Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Florida was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

McIntosh Power Plant Site Stormwater Modifications

Closed
2026-RFP-049State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; and specialized electrical and piping installations. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of September 17, 2026. The project is partially funded by the Water Infrastructure Finance and Innovation Act administered by the EPA, making it subject to the American Iron and Steel provisions, Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include DBE, SBE, MBE, WBE, SBRA, LSFA, and HUB Zone small businesses, with DBEs required to provide valid certification from recognized bodies such as the US EPA or SBA. Qualified respondents must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. This firm-fixed-price contract, with an estimated value between 1 million and 5 million dollars, involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal at an approved offshore site south of Oahu. The scope also includes vegetation clearance and revetted mole repairs, such as stone rework, filling voids with additional stone, and root removal. The period of performance is 200 calendar days from the receipt of the Notice to Proceed. The solicitation is set aside for HUBZone Small Businesses, who receive a 10 percent price evaluation preference. Award is based on the lowest responsive bid that complies with all material respects of the invitation. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act for wages, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Technical acceptance is based on third-party multi-beam hydrographic surveys and strict quality standards for stone materials. Bids must be submitted physically via commercial carrier or in-person by September 30, 2026, as electronic submissions are not permitted.
Healy Tibbitts Builders, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract pertains to modifications at the McIntosh Power Plant located on a 530-acre site in Lakeland, Florida. The plant includes various generation units such as two diesel peaking units, two simple cycle combustion turbines, six reciprocating engines, and a combined cycle natural gas unit. Certain older units in the southern part of the facility have been retired and demolished, prompting the need for significant changes to the stormwater management system. The first phase focuses on constructing two new stormwater retention ponds, which are designed to address part of the system’s required updates. This work will be executed under a lump sum pricing model for the West and Admin Pond construction as outlined in the bid pricing sheet. The project is being solicited by the Engineering department of the City of Lakeland and is identified by solicitation number 2026-RFP-049, with a response deadline of June 19, 2026. The scope specifically covers the construction of the ponds authorized under an Environmental Resource Permit, although not all modifications to the overall stormwater system are included in this phase. Primary points of contact for the project include a Chemical Engineer and a Purchasing Agent from the city, providing technical and procurement support. The work will be performed in Florida, with coordination managed through the City's procurement portal.

General Info

Construct two stormwater retention ponds at McIntosh Power Plant, Lakeland, under lump sum contract.

Agency

Florida → LE - EngineeringView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

(16)

Indemnification Agreement 2026 Vendor City of Lakeland

DOCcontract-document

Human Trafficking Affidavit for City of Lakeland Contract Compliance

DOCX1 pageaffidavit

2026-RFP-049 McIntosh Power Plant Site Stormwater Modifications

PDFrfp

Attachment H Bid Pricing Sheet - Stormwater Pond Construction

XLSXbid-pricing-sheet

City of Lakeland Standard Contract Form 2026

PDFcontract-document

Attachment_F_McIntosh_Underground-_Old_Admin_Area.pdf

PDF

Indemnification Agreement for Consultant Services 2026

DOCcontract-document

Attachment G McIntosh ACOE NWP7 Relevant Sections

PDFcontract-document

Indemnification Agreement for Consultant Services 2026 - City of Lakeland

DOCXcontract-document

Indemnification Agreement 2026 Contractor City of Lakeland

DOCcontract-document

FW8287 McIntosh Power Plant Demolition Construction Plans December 2025

PDFconstruction-plans

McIntosh Pond Construction RFP - Specification with Terms and Conditions

PDFrfp

Indemnification Agreement 2026 Contractor FDOT

DOCXcontract-document

Attachment D Current Project Phase Area for Bid

PDFother

Contractor Annual Audit Form

PDFother

Contractor Safety Evaluation Form

PDFother

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → LE - Engineering
Contacts2 people available
OfficeLakeland, FL, 33801, USA
Organization / Agency
Florida → LE - Engineering
View Agency Profile
Office AddressLakeland, FL, 33801, USA
Contacts
Thomas JohnstonChemical Engineer
Linda AlspaughPurchasing Agent

Interested Companies (39)

Show more
Roggen Clyne Development
Lakeland, FL
Harris-McBurney
TAMPA, FL
Lincoln Surety Group
Sarasotat, FL

See All 39 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The McIntosh Power Plant and associated facilities are located on a 530-acre property at 3030 East Lake Parker Drive in Lakeland, Polk County, Florida. The MPP facility has generation capacity consisting of multiple units including two diesel peaking units, two simple cycle combustion turbines, six reciprocating engines and a combined cycle natural gas unit (Unit No. 5). The southern section of the facility previously held additional generating unit (units 1, 2, and 3) which have since been retired and demolished. The overall stormwater management system subsequently requires significant modification as a result of these changes, not all of which are covered by this project. For the first phase of this project an Environmental Resource Permit was obtained to build two new stormwater retention ponds. The construction of these ponds and their associated features are the scope of this project. The project will be delivered under a lump sum pricing structure for the West and Admin Pond Attachment N Bid Pricing Sheet Stormwater Pond Construction

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS