Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on April 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Master Services Agreement (MSA) for Design of Minor Projects with Construction Costs less than $7,500,000.00

Closed
PS-6554-25/FMAGState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 4 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

Seminole County is seeking multiple qualified professional consulting firms to provide ongoing design and environmental permitting services for a variety of minor infrastructure projects, with construction costs not exceeding 7.5 million dollars and study costs up to 500,000 dollars, in accordance with Florida Statute 287.055 (CCNA). The scope encompasses a broad range of projects including roadway construction, water and sewer design, traffic safety enhancements, sidewalk and bicycle/pedestrian improvements, intersection upgrades, stormwater management, traffic signal design, ITS infrastructure, and other roadway enhancements. The selected firms will be responsible for preliminary and final design phases, environmental and sub-basin permitting, and additional support services such as peer reviews. To qualify, firms must be FDOT pre-qualified in specific work groups related to highway design, structures, bridges, signage, signalization, surveying, and right-of-way mapping. The estimated annual expenditure for these services is approximately 3 million dollars, with the contract being managed through a Master Services Agreement. The solicitation, posted in April 2025 with a response deadline in June 2025, is managed by the Seminole County Public Works Engineering Department. The contract aims to ensure timely, cost-effective delivery of multiple minor projects across the county’s infrastructure portfolio. Supporting documents include detailed scopes of work for construction management at the Seminole County Administration Building, as-needed gunsmithing services at Miami-Dade County facilities, and building program development for a proposed indoor complex venue. These documents outline the responsibilities, qualifications, and project deliverables required for each scope, emphasizing the importance of experienced, qualified professionals to support the county’s infrastructure development, maintenance, and facility planning initiatives.

General Info

Agency

Florida → Seminole Public Works - Engineering

Place of Performance

FL, USA

Set-Aside

NONE

Documents

3

PS-6554-25/MAG Master Services Agreement for Design of Minor Projects

PDF, High priority: read this firstrfp
High

PS-6554-25 Master Services Agreement for Design of Minor Projects

PDF, High priority: read this firstcontract-document
High

Seminole County Public Works Minor Projects Scope of Services

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Seminole Public Works - Engineering
Contacts1 person available
OfficeN/A
Organization / Agency
Florida → Seminole Public Works - Engineering
Office AddressN/A

Full Description

Show more
Seminole County is requesting continuing services for professional services as defined by Florida Statue 287.055 (CCNA). Under CCNA, work orders are currently limited by construction costs of $7,500,000 or study costs of $500,000.It is the intent of Seminole County to retain multiple Consultants (approximately 6) to perform services consisting of, but not limited to Construction plan preparation and Environmental and drainage permitting for minor projects.Projects under this Master Services Agreement will be for projects including, but not limited to the following:Roadway Construction ProjectsWater, Sewer, and Reclaimed water Design Services for Environmental Services DepartmentRoadway Traffic Safety ProjectsSidewalks and other Bicycle and Pedestrian ProjectsIntersection ImprovementsStormwater/Water Quality Improvement ProjectsStormwater Basin StudiesTraffic Signal DesignTraffic StudiesPreliminary Engineering ServicesITS Services (including Fiber Optic Infrastructure as-built development, GPS services and fiber attachment Agreements)Other Misc. Roadway ImprovementsMisc. Design Support ServicesPeer ReviewsAdditional projects will be for the preliminary and final design phases, as well as intensive sub-basin and environmental permitting services.Submitting Firms must be FDOT Pre-qualified in the following Work Groups listed below: 3.1 - Minor Highway Design (Required for Prime Consultant)3.2 - Major Highway Design (Required for Prime Consultant)Submitting Firms OR utilized Sub-Contractor must be FDOT Pre-qualified in the following Work Groups listed below: 4.1.1 - Misc. Structures4.1.2 - Minor Bridge Design7.1 - Signing, Pavement Marking & Channelization7.3 - Signalization8.1 - Control Surveying8.2 - Design, Right of Way, and Construction Surveying8.4 - Right of Way MappingEstimated Annual Usage: $3,000,000.00 Per Year

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS