Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from North Carolina was posted on July 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mechanical and Piping Engineering Design

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP #27-035 Hydraulic Modeling & system Analysis Program
Solicitation # 27-035
The City of Albany, Georgia, is soliciting competitive sealed proposals under RFP #27-035 for a qualified firm to develop and implement a comprehensive hydraulic modeling and system analysis program for its water distribution system. The primary objective is to create a fully functional model that the City can maintain internally for operations, planning, and emergency response without ongoing consultant reliance. The scope includes system analysis for pressures, fire flow, storage, pumping, outages, future growth, and capital improvement planning. To ensure platform independence, the final model must be delivered in its native software format as well as an EPANET-compatible format. Proposals must be submitted by 5:00 PM on November 23, 2026, to the Procurement Division in Albany, Georgia. Submissions must include one original and six copies on company letterhead, signed by an authorized official, and accompanied by a Certificate of Non-Collusion, a Governing Law and Venue form, and an Addendum Acknowledgement Form. Award will be based on a weighted evaluation of experience and qualifications (35%), project approach and understanding (30%), references and portfolio (25%), and a detailed fee proposal (10%). The selected contractor must maintain liability insurance of at least $1,000,000 per occurrence and $2,000,000 annual aggregate, as well as workers compensation and employers liability of at least $1,000,000. Compliance with the Georgia Security and Immigration Compliance Act and the Federal Work Authorization Program is required. Payment terms are Net 30, and the contract is subject to multi-year contract clauses pursuant to OCGA 36-60-13. All equipment provided must be the latest model and composed of new parts, with the City reserving the right to reject any materials that do not meet specifications.
City of Albany

POSTED

about 6 hours ago

DEADLINE

in 26 days
NAICS: 541330
New
SLED
ON-CALL STRUCTURAL ENGINEERING SERVICES
Solicitation # 26/27-15
The Town of Manchester, Connecticut, is soliciting proposals for on-call structural engineering services to support the review, analysis, inspection, and design of municipal infrastructure on an as-needed basis. The scope of work includes preparing structural calculations for traffic control signals and light-pole loading, designing foundations and retaining walls, and performing inspections of mast arms and span poles. All work must be supervised by a Professional Engineer licensed in the State of Connecticut. The contract is expected to begin in November 2026 and run through December 31, 2027, with options for three additional one-year extensions. Annual price adjustments will be based on the U.S. Bureau of Labor Statistics Consumer Price Index. Proposals are due by November 5, 2026, and will be evaluated using a points-based system focusing on demonstrated experience (30%), hourly pricing (30%), the quality and thoroughness of the proposal (20%), and the qualifications of key personnel (20%). The Town reserves the right to shortlist firms for interviews and negotiate final terms. Required submission documents include a current IRS Form W-9, FEIN/EIN, SAM number, and a Living Wage Certification. Under the Manchester Living Wage Ordinance, covered employers with contracts valued at $25,000 or more per fiscal year must pay eligible employees either $18.25 per hour with health benefits or $26.70 per hour without. Additionally, contractors must maintain insurance from an A.M. Best rated A-/VIII company, naming the Town as an additional insured.
Engineering

POSTED

about 6 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

This subcontract for Mechanical and Piping Engineering Design, issued by the UNC System Office Design/Construction in North Carolina, focuses on the detailed design of a steam piping system. The scope of work encompasses the planning of system routing, the specification of supports and expansion joints, and the design of insulation and integration with the existing campus network. The solicitation was posted on July 29, 2024, with a response deadline of August 20, 2024. Classified under NAICS code 541330, the project requires specialized engineering expertise to ensure the steam infrastructure is properly integrated and functional within the university environment.

General Info

UNC System Office subcontract for mechanical and piping design of steam piping systems.

Documents

This scope was carved out of 287-24-28461-01.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Design-Build Services for Columbia Street Steam Tunnel Replacement - Science Complex to MacNider

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → UNC System Office Design/Construction
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Detailed design of steam piping system including routing, supports, expansion joints, insulation, and integration with campus network.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS