Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on July 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MDSO Headquarters Chillers and Laboratory Exhaust Fans

Closed
MCC 7360 RPQ PDC-W20028-RState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
DIBBS
41--FAN,VANEAXIAL
Solicitation # SPE8E9-27-T-0554
This contract is a Request for Quotations (RFQ) issued by DLA Troop Support, Construction & Equipment MRO SVC I for the procurement of nine vane axial fans, identified by NSN 4140-00-289-8885 and part number M18953-AA02WA4W6NANANA. The hardware must meet specific technical requirements, including a 440V AC three-phase power supply, a nominal air flow rate of 2000 cubic feet per minute, and clockwise rotation with outward flow. The item is designated as a critical application item and must comply with basic specification MIL-PRF-18953C(1) and quality assurance provision QAP 13873 QAP-EQ003. Additionally, the manufacturer must be Qualified Products List (QPL) approved at the time of award. Delivery is required within 318 days after order, with an original required delivery date of November 16, 2026, shipped FOB Destination to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Quality inspection will occur at the destination using sampling methods per MIL-STD-1916 or ASQ H1331, with a zero-non-conformance requirement for acceptance. Environmental restrictions prohibit the intentional use of mercury or Class I ozone-depleting chemicals. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and compliance with various FAR and DFARS clauses regarding cybersecurity, sustainable products, and small business representations.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

1 day ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract involves comprehensive mechanical upgrades at the Miami-Dade Sheriff's Office Headquarters in Doral, Florida, requiring the contractor to secure all necessary permits before commencing work. The primary scope includes the overhaul of the central energy plant, which involves replacing two 350-ton chillers, installing a new 700-ton cooling tower, and upgrading associated piping, pumps, valves, and controls, while decommissioning and abandoning the existing 500-ton chiller in place. Additionally, the project entails replacing existing laboratory exhaust fans and removing any unnecessary roof penetrations, ensuring all work is performed with proper materials, labor, supervision, and equipment as specified in the bid documents. The contractor must also handle the removal and disposal of debris, leaving the site clean upon completion. The bid price must encompass the entire scope of work, including electrical and mechanical requirements, and the contractor is responsible for verifying site conditions and clarifying any uncertainties during the bidding process. The project is valued between one and five million dollars, with a response deadline set for August 13, 2025, and is managed by Miami Dade County Strategic Procurement.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • FAN, TUBEAXIALOpen now, due in 11 days
  • FAN, TUBEAXIALOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Miami Dade County Strategic Procurement
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope of Work: (Contractor must obtain and submit all permits prior to performing any work). The scope of work consists of the replacement of the mechanical equipment identified in the bid documents for the Miami-Dade Sheriff's Office (MDSO) Headquarters Building located at 9105 NW 25th Street, Doral, FL 33172. The bidder shall examine the site carefully to determine the scope of work and satisfy him/herself as to all observable conditions. Any questions regarding materials or obstacles that might be expected must be clarified during the bidding period. The bid price shall include the scope of work in its entirety including the removal and proper off-site disposal of all work-related debris and always be left in a broom clean condition. The Scope of Work as defined by the Contract Documents includes, furnishing materials, labor, services, supervision, tools, equipment, and all other items necessary for the successful completion of the project but is not limited to, the following: 1. Chiller Plant: Overhaul of the existing central energy plant including replacement of two (2) 350 ton chillers, the existing 500 ton chiller to remain in place; replace three pumps, install new 700 ton cooling tower cooling tower and piping, four (4) chilled water pumps, isolation valves, existing cooling tower shall be decommissioned and abandoned in-place, new controls, replace existing mechanical piping within chiller plant, and all associated electrical requirements and other work indicated in the Contract Documents. 2. Lab Fans: Replace existing lab exhaust fans, remove unnecessary roof penetrations, other work indicated in the contract documents.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS