Material Handling and Storage Aid Systems at JB Lindsey Graham, SC
Open
FA860427QB002Federal
Response Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
This requirement is for the design, fabrication, installation, and testing of a mechanized materials handling system (MMHS) and storage aid system for Buildings 506 and 543 at Joint Base Lindsey Graham, South Carolina. The project encompasses a wide range of equipment, including a gantry crane system, manual gravity and expandable roller conveyors, mobile aisles, bin shelving, pallet racks (Types P1 through P7), steel decking, and rolling safety ladders. The contractor is responsible for providing all necessary labor, materials, and equipment, as well as performing system adjustments and providing orientation to Government personnel. The total project must be completed within 240 days from the date of award, with specific delivery milestones ranging from 90 to 210 days depending on the line item.
This procurement is a Total Small Business Set-Aside. The scope of work includes the removal of existing equipment in Building 506 and the integration of new systems across both buildings. Acceptance is contingent upon the successful completion of a System Checkout Test, Quality Conformance Test, and a Reliability Demonstration Test (RDT). Proposals are evaluated based on technical acceptability, requiring the submission of commercial literature and cut sheets to verify the equipment provided. All work must comply with the Cover Purchase Description, associated appendices, and applicable OSHA and governmental regulations.
General Info
Design, install, and test materials handling and storage systems at Joint Base.
CLIN 0002 through CLIN 0004:Ship To:Philip Walker- Receiving Officer 306 North Graves Ave.Building 543JB Lindsey Graham, North, OH, 29404
Set-Aside
SBA
Documents
22
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix A - Gantry Crane (Joint Base Lindsey Graham): Dated 14 September 2026, this document establishes the minimum performance, design, fabrication, installation, and test requirements for a 1-ton portable aluminum gantry crane system at Joint Base Lindsey Graham, Building 543. It includes detailed technical specifications for the crane structure, pneumatic tires, manual trolley, and electric hoist, as well as quality assurance inspection and test protocols.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix B - Gravity Roller Conveyor (Joint Base Lindsey Graham): Dated 14 September 2026, this document establishes the minimum performance, design, fabrication, installation, and test requirements for a gravity roller conveyor at Joint Base Lindsey Graham, Building 543 (CSN BCH602). It details technical specifications for rollers, frames, supports, and wheel pallets, and includes a quality assurance section with specific load and motion tests.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix C - Expandable Roller Conveyor (BCH602): Dated September 14, 2026, this document establishes the minimum performance, design, fabrication, installation, and test requirements for two expandable, flexible, gravity roller conveyors at Joint Base Lindsey Graham, Building 543. It specifies technical requirements including load capacity (200 lbs/linear foot), dimensions, expansion ratios, and mechanical characteristics for rollers, frames, and casters, and includes a quality assurance test plan.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix E - Bin Shelving (BCH602): Technical specifications for the design, fabrication, and installation of bin shelving at Joint Base Lindsey Graham, Building 506 (CSN: BCH602), dated 14 September 2026. The document details structural requirements, drawer dimensions, load capacities, and quality assurance testing procedures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix F - Pallet Rack (Joint Base Lindsey Graham Building 506): Dated 14 September 2026, this document establishes the minimum performance, design, fabrication, installation, and test requirements for pallet racks at Joint Base Lindsey Graham, Building 506 (CSN BCH602). It specifies R-Mark certification, structural requirements for uprights, seismic plates, and decking, and outlines quality assurance inspections and load testing procedures.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Appendix H - Removal of Existing Equipment (BCH602): Dated September 14, 2026, this technical appendix specifies the requirements for the demolition and removal of three government-owned mechanical-assist mobile systems at Joint Base Lindsey Graham, Building 506. It details the removal of bin shelving and racks, the handling of flooring/railing, and the reuse of parachute racks from Mobile System 3. The document includes specific configuration requirements, disposal mandates, and a quality assurance checklist for final inspection.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for BCH602 Appendix D - Mobile Storage System: Dated 14 September 2026, this document establishes the minimum performance, design, fabrication, installation, and test requirements for a mobile storage system at Joint Base Lindsey Graham, Building 506 (CSN BCH602). It details technical specifications for carriages, crank mechanisms, frames, rail systems, and elevated flooring, and includes a quality assurance section with specific functional and load tests.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for BCH602 Appendix G - Support Equipment (Joint Base Lindsey Graham): Dated 14 September 2026, this document establishes the minimum performance, design, fabrication, and installation requirements for support equipment (specifically rolling safety ladders) at Joint Base Lindsey Graham, Building 506. It details technical specifications for two types of ladders, OSHA/ANSI compliance, and quality assurance inspection/test protocols.
PDF
PDF, High priority: read this firsttechnical-proposal-questionnaire
HighAI Summary for BCH602 Technical Proposal Questionnaire - Material Handling and Storage System: A technical proposal questionnaire dated September 14, 2026, for the Material Handling and Storage System (MHSS) at Joint Base Lindsey Graham, SC (CSN: BCH602). The document requires offerors to provide typed responses and product literature for equipment including gantry cranes, gravity roller conveyors, and expandable gravity conveyors to verify compliance with contract requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bldg 506 Existing Equipment Drawing (BCH602_04): Technical drawing for Building 506 showing existing equipment. This document provides critical technical specifications and spatial layouts necessary for the procurement project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bldg 506 Layout - High Density Storage System: Technical drawing and layout for Building 506 at Joint Base Lindsey Graham, SC, detailing a High Density Storage System including power panels and mobile systems.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bldg 506 Shelving Details Drawing: Technical drawing providing detailed specifications for shelving installations in Building 506.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bldg 543 Layout and Details - Drawing BCH602-03: Technical drawing and specifications for Building 543, specifically focusing on gantry crane layouts, expandable conveyors, and material handling engineering. Dated September 2026, the document includes dimensions, material hardness (E30/EP20), and schematic details for conveyor systems and jumbo bags.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contractor Information - Joint Base Lindsey Graham (Bld 543): Dated September 29, 2026, this document provides site-specific contractor information for Joint Base Lindsey Graham, specifically Building 543. It details available services including work schedules, utility access (120V/60Hz), and facility constraints, noting that government tools and forklifts are not available. It also specifies that DOD personnel must be present at all times in the secure area.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contractor Information - Joint Base Lindsey Graham (Bldg 506): Dated September 29, 2026, this document provides site-specific contractor information for Building 506 at Joint Base Lindsey Graham. It details available government services including work schedules, office and classroom space, staging areas, and utility specifications (208Y/120V power and exterior water). It explicitly lists services not provided, such as forklifts and tools, and provides site visit contact information for Scott Palfreyman.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for DFARS RFO Deviation Clauses Over SAT: A list of DFARS Class Deviation clauses included by reference for procurements over the Simplified Acquisition Threshold (SAT). It maps specific Class Deviations (e.g., CD 2026-O0031, CD 2026-O0043) to their corresponding regulatory clauses covering topics such as whistleblower rights, antiterrorism training, Buy American requirements, and payment requests.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for FA8604-27-Q-B002 Attachment 17 - Instructions and Evaluation Addendum: Attachment 17 for solicitation FA8604-27-Q-B002 provides supplemental instructions for offerors (RFO 52.212-1) and evaluation procedures (RFO 52.212-2). It specifies the submission of three documents (cost proposal, technical proposal, and subcontracting plan) via PIEE, outlines the Lowest Price Technically Acceptable (LPTA) evaluation method, and defines the criteria for technical acceptability.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Proposal Checklist and Summary Pricing Sheet - FA8604-27-Q-B002: A proposal checklist for RFP FA8604-27-Q-B002 that outlines the mandatory requirements for both Technical and Price volumes. It specifies submission formats (PDF), organization (tabs/bookmarks), and critical documentation including Technical Proposal Questionnaires (TPQs), commercial cut sheets, delivery schedules, and insurance certificates. The document serves as a responsiveness tool to ensure offerors meet all solicitation terms, including small business set-aside rules and pricing validity.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Purchase Description - Storage Aid System (BCH602): Dated 14 September 2026, this Purchase Description (PD) establishes the minimum performance, design, fabrication, installation, and test requirements for a storage aid system at Joint Base Lindsey Graham, Buildings 506 and 543. The document specifies technical requirements for design criteria, materials, protective coatings, quality assurance, and acceptance testing, referencing Air Force Drawings BCH602-01 through BCH602-04.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQ FA8604-27-Q-B002 Storage Aids System: Request for Quote (RFQ) for the performance, design, fabrication, installation, and testing of a Storage Aids System at Joint Base Lindsey Graham, South Carolina. The solicitation is 100% set aside for small businesses (NAICS 333922) and will be evaluated based on Lowest Price Technically Acceptable (LPTA). Responses are due by January 7, 2027, via the PIEE system.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Solicitation FA860427QB002 - MMHS Storage Aid System: Solicitation for the design, manufacture, delivery, and installation of a Mechanized Materials Handling System (MMHS) Storage Aid System at Joint Base Lindsey Graham, South Carolina. The document includes a detailed CLIN schedule (Items 0001-0011) covering system design, gantry cranes, conveyor systems, shelving, pallet racks, and installation/integration services under a Firm Fixed Price arrangement.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Notification of Compliance with Contract Insurance Requirements - 27QB002: A certification form for contract FA8604-27-Q-B002 where the contractor acknowledges and agrees to maintain insurance levels and types as specified in FAR 28.307-2, including workers' compensation and subcontractor insurance proofs.
This requirement is for a mechanized materials handling system (MMHS)/storage aid system for Buildings 506 and 543, at Joint Base Lindsey Graham, South Carolina. The project encompasses the design, fabrication, installation, orientation, and testing of a storage aid system within the buildings. All work shall be performed in accordance the Cover Purchase Description (PD) document, including Appendices A-H, and Air Force (AF) Drawings BCH602-01, BCH602-02, BCH602-03 and BCH602-04. The contractor shall provide all equipment, materials, and labor necessary for the complete installation and testing of the MMHS. This includes making any required system adjustments and providing orientation to Government personnel. The contractor shall comply with all applicable laws, regulations, local zoning and permitting requirements, and referenced governmental guidance documents as specified in the PD document and appendices. The Mechanized Materials Handling System will consist of the following major components: Gantry Crane System, Manual Gravity Roller Conveyor, Expandable Roller Conveyor, Mobile Aisle - 1, Mobile Aisle - 2, Mobile Aisle - 3, Bin Shelving, Pallet Racks Type P1 through P7, Steel Decking, all types and Rolling Safety Ladders.
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.