907.46 with a completion date of 06/30/2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for CN824 Task Assignment 03 - Blue Spring State Park Restroom Replacement: Proposal from George F. Young, Inc. dated April 29, 2025, for professional surveying, architectural, and engineering services to replace a structurally inadequate bathroom building at Blue Spring State Park. The document outlines three subtasks: Pre-engineering Investigation, Topographic Survey, and Geotechnical Engineering, including detailed man-hour summaries and fixed-price costs.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP CN824 Task Assignment 03 Change Order 01 - Blue Spring State Park Restroom Replacement: Change Order 01 for Contract CN824, Task Assignment 03, regarding the Restroom Replacement at Blue Spring State Park. The modification adds professional civil and utility engineering services (Subtasks 8A, 8B, and 8C) to address existing utility connection issues. This increases the task amount by $25,200.00, bringing the total task amount to $99,369.61. The document includes the signed Change Order form and the detailed proposal from George F. Young, Inc. dated October 22, 2025.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP CN824 Task Assignment 03 Change Order 02 - Blue Spring State Park Restroom Replacement: Task Assignment Change Order No. 02 for Contract CN824, Project 61565C, regarding the Blue Spring State Park Restroom Replacement. The modification adds professional services for a Cultural Resource Assessment Survey (CRAS), including a Chapter 1A-32 permit and CRAS report. The change order increases the task amount by $26,235.18, bringing the total task amount to $125,604.79. The document includes a man-hour summary and scope of work for subtasks 9A and 9B, dated January 8, 2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP CN824 Task Assignment 09 - Fort Zachary Taylor Visitor Center: Consultant's Task Assignment Notification for George F. Young, Inc. under FDEP Contract CN824 (Task Assignment 09). The project involves the continuation of services for the Fort Zachary Taylor Historic State Park Visitor Center, specifically the completion of 90% and 100% Construction Documents, a Geotechnical Report, and Construction Administration. The total fixed price cost is $215,290.06, with a completion date of 06/30/2027.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP CN824 Task Assignment 1 Change Order 1 - Werner-Boyce Salt Springs State Park: Change Order 1 for Task Assignment 1 under Agreement CN824 for the Florida Department of Environmental Protection. The modification covers Cultural Resource Assessment Survey (CRAS) services and 1A-32 permit updates for the New Ranger Station, Boardwalks, and ADA Kayak Launch at Werner-Boyce Salt Springs State Park. The total funding amount is $9,152.64, with a task end date of 06/30/2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Consultant Task Assignment No. 08 - Homosassa Springs State Park Bridge Inspection: Consultant's Task Assignment Notification (Task No. 08) under FDEP Contract CN824 for George F. Young, Inc. The project involves professional engineering bridge inspection for the Ellie Schiller Homosassa Springs Wildlife State Park Hurricane Helene Redevelopment Project. The scope includes structural inspection of a timber bridge per NBIS, AASHTO, and FDOT standards, with a total fixed price cost of $13,046.00 and a completion date of 06/30/2026.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Contract CN824 Change Order 02 - Werner-Boyce Salt Springs: Task Assignment Change Order No. 02 for the Werner-Boyce Salt Springs State Park project (Ranger Station, Boardwalk, & Kayak Launch). This is a no-cost time extension for consultant George F. Young, Inc., extending the task end date from June 30, 2026, to February 27, 2030 (an increase of 1,338 days). There is no change to the task amount.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Contract CN824 Task 02 Change Order 01 - Rainbow Springs State Park: Change Order No. 01 for Contract CN824 (Task Assignment 02) regarding the Seawall Entry & Stabilize Bank project at Rainbow Springs State Park. The modification adds civil engineering work for 30% conceptual site plans, including water level research and preliminary grading. It increases the task amount by $19,206.44, bringing the total task amount to $198,681.54. The document includes a man-hour summary and a 30-day project schedule for Subtask 1C.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Contract CN824 Task 09 Change Order 01 - Fort Zachary Taylor Visitor Center: Change Order No. 01 for FDEP Contract CN824, Task Assignment 09, regarding the Fort Zachary Taylor Historic State Park Visitor Center. The modification adds services for the production of a comprehensive Project Specification Manual (Divisions 0-14, 31-32) to complete the 100% Construction Documents. The change increases the task amount by $7,777.50, bringing the total task value to $223,067.56. The document includes the signed change order form and the detailed proposal from George F. Young, Inc., dated March 19, 2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Contract CN824 Task Assignment 05 - Ravine Gardens State Park Historic Repairs: Consultant's Task Assignment Notification (Task 05) for Contract CN824 between the Florida Department of Environmental Protection (FDEP) and George F. Young, Inc. The project involves historic repairs and trail steps rehabilitation at Ravine Gardens State Park, specifically transferring incomplete construction administration subtasks to support design and construction for stair replacements. The document includes a proposal dated July 24, 2025, detailing permitting tasks for the St. Johns River Water Management District and local AHJs. Total task amount is $23,426.00 with a completion date of June 30, 2026.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Contract CN824 Task Assignment 3 Change Order 3 - Blue Spring State Park Restroom Replacement: Change Order No. 3 for Contract CN824, Task Assignment 3, regarding professional construction services for restroom replacement at Blue Spring State Park. The modification increases the task amount by $50,742.71 (bringing the total to $176,347.50) and extends the task end date to February 27, 2030. The scope covers construction administration services, including bidding assistance, preconstruction meetings, and construction phase services, as proposed by George F. Young, Inc. on August 14, 2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Contract CN824 Task Assignment 7 - Hillsborough River State Park: Consultant's Task Assignment Notification for George F. Young, Inc. under FDEP Contract CN824. The task involves professional engineering inspections of the recreation hall and two bridges at Hillsborough River State Park for Hurricane Milton recovery. The total fixed price is $19,758.00, with a completion date of 06/30/2026. The scope includes structural roof inspections and bridge inspections following NBIS, AASHTO, and FDOT standards.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Task Assignment Change Order - CN-370000-CN824-T5CO1: A Task Assignment Change Order from the Florida Department of Environmental Protection (Division of Recreation and Parks) that extends the task end date from June 30, 2026, to February 27, 2030, representing a net change of 1,338 days. The document is digitally signed by FDEP budget, project, and contract representatives, as well as the consultant, with final approval dated May 20, 2026.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDEP Task Assignment Change Order - Rainbow Springs Seawall Entry and Stabilized Bank: A Task Assignment Change Order for the Florida Department of Environmental Protection (FDEP) regarding the Rainbow Springs Seawall Entry and Stabilized Bank project (CN824 TA02). The document requests and approves a no-cost time extension, moving the task end date from December 31, 2026, to February 27, 2030, representing a net increase of 1,154 days. The modification was signed by FDEP representatives and the consultant in October 2026.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDEP Task Assignment No. 6 - Silver Springs State Park Culvert and Road Repairs: Consultant's Task Assignment Notification and proposal for George F. Young, Inc. under FDEP Contract No. CN824. The task covers remaining Construction Administration services for culvert and road repairs at Silver Springs State Park. Includes a fixed price cost of $2,086.56 for a site visit and associated deliverables, with a completion date of 12/31/2025.
PDF
PDF, High priority: read this firstproposal
HighAI Summary for George F. Young Inc. Proposal - Rainbow Springs State Park Seawall Entry & Stabilize Bank: Dated April 22, 2025, this proposal from George F. Young Inc. to the Florida Department of Environmental Protection (FDEP) outlines professional surveying and engineering services for the Headsprings Wall Replacement and Pedestrian Entrance at Rainbow Springs State Park (Agreement CN824 TA2). The document includes a detailed scope of work for Task 1 (30% Concept Plans), including architectural renderings and civil coordination, along with a fixed-price man-hour cost breakdown totaling $31,462.20 for Task 1.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFSOQBDC01-23/24 Statewide Architecture/Engineering Continuing Services: Issued January 18, 2024, by the Florida Department of Environmental Protection, this Request for Statements of Qualifications (RFSOQ) solicits architecture/engineering firms for statewide continuing services related to park development and improvements. The package includes a scope of services, evaluation criteria, and submission instructions, with sealed proposals due February 20, 2024.
PDF
PDF, Low prioritymodification
LowAI Summary for CN824 - George F. Young, Inc Contract Manager Change: Correspondence dated January 7, 2026, notifying the recipient that Laurinda Micheels has replaced Vu Nguyen as the contract manager for the George F. Young, Inc project (CN824).
PDF
PDF, Low priorityaward
LowAI Summary for DEP Professional Services Agreement CN824 - George F. Young, Inc.: A Professional Services Agreement (August 2024) between the Florida Department of Environmental Protection and George F. Young, Inc. for AE Statewide projects at Florida State Parks. The contract establishes a master agreement for professional engineering services provided on a task assignment basis.