This Solicitation opportunity from Tennessee was posted on August 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
MBEC Water Refuse and Implementation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves a comprehensive upgrade to a pump station, including the removal of existing pumps and installation of two new dry-pit submersible pumps capable of handling 1,500 gpm each. Additionally, a vertical automatic backwashing strainer will be installed in the basement to enhance filtration. The electrical systems will be upgraded with new panel boards, variable frequency drives, and a transformer to support the new equipment. HVAC improvements are also included, featuring new exhaust fans, air conditioning for the electrical room, and an air scrubber system to ensure proper ventilation and temperature control. The project further encompasses the installation and integration of new instrumentation and a Programmable Logic Controller (PLC) with the existing SCADA system, enabling effective monitoring and control of the pump station. Piping systems will be replaced with new piping designed specifically for reclaimed water service, ensuring compatibility with water reuse standards. The project is managed by the City of Chattanooga, Tennessee, with a contract value estimated between 2 and 5 million dollars, and responses are due by August 28, 2025.
General Info
Place of Performance
TN, USASet-Aside
Documents
5AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- FAN, TUBEAXIALOpen now, due in 11 days
- FAN, TUBEAXIALOpen now, due in 11 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
•Pump Replacement: Remove existing pumps and install two new dry-pit submersible pumps, each rated at 1,500 gallons per minute (gpm). •Strainer Upgrade: Install one new vertical automatic backwashing strainer in the basement with the pumps. •Electrical Systems: Provide and install new electrical equipment in existing building, including panel boards, variable frequency drives (VFDs), and a transformer. •HVAC Improvements: Install new exhaust fans, air conditioning for the electrical room, and an air scrubber system to meet specified temperature and ventilation requirements. •Instrumentation and Controls: Provide, install, and integrate new instrumentation and a new Programmable Logic Controller (PLC) system with the existing Supervisory Control and Data Acquisition (SCADA) system to monitor and control the pump station. •Piping Systems: Install new piping designed for reclaimed water service.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
