Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Tennessee was posted on August 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MBEC Water Refuse and Implementation

Closed
W- 17- 016- 201State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
DIBBS
41--FAN,VANEAXIAL
Solicitation # SPE8E9-27-T-0554
This contract is a Request for Quotations (RFQ) issued by DLA Troop Support, Construction & Equipment MRO SVC I for the procurement of nine vane axial fans, identified by NSN 4140-00-289-8885 and part number M18953-AA02WA4W6NANANA. The hardware must meet specific technical requirements, including a 440V AC three-phase power supply, a nominal air flow rate of 2000 cubic feet per minute, and clockwise rotation with outward flow. The item is designated as a critical application item and must comply with basic specification MIL-PRF-18953C(1) and quality assurance provision QAP 13873 QAP-EQ003. Additionally, the manufacturer must be Qualified Products List (QPL) approved at the time of award. Delivery is required within 318 days after order, with an original required delivery date of November 16, 2026, shipped FOB Destination to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Quality inspection will occur at the destination using sampling methods per MIL-STD-1916 or ASQ H1331, with a zero-non-conformance requirement for acceptance. Environmental restrictions prohibit the intentional use of mercury or Class I ozone-depleting chemicals. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and compliance with various FAR and DFARS clauses regarding cybersecurity, sustainable products, and small business representations.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

about 22 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract involves a comprehensive upgrade to a pump station, including the removal of existing pumps and installation of two new dry-pit submersible pumps capable of handling 1,500 gpm each. Additionally, a vertical automatic backwashing strainer will be installed in the basement to enhance filtration. The electrical systems will be upgraded with new panel boards, variable frequency drives, and a transformer to support the new equipment. HVAC improvements are also included, featuring new exhaust fans, air conditioning for the electrical room, and an air scrubber system to ensure proper ventilation and temperature control. The project further encompasses the installation and integration of new instrumentation and a Programmable Logic Controller (PLC) with the existing SCADA system, enabling effective monitoring and control of the pump station. Piping systems will be replaced with new piping designed specifically for reclaimed water service, ensuring compatibility with water reuse standards. The project is managed by the City of Chattanooga, Tennessee, with a contract value estimated between 2 and 5 million dollars, and responses are due by August 28, 2025.

Documents

5
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this first4 pages · ifb
High
PDF, High priority: read this first47 pages · amendment
High
PDF, High priority: read this firstamendment
High

Read all 5 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • FAN, TUBEAXIALOpen now, due in 11 days
  • FAN, TUBEAXIALOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTennessee → City of Chattanooga
Contacts1 person available
OfficeN/A

Full Description

Show more
Scope of Work
•Pump Replacement: Remove existing pumps and install two new dry-pit submersible pumps, each rated at 1,500 gallons per minute (gpm). •Strainer Upgrade: Install one new vertical automatic backwashing strainer in the basement with the pumps. •Electrical Systems: Provide and install new electrical equipment in existing building, including panel boards, variable frequency drives (VFDs), and a transformer. •HVAC Improvements: Install new exhaust fans, air conditioning for the electrical room, and an air scrubber system to meet specified temperature and ventilation requirements. •Instrumentation and Controls: Provide, install, and integrate new instrumentation and a new Programmable Logic Controller (PLC) system with the existing Supervisory Control and Data Acquisition (SCADA) system to monitor and control the pump station. •Piping Systems: Install new piping designed for reclaimed water service.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS