Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Material Supply: Galvanized Steel & Precast Concrete

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract agreement involves the supply of galvanized steel components and precast concrete barrier segments for prime contractors working on Caltrans highway projects located in Ventura County. The selected provider is responsible for manufacturing steel components in accordance with ASTM A123 standards and producing precast concrete barriers, with a strict requirement to comply with Buy America and Build America regulations. The scope of work includes the delivery of all specified materials directly to the project site. The opportunity was posted on October 19, 2026, with a response deadline of November 19, 2026. Falling under NAICS code 332312, the contract is associated with the California Department of Transportation. While the performance of the work is tied to projects in Ventura County, the administrative place of performance is listed in Sacramento.

General Info

Place of Performance

Sacramento, CA, 95814, USA

Set-Aside

NONE

Documents

This scope was carved out of 07-367604.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction On State Highway In Ventura County In And Near Oxnard And Ventura From Central Avenue To 0.6 Mile North Of Victoria Avenue

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies galvanized steel components and precast barrier segments for prime contractors on Caltrans highway projects in Ventura County. Manufactures steel components galvanized per ASTM A123 and precast concrete barriers. Must comply with Buy America/Build America requirements. Delivers materials to the project site.

Similar Contracts

Same NAICS industry code

NAICS: 332312
New
Federal
Debris Boom Supply and Install at Harry S. Truman Lake Project
Solicitation # W912DQ26QA080
The U.S. Army Corps of Engineers, Kansas City District, is soliciting quotes under RFQ W912DQ26QA080 for the supply and optional installation of a debris boom system at Harry S. Truman Dam near Warsaw, Missouri. The primary objective of the approximately 2,000-foot boom is to protect the dam's tainter gates from floating debris to maintain spillway capacity and provide a visual barrier for boaters. The system must be engineered to withstand a debris field of 800 feet by 3 feet, 50 mph wind speeds, 5-foot wave heights, and a direct impact from a 100-foot log. Technical requirements include a minimum safety factor of 2.0 for design loads and 2.8 for dam face anchorage, with a strict prohibition against drilling into or under the earthen dam. All metallic components must be stainless steel or hot-dipped galvanized per ASTM standards. This is an unrestricted, full-and-open competition under NAICS 332312. The contract consists of two base line items for fabrication and delivery, with a third optional line item for installation. Performance timelines range from 180 to 300 calendar days from the date of award, with the installation option exercisable within 270 days. Award will be based on the most advantageous offer, considering price, relevant experience, and past performance. Quotes must be submitted in PDF format to the designated contracting officers by October 26, 2026, and must include a completed SF 1449, pricing, and documented project experience. Inspection will occur both at the contractor's facility and upon delivery to the project office in Warsaw, Missouri.
W071 Endist Kansas City

POSTED

about 13 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Ventura County In And Near Oxnard And Ventura From Central Avenue To 0.6 Mile North Of Victoria Avenue
Solicitation # 07-367604
Solicitation 07-367604, issued by the California Department of Transportation, is a unit-price construction project with an estimated value of 2,700,000 dollars. The project focuses on the installation of stormwater treatment Best Management Practices along Route 101 in Ventura County, spanning from Central Avenue to 0.6 miles north of Victoria Avenue in and near Oxnard and Ventura. The scope of work includes roadway excavation, asphalt concrete paving, concrete curbs and sidewalks, and the installation of drainage improvements such as Design Pollution Prevention Infiltration Areas and Gross Solids Removal Devices. Additional requirements involve landscape work, irrigation system installation, temporary traffic control, and the management of earth materials containing aerially deposited lead. The contract mandates adherence to 2025 Standard Specifications and Standard Plans, with a projected completion year of 2028. Key compliance requirements include Buy America/Build America standards for manufactured products, the use of LCPtracker Pro for electronic certified payroll records, and the payment of prevailing wages as determined by the California Department of Industrial Relations or the US Secretary of Labor, whichever is higher. Performance is subject to strict inspection standards, including a 15-day pre-activity deficiency report for planted areas and a 6,000 dollar penalty for each missing environmental product declaration. Technical specifications require all steel components to be galvanized per ASTM A123 and specific marking requirements for precast barrier segments.
Highway, Street, and Bridge Construction

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS