This Solicitation opportunity from Florida was posted on September 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
McIntosh GT2 Simple Cycle Gas Turbine Exhaust Expansion Joint Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Background Lakeland Electric, a division of the City of Lakeland, is seeking qualified contractors to furnish and install a replacement exhaust expansion joint assembly for the McIntosh GT2 Simple Cycle Gas Turbine. The existing expansion joint soft parts have reached the end of their service life and require replacement to ensure safe, reliable, and efficient operation of the unit. The McIntosh GT2 Unit is used for peaking operations within Lakeland Electric’s generation fleet and has a nominal rating of 120 MW with a heat rate of 9,900 Btu/KWh operating on Natural Gas. Work Details The Contractor shall provide all labor, supervision, materials, and equipment to complete the replacement of one (1) GT exhaust expansion joint. This includes: - Removal of existing joint hardware; - Installation of a new composite fabric expansion joint set; - Inspection of adjacent components; - Proper torquing of all fasteners; - Ensuring compliance with industry standards, OEM specifications, and Lakeland Electric’s safety procedures. The Contractor must also provide documentation showing demonstrated experience with gas turbine exhaust expansion joints and a detailed execution plan/schedule for the removal and replacement process. Repairs beyond the defined scope shall be performed only upon written authorization from Lakeland Electric on a time-and-materials basis. Period of Performance Work must be performed during the scheduled outage window from February 16, 2026 through March 1, 2026. Place of Performance McIntosh Power Plant, 3400 East Lake Parker Unit 5, Lakeland, FL 33805. Bidder Requirements The Contractor must comply with OSHA, NFPA, ASME standards and Lakeland Electric’s safety/environmental procedures. They are required to provide AWS-certified welders and qualified installation technicians. Additionally, they must submit proof of insurance coverage as specified in the RFP documents.
General Info
Place of Performance
FL, USASet-Aside
Documents
5AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
