Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on March 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

McCLORY BIKE PATH RESURFACING

Closed
9052624State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The McClory Bike Path Resurfacing project involves the removal of the top 3 inches of existing asphalt pavement over an area of approximately 3,430 square yards. The work includes widening the existing bike path to a uniform width of 10 feet, followed by the installation of a 3-inch layer of CA-6 stone base to provide a stable foundation. This is topped with a 3-inch layer of HMA binder, which serves as an intermediate asphalt layer, and finished with a 3-inch HMA surface layer to ensure a smooth and durable riding surface. The project is scheduled for bidding with a response deadline of April 11, 2024, and is managed by the City of Lake Forest in Illinois, with the primary contact being Dan Strahan. The project falls under the NAICS code 238110, indicating it is a specialized construction effort related to highway, street, and bridge construction. The work aims to enhance the safety and usability of the bike path through resurfacing and widening, ensuring a high-quality, long-lasting surface for cyclists.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 43 days
  • 26_1123 – Hanska-MNOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → The City of Lake Forest
Contacts1 person available
OfficeN/A

Full Description

Show more
This project includes 3430 square yards of milling the top 3” of HMA Pavement, widening the existing path to 10 feet, placing 3” of CA-6 stone base, 3” HMA binder, and resurfacing with 3” HMA surface.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS