This Solicitation opportunity from Department Of Defense was posted on September 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
MEARNG F550 Emergency Light Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Maine Army National Guard requires a contractor to perform the professional installation and integration of a government-furnished emergency response lighting system and battery charging system on a government-owned Ford F-550 Vehicle Mounted Radiation Detection System. The scope of work includes installing a Whelen Inner Edge light assembly, a Whelen Core and Controller unit, various body, slim, and trio lights, and a Kussmaul battery tender with an auto-eject shore power connection. The contractor is responsible for providing all necessary personnel, tools, and expertise to ensure all wiring is properly routed and secured, followed by a functional test in the presence of a government representative and the restoration of any vehicle damage caused during installation. This small business set-aside solicitation, numbered W912JD26QA025, is categorized under NAICS 811111. The work must be performed at the contractor's installation facility and completed within a one-week period of performance, specifically scheduled from October 5, 2026, to October 8, 2026. Interested parties must submit a completed SF 1449 and a technical proposal by the deadline of September 16, 2026. The contract is a firm-fixed-price arrangement and adheres to Department of Labor Service Contract Act wage determinations for the state of Maine.
General Info
Place of Performance
Augusta, ME, 04330, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Amendment 0003 - Issued 9-14-2026 - Respond to questions raised by various interested parties.
Amendment 0002 - Issued 9-8-2026 - Respond to questions raised by various interested parties.
Amendment 0001 - Issued 9-2-2026 - Respond to questions raised by various interested parties.
The Maine Army National Guard (MEARNG) requires the professional installation of a complete, government-furnished, emergency response vehicle police-style flashing light system and a battery charging system onto a Government-owned Ford F-550 Vehicle Mounted Radiation Detection System (VMRDS). The contractor shall provide all necessary personnel, tools, materials (excluding specified government-furnished equipment), and expertise to complete the installation.
Scope of Work:
The contractor is required to perform the following installations and integrations on the Ford F-550 vehicle:
-
Equipment Installation: Install all Government-Furnished Equipment (GFE) at specified locations. This includes a Whelen Inner Edge light assembly, a Whelen Core and Controller unit, and various Whelen body, slim, and trio lights.
-
System Integration: Professionally integrate all lighting components with the central controller. All wiring must be routed, secured, protected with grommets where necessary, and concealed appropriately.
-
Power System Installation: Install one Kussmaul battery tender complete with an auto-eject shore power connection to charge the vehicle's batteries.
-
Functional Testing: Conduct a full functional test of the integrated lighting system and the power system in the presence of a Government representative to demonstrate proper functionality.
-
Vehicle Restoration: Upon completion, repair any damage to the vehicle resulting from installation activities and ensure all work areas are cleaned of debris, materials, and tools.
Government Furnished Equipment (GFE): The Government will provide the following major components for installation:
-
One (1) Whelen Inner Edge light assembly
-
One (1) Whelen Core and Controller unit
-
Two (2) Whelen slim lights (for front grill)
-
Eight (8) Whelen body lights
-
Two (2) Whelen trio lights
-
Two (2) Whelen slim lights (for front fenders)
-
One (1) Kussmaul battery tender
Contractor Requirements:
-
Provide all personnel, equipment, tools, materials (except GFE), and supervision.
-
Ensure all employees possess the required skillsets or licensing to install the lighting system according to manufacturer specifications.
-
The place of performance will be the contractor's installation facility.
-
The period of performance for the installation shall not exceed one week.
Period of Performance: The work must be completed within one (1) week from the start date.
Questions: May be submitted to the points of contact below. The due date for questions is 09SEP2026.
Submission Instructions:
All quotes must be submitted via email to the Contract Specialist, Thomas J. Ryan, at thomas.j.ryan36.civ@army.mil and the Contracting Officer, Darlene Howes, at darlene.r.howes.civ@army.mil. Quotes must include a completed SF 1449 and a separate Technical Proposal responding to the evaluation criteria outlined in the FAR 52.212-1 and 52.212-2 Addenda.
More opportunities from Department Of Defense → W7NC Uspfo Activity Me Arng
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
