This Solicitation opportunity from Tennessee was posted on July 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
MBEC Water Refuse and Implementation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves comprehensive upgrades to a pump station, including the removal of existing pumps and installation of two new dry-pit submersible pumps capable of handling 1,500 gpm each. To support these pumps, a new vertical automatic backwashing strainer will be installed in the basement. The project also encompasses electrical system enhancements, such as the provision and installation of new panel boards, variable frequency drives, and a transformer, ensuring reliable power supply and control. HVAC improvements are included to install exhaust fans, air conditioning for the electrical room, and an air scrubber system to maintain proper temperature and ventilation conditions. Additionally, new instrumentation and control systems will be integrated, featuring a PLC that connects with the existing SCADA system for real-time monitoring and operation of the pump station. The piping system will be upgraded with new piping designed specifically for reclaimed water service, completing the scope of work. The project is managed by the City of Chattanooga, Tennessee, with a solicitation posted in July 2025, and responses due by August 21, 2025.
General Info
Place of Performance
TN, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26-140 Installation of Emergency Shut Off SwitchesOpen now, due in 3 days
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 18 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
•Pump Replacement: Remove existing pumps and install two new dry-pit submersible pumps, each rated at 1,500 gallons per minute (gpm). •Strainer Upgrade: Install one new vertical automatic backwashing strainer in the basement with the pumps. •Electrical Systems: Provide and install new electrical equipment in existing building, including panel boards, variable frequency drives (VFDs), and a transformer. •HVAC Improvements: Install new exhaust fans, air conditioning for the electrical room, and an air scrubber system to meet specified temperature and ventilation requirements. •Instrumentation and Controls: Provide, install, and integrate new instrumentation and a new Programmable Logic Controller (PLC) system with the existing Supervisory Control and Data Acquisition (SCADA) system to monitor and control the pump station. •Piping Systems: Install new piping designed for reclaimed water service.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
