Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on August 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Matthews Transmission Pipeline

Closed
1577WState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in about 22 hours
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 3 hours ago

DEADLINE

in about 22 hours

AI Contract Overview

Show more

The Eastern Municipal Water District is soliciting bids for Specification No. 1577W, a public works project in the City of Menifee, California, focused on the construction of three pressurized potable water pipelines: the Matthews Pipeline, the Watson Pipeline, and the Romoland Feeder Extension. The scope includes installing these pipelines and their connections to existing infrastructure, with the Matthews Pipeline specifically crossing Metrolink and SR-74/Caltrans rights-of-way. The project requires adherence to strict technical standards, including NSF 61 and NSF 600 approval for potable water materials and compliance with Cal Osha and ADA regulations. Environmental protections are a key component, requiring a CEQA Mitigation Monitoring and Reporting Program that includes biological surveys for burrowing owls and nesting birds, as well as the development of a Paleontological Resources Impact Mitigation Program. The contract will be awarded to the lowest qualified bidder based on the total bid price. Bids must be submitted electronically via PlanetBids by September 23, 2026, and must include a 10% bid bond submitted through Surety 2000. A mandatory site walk-through is scheduled for September 3, 2026, and attendance by a company employee is required for a bid to be considered responsive. Awarded contractors must provide performance and payment bonds equal to 100% of the contract amount and submit a quality-control plan within 10 days of the notice of award. Additional requirements include providing resumes for key personnel, adhering to prevailing wage rates, and submitting various certifications, including Cal Osha compliance history and, for larger contracts, certifications regarding economic sanctions.

General Info

Eastern Municipal Water District project for three potable water pipelines in Menifee, California.

Documents

6

Matthews Transmission Pipeline - Construction Drawings, July 2026

PDF, High priority: read this firstspecifications
High

Specification No. 1577W - Matthews Transmission Pipeline

PDF, High priority: read this firstspecification
High

Specification No. 1577W Matthews Transmission Pipeline Bid Package

PDF, High priority: read this first21 pages · ifb
High

Specification No. 1577W - Matthews Transmission Pipeline NIB

PDF, High priority: read this first8 pages · ifb
High

Appendix E – CEQA Mitigation Monitoring and Reporting Program

PDF, Low prioritymitigation-monitoring-program
Low

1577W_Appendix A-D.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Construction Department of Eastern Municipal Water District
Contacts1 person available
OfficeCA, USA
Office AddressCA, USA
Contacts
Jennifer Morgenstern xContact

Full Description

Show more
Scope: SC-02: The work to be constructed primarily consists of three separate pressurized potable water pipelines, and their connections to existing pipelines: the Matthews Pipeline, the Watson Pipeline, and the Romoland Feeder Extension. The Matthews Pipeline extends from the southern side of the intersection of Antelope Road and Ethanac Road northward to the future Antelope and Watson II Booster Pump Station near the intersection of Antelope Road and Watson Road in the City of Menifee, CA. On this alignment, the Matthews Pipeline crosses the Metrolink right-of-way and SR-74/Caltrans right-of-way. The southern end of the Matthews Pipeline branches into three smaller pipelines which connect to existing water pipelines along Ethanac Road. The Watson Pipeline extends from the future Antelope and Watson II Booster Pump Station near the intersection of Antelope Road and Watson Road to the existing Watson Road Booster Pump Station site in the City of Menifee, CA. The Romoland Feeder Extension extends from the future Antelope and Watson II Booster Pump Station near the intersection of Antelope Road and Watson Road to the existing Romoland Feeder within Antelope Road.
Notes: Bid Results will be available in PlanetBids once time for receiving bids has expired.
Bid Bond: 10.00%

More opportunities from California → Construction Department of Eastern Municipal Water District

Same awarding agency

NAICS: 237110
SLED
Lindenberger Road Pipeline
Solicitation # 1588W
The Lindenberger Road Pipeline Replacement project, solicitation number 1588W, is a public works contract issued by the Construction Department of the Eastern Municipal Water District in California. The scope of work involves the installation, testing, and start-up of approximately 200 linear feet of 30-inch and 36-inch cement mortar lined and coated welded steel transmission pipeline at the intersection of Lindenberger Road and Simpson Road in the City of Menifee. Additionally, the contractor is responsible for the removal or abandonment of approximately 300 linear feet of existing 27-inch to 36-inch pipelines. The comprehensive project includes the installation of fittings, isolation valves, air/vac valves, blow-offs, corrosion monitoring systems, and all necessary trenching, backfill, and street pavement restoration, including traffic detector loops and thermoplastic striping. The contract will be awarded to the lowest qualified bidder based on the total bid price. To be considered responsive, bidders must ensure a company employee has inspected the jobsite and must submit a complete proposal package via PlanetBids by 10:00 a.m. on November 17, 2026. Required submissions include a 10 percent bid bond via Surety 2000, a signed proposal sheet, and various certifications such as the Non-Collusion Declaration and Cal OSHA Form 300A. Depending on the bid amount, Iran Contracting Act and Russia Economic Sanctions certifications may be required for bids exceeding 1 million and 5 million dollars, respectively. The contractor must adhere to prevailing wage rates, Cal OSHA Title 8 regulations, and ADA standards for access ramps. Performance and labor payment bonds equal to 100 percent of the contract amount are required upon award. Quality assurance includes pressure testing and soil density verification using sand cone or nuclear methods. The contractor is also obligated to repair any defective workmanship at their own expense for one year following the notice of completion and acceptance. Progress payments will be initiated by the District based on site meetings to determine the percentage of completion.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 21 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS